Under HSE HSG76 Warehousing and Storage, SEMA Racking Code of Practice, PUWER 1998, and LOLER 1998 (L117), duty holders must conduct weekly visual inspections and annual expert examinations of pallet racking systems to identify forklift truck (FLT) impact damage, structural deformation, and load-bearing compromise. Competent persons must immediately isolate damaged uprights, beams, or bracing exceeding SEMA traffic-light damage thresholds (red/amber), prohibit loading, and arrange certified repair or replacement to reduce catastrophic collapse risk from High (15-25) to Low (1-6). This SOP establishes a systematic inspection protocol covering pre-use checks, damage classification using SEMA colour-coded criteria, load de-rating calculations, temporary propping procedures, and escalation to SEMA-approved rack inspectors (SARI). The procedure integrates photographic evidence capture, defect tagging (red/amber/green), permit-to-load controls, and maintenance records retention (minimum 2 years) to demonstrate compliance during HSE enforcement visits and satisfy PQQ/tender safety management system audits for logistics, warehousing, and distribution contractors.
| Identified Hazard & Harm | Initial Risk (L×S) | Mandatory Engineering, Isolation & Procedural Controls | Residual Risk |
|---|---|---|---|
| 1. Catastrophic racking collapse due to undetected FLT impact damage to uprights or beams Harm: Multiple fatalities, crush injuries, burial under palletised loads (up to 1000 kg per pallet position), and secondary injuries to warehouse operatives | 5 × 5 = 25 | Implement weekly visual inspections by trained competent persons using SEMA traffic-light system (red = immediate unload, amber = monitor/reduce load, green = acceptable). Conduct annual SEMA-approved rack inspector (SARI) examinations per HSG76 Section 5. Install column guards and end-of-aisle barriers to prevent FLT impact. Enforce 'report all impacts' culture with incident logging. Immediately isolate and de-rate damaged bays, apply red prohibition tags, and arrange certified repair by SEMA-approved contractor. Maintain photographic defect register and repair records for minimum 2 years (LOLER 1998 L117 para 269). | 2 × 3 = 6 |
| 2. Struck-by moving forklift trucks (FLT) during aisle inspection activities in live warehouse operations Harm: Fatal or life-changing crush injuries, traumatic amputation, or multiple fractures from impact with 2-5 tonne FLT | 4 × 5 = 20 | Establish segregated inspection zones with physical barriers and 'Inspection in Progress' signage. Conduct inspections during low-activity periods or planned downtime where practicable. Wear Class 2 hi-vis PPE (BS EN ISO 20471) and maintain constant situational awareness. Coordinate with warehouse supervisor to implement temporary traffic management (one-way systems, reduced speed zones). Use audible warning devices and ensure FLT operators are briefed on inspection schedule. Deploy banksman/spotter for high-traffic aisles. Prohibit inspections during peak loading/unloading operations unless area is fully isolated. | 2 × 4 = 8 |
| 3. Falling palletised loads from damaged or overloaded racking during inspection Harm: Fatal head injuries, crush injuries, or burial under collapsed stock (individual pallets may exceed 1000 kg) | 4 × 5 = 20 | Never walk directly beneath loaded racking during inspection. Inspect from aisle positions using telephoto camera or binoculars for upper beam levels. Verify load notices (SWL/UDL) are displayed and not exceeded per SEMA Section 9. Immediately prohibit loading of bays with visible beam deflection >L/200, upright out-of-plumb >H/300, or any red-category damage. Use mobile elevated work platforms (MEWP) with edge protection for close inspection of upper levels (LOLER 1998 compliant). Enforce mandatory safety helmet use (BS EN 397) in all racking aisles. Ensure all pallets are shrink-wrapped or banded to prevent individual item fall. | 2 × 4 = 8 |
