Under PUWER 1998 Regulation 22, Supply of Machinery (Safety) Regulations 2008, BS EN ISO 12100, HACCP food safety principles, and Weights & Measures Act 1985, employers must ensure Bizerba GLM-Ievo checkweigher metal detector combination equipment is maintained, guarded, and operated with documented isolation procedures (LOTO), pre-use verification, and traceability controls to reduce risk from High (15-20) to Low (3-4) through engineering controls and competent person supervision. This SOP establishes mandatory operational sequences, emergency stop verification, metal detection sensitivity testing, weight calibration protocols, and hygiene standards for food production environments. Compliance with HSG245 requires incident investigation procedures and maintenance records retention for statutory inspections. All operators must complete manufacturer-specific training and demonstrate competence in changeover, cleaning, and fault diagnosis procedures before unsupervised operation.
| Identified Hazard & Harm | Initial Risk (L×S) | Mandatory Engineering, Isolation & Procedural Controls | Residual Risk |
|---|---|---|---|
| 1. Entanglement in moving conveyor belts, drive rollers, and reject mechanism during operation or cleaning Harm: Crush injuries, fractures, degloving injuries, amputation of fingers/hands; potential fatal entrapment if clothing caught in unguarded nip points | 4 × 5 = 20 | Install and maintain BS EN ISO 14120 compliant fixed guards on all drive mechanisms. Implement LOTO procedure per BS EN ISO 14118 before any cleaning or adjustment. Fit emergency stop buttons at operator stations per BS EN ISO 13850. Provide two-hand control for manual reject clearance. Prohibit loose clothing, jewellery, and unsecured long hair. Conduct daily pre-start guard integrity checks with documented sign-off. Install presence-sensing safety devices (light curtains) on access points per BS EN 61496. | 2 × 3 = 6 |
| 2. Electrical shock from 230V/400V supply during maintenance, cleaning, or fault investigation Harm: Electric shock causing cardiac arrest, severe burns, secondary fall injuries; potential electrocution fatality in wet production environments | 3 × 5 = 15 | Ensure equipment installed by competent electrician per BS 7671 (IET Wiring Regulations) with RCD protection (30mA trip). Implement permit-to-work and LOTO isolation of electrical supply at distribution board before panel access. Verify dead using approved voltage detector per GS38. Maintain IP65 ingress protection rating on all electrical enclosures. Conduct PAT testing every 6 months per IET Code of Practice. Only permit authorised electrical personnel (BS 7671 qualified) to access control panels. Display warning labels per BS EN 61310-1. | 1 × 4 = 4 |
| 3. Manual handling injuries during product loading, reject bin emptying, and equipment adjustment Harm: Musculoskeletal disorders (MSDs) affecting lower back, shoulders, and upper limbs; acute strains, chronic repetitive strain injuries | 5 × 3 = 15 | Conduct task-specific manual handling risk assessment per HSE Manual Handling Operations Regulations 1992 and HSG245. Adjust conveyor height to operator waist level (900-1100mm) to minimise bending. Implement maximum reject bin weight limit of 15kg with clear labelling. Provide mechanical handling aids (trolleys, bin tippers) for reject disposal. Rotate operators every 2 hours to reduce repetitive strain. Train all operators in safe lifting techniques (kinetic handling method). Install height-adjustable workstations and anti-fatigue matting. | 3 × 2 = 6 |
| 4. Food contamination from metal detector failure, calibration drift, or foreign body ingress Harm: Consumer injury from metal fragments in food products; product recall, prosecution under Food Safety Act 1990, reputational damage, business closure | 4 × 4 = 16 | Implement HACCP Critical Control Point (CCP) monitoring with documented test piece verification at start of production, after every product changeover, and every 30 minutes during operation. Maintain calibration records traceable to UKAS standards per Weights & Measures Act 1985. Set automatic reject verification system to alarm if 3 consecutive products fail detection. Conduct weekly sensitivity testing using manufacturer test pieces (ferrous 2.5mm, non-ferrous 3.0mm, stainless 3.5mm). Implement automatic line stop if metal detector fails self-test. Maintain equipment per manufacturer schedule (minimum quarterly preventive maintenance). Seal and quarantine all products produced since last successful test if failure detected. | 2 × 3 = 6 |
| 5. Noise exposure from conveyor motors, reject mechanisms, and alarm systems in production environment Harm: Noise-induced hearing loss (NIHL), tinnitus, acoustic trauma; reduced communication ability leading to secondary safety incidents | 5 × 3 = 15 | Conduct noise assessment per Control of Noise at Work Regulations 2005 to establish exposure levels. If equipment exceeds 80dB(A) LEP,d, designate hearing protection zone with mandatory signage per BS EN ISO 7010. Provide Class 4 or 5 hearing protection (BS EN 352-1 earplugs or BS EN 352-3 earmuffs) achieving minimum 25dB SNR. Implement engineering controls: install acoustic enclosures on motors, fit vibration damping mounts, use low-noise reject systems. Schedule maintenance to address worn bearings and misaligned components. Conduct annual audiometric surveillance for operators exposed >85dB(A). Limit continuous exposure duration and provide quiet break areas. | 3 × 2 = 6 |
Complete documented pre-start checklist: verify all guards are in place and secured per BS EN ISO 14120; test emergency stop buttons at all operator stations (must achieve full system stop within 2 seconds per BS EN ISO 13850); check conveyor belt condition for damage, wear, or contamination; verify reject bin is empty and correctly positioned; confirm all warning labels are legible; check floor area is clear of trip hazards and spillages. Review previous shift handover log for any reported faults or maintenance issues. Ensure LOTO devices have been removed by authorised person and isolation keys returned to control. Do not proceed if any defects identified – report immediately to engineering supervisor and tag equipment 'DO NOT OPERATE'.