| 4. Manual handling injuries during measurement, tagging, or temporary propping of damaged racking components Harm: Musculoskeletal disorders (MSDs), back strain, or acute soft tissue injuries from lifting/positioning heavy steel props or beams | 4 × 3 = 12 | Conduct task-specific manual handling risk assessment per HSE Manual Handling Operations Regulations 1992 (as amended). Use mechanical aids (pallet trucks, lifting trolleys) for transporting inspection equipment and temporary props. Employ two-person lift protocol for any component >25 kg. Provide adjustable acrow props or hydraulic jacks for temporary support rather than manual lifting. Train inspectors in correct lifting technique (kinetic handling) and encourage use of long-handled tools to minimise bending/reaching. Ensure adequate lighting (minimum 200 lux in aisles) to prevent trips/slips during equipment handling. | 2 × 2 = 4 |
| 5. Inadequate defect identification leading to continued use of structurally compromised racking (competence failure) Harm: Progressive structural failure, delayed collapse during loading operations, and failure to comply with PUWER 1998 Regulation 5 (maintenance) and LOLER 1998 Regulation 9 (thorough examination) | 4 × 4 = 16 | Ensure all inspectors complete SEMA-approved racking inspection training (SARI or equivalent) and hold certification evidence. Provide laminated SEMA traffic-light damage classification cards for field reference. Implement peer review of amber/red findings by second competent person before load prohibition decisions. Engage SEMA-approved rack inspector (SARI) for annual thorough examination per HSG76 para 5.3 and LOLER 1998 Schedule 1. Maintain competency matrix and refresher training records (3-year cycle). Establish clear escalation procedure: green = continue use, amber = reduce load + monitor weekly, red = immediate unload + isolate + repair. Document all decisions in bound inspection register with photographic evidence. | 2 × 3 = 6 |
Retrieve site-specific racking layout plans showing aisle designations, bay numbering system, and load configurations. Obtain manufacturer's load notices (SWL/UDL per beam level) and verify they are displayed at end-of-aisle positions per SEMA Section 9. Review previous inspection reports, defect registers, and repair records (minimum 2-year retention per LOLER 1998). Confirm competency certification (SARI or equivalent) is current. Conduct toolbox talk with warehouse supervisor to agree inspection schedule, traffic management, and emergency stop procedures. Don mandatory PPE (hi-vis, safety helmet, safety footwear, cut-resistant gloves per BS EN standards). Calibrate/check laser measurer and camera timestamp function. Prepare SEMA traffic-light checklist and defect tags (red/amber/green).
Begin at designated start point (typically Aisle 1, Bay 1) and work systematically. Inspect each upright base plate for corrosion, distortion, or missing floor anchor bolts. Use torque wrench to verify anchor bolt tension (manufacturer specification, typically 150-200 Nm). Check upright verticality using laser measurer – maximum out-of-plumb tolerance H/300 (e.g., 20mm over 6m height). Examine upright front faces for FLT impact damage: measure depth of any dents/deformation. Apply SEMA traffic-light criteria: GREEN = <3mm dent depth, AMBER = 3-6mm (reduce load 50%, monitor weekly), RED = >6mm or visible tearing/cracking (immediate unload and isolate). Photograph all amber/red findings with bay number visible. Check column guards are intact and securely fixed. Record findings on checklist with aisle/bay reference.
Inspect each beam level from ground to top. Check beam-to-upright connectors (typically hook-in or bolted) are fully engaged with no visible lifting or distortion. Measure beam deflection under load using laser sight-line or string-line method – maximum permissible deflection L/200 (e.g., 13.5mm over 2700mm beam span). Apply SEMA criteria: GREEN =
Cross-reference actual pallet weights and configurations against manufacturer's load notice (displayed at aisle end per SEMA Section 9). Check for common overloading scenarios: excessive pallet overhang (max 50mm per side), double-stacking of pallets in single positions, or storage of loose/unbanded items. Verify uniform load distribution (UDL) is maintained – concentrated point loads can cause localised beam failure. Inspect for incompatible storage (e.g., long items protruding into aisles, creating FLT strike risk). Check that load notices are legible, undamaged, and show: beam levels, load per level, load per bay, and total bay capacity. If load notice is missing, faded, or damaged, issue amber finding and arrange replacement (racking must not be used without valid load notice per PUWER 1998 Reg 5).
For each identified defect, apply appropriate colour-coded tag: GREEN (acceptable, no action), AMBER (monitor/reduce load, re-inspect within 7 days), RED (immediate unload, isolate, prohibit use). Attach tags at eye level on affected upright or beam. Photograph each amber/red defect with: bay number visible, measuring device showing dimension, and wide-angle context shot. Record in bound inspection register: date, time, aisle/bay reference, defect description, SEMA classification, immediate action taken, and inspector signature. For RED findings, immediately cordon bay with barrier tape and erect 'DO NOT LOAD – DANGEROUS STRUCTURE' signage. Notify warehouse manager and arrange emergency unloading (if loaded) using safe system of work (e.g., remote FLT operation, exclusion zone). For AMBER findings, calculate and display reduced load capacity (typically 50% de-rating) and schedule re-inspection.
Compile formal inspection report containing: site details, inspection date/time, inspector name and certification, summary of findings (green/amber/red counts), photographic evidence appendix, and recommended actions with timescales. Escalate all RED findings to senior management and client (if contractor) within 24 hours. Issue amber findings to maintenance team with 7-day re-inspection requirement. For structural repairs, engage only SEMA-approved racking contractor – never attempt field repairs using non-OEM components or welding (voids manufacturer warranty and LOLER compliance). Obtain repair certification and photographic evidence of completed works. Update defect register and file report in site safety file (minimum 2-year retention per LOLER 1998 L117). Schedule next routine inspection (weekly visual, annual SARI thorough examination per HSG76 para 5.3). Brief warehouse operatives on findings and any revised load restrictions at next shift handover.
In the event of racking collapse, partial failure, or falling load incident: (1) Activate site emergency alarm and evacuate all personnel from affected aisle and adjacent bays immediately – do not attempt rescue if secondary collapse risk exists; (2) Call 999 (emergency services) if personnel are trapped, injured, or buried under collapsed stock – request Fire & Rescue Service for technical rescue capability and Ambulance Service for trauma care; (3) Implement emergency muster and roll-call to confirm all personnel accounted for; (4) Isolate electrical services to affected area if racking has impacted overhead lighting, sprinkler systems, or building structure; (5) Establish 10-metre exclusion zone around collapsed/damaged racking and post sentries to prevent re-entry; (6) Preserve incident scene for HSE investigation (RIDDOR reportable under Regulation 3(1) if collapse causes injury requiring >7 days absence or is a 'dangerous occurrence' per Schedule 2 Part IV); (7) Administer first aid for crush injuries, fractures, or traumatic wounds using site-trained first aiders (minimum HSE-approved Emergency First Aid at Work certification) – prioritise airway, breathing, circulation (ABC) and control catastrophic haemorrhage using tourniquets or haemostatic dressings; (8) Do NOT move casualties with suspected spinal injuries unless immediate life threat (fire, further collapse) exists; (9) Notify HSE via online F2508 form or telephone 0345 300 9923 within 10 days for >7-day injury, immediately for fatality or dangerous occurrence; (10) Engage structural engineer and SEMA-approved inspector to assess building and remaining racking integrity before permitting re-entry or salvage operations. Maintain incident log, witness statements, and photographic evidence for HSE investigation and insurance claim. Review and update risk assessment and inspection frequency following any collapse or near-miss event (HSE HSG76 para 5.5).
| Operative / Supervisor Name | Trade / Role & CSCS No. | Signature | Date & Time |
|---|---|---|---|
| 1. (Site Supervisor): | |||
| 2. | |||
| 3. | |||
| 4. |