Access equipment control panel and initiate self-test sequence per manufacturer instructions. Using manufacturer-supplied test pieces, pass ferrous (2.5mm), non-ferrous (3.0mm), and stainless steel (3.5mm) spheres through metal detector aperture at normal production speed. Verify automatic reject system activates for each test piece and products are diverted to reject bin. Record results on HACCP CCP monitoring sheet with date, time, operator signature, and pass/fail status. Conduct checkweigher calibration using UKAS-traceable test weights spanning production range (e.g., -10g, nominal, +10g from target weight). Adjust sensitivity or reject limits only if authorised and trained – document any adjustments in equipment logbook. If any test fails, isolate equipment, inform supervisor, and initiate corrective action procedure.
Load products onto infeed conveyor ensuring consistent spacing and orientation per product specification. Monitor HMI display for real-time weight data, metal detection status, and reject counts. Maintain production speed within manufacturer-specified range (typically 30-120 products/minute depending on product size). Observe conveyor tracking – belt should run centrally without deviation. Listen for abnormal noises indicating bearing wear or misalignment. Conduct in-process verification tests every 30 minutes using test pieces and record on CCP monitoring sheet. Check reject bin level every hour and empty when 75% full using correct manual handling technique. Investigate any increase in reject rate immediately – may indicate equipment drift, product variation, or contamination issue. Never reach into moving equipment – use emergency stop if intervention required.
Press emergency stop to halt production. Allow all in-process products to clear system or manually remove using safe retrieval method. Access HMI and select new product recipe from validated library (do not create ad-hoc settings). Adjust conveyor height, guide rails, and reject gate settings per product specification using provided tools – never use makeshift implements. If physical changeover parts required (different size aperture plates, guide rails), implement LOTO isolation before accessing guarded areas. Clean all product contact surfaces using food-grade sanitiser per BS EN 1672-2 and site hygiene procedures. Conduct full metal detector sensitivity test and checkweigher calibration verification with new product parameters. Run trial batch of minimum 10 products and verify correct operation before resuming full production. Document changeover completion time and operator signature in production log.
Complete production run and press emergency stop. Remove all remaining products from conveyor system. Implement LOTO isolation procedure: switch main isolator to OFF position, apply personal padlock and danger tag, verify zero energy state, retain key. Remove accessible guards (only those designed for tool-free removal per BS EN ISO 14120). Clean all product contact surfaces using approved food-grade detergent and sanitiser – follow site chemical COSHH assessments. Use soft brushes and cloths only – never use abrasive materials that may damage surfaces or create harbourage points. Pay particular attention to crevices, belt edges, and reject chute areas. Use compressed air at maximum 30 PSI for drying (wear eye protection). Inspect belt condition and report any damage. Replace guards and remove LOTO devices only when cleaning complete. Complete cleaning record sheet with operator signature and supervisor verification.
If equipment alarm activates or abnormal operation detected, immediately press emergency stop button. Do not attempt to reset or override without identifying root cause. Common faults: metal detector sensitivity drift (requires recalibration by trained technician), checkweigher load cell error (check for product buildup or mechanical obstruction), conveyor tracking fault (requires tension adjustment by maintenance), reject mechanism jam (clear using LOTO isolation only). For electrical faults (control panel errors, motor failure), implement permit-to-work and summon qualified electrician – do not attempt DIY repairs. Document all faults in equipment logbook including time, symptoms, actions taken, and resolution. If fault cannot be resolved within 15 minutes, inform production supervisor and implement contingency plan (manual inspection, alternative equipment). For injuries, activate site emergency procedures, administer first aid, preserve scene for HSG245 investigation, and report per RIDDOR 2013 if applicable (>7 day absence, specified injury, dangerous occurrence).
In the event of an emergency involving the Bizerba GLM-Ievo checkweigher metal detector combo, immediately activate the emergency stop button to halt all motion. For entrapment injuries, DO NOT attempt to reverse equipment as this may cause further harm – isolate electrical supply at the main distribution board and summon emergency services by dialling 999. Trained first aiders should attend to casualties while preserving the incident scene for investigation per HSG245. For electrical shock incidents, do not touch the casualty until power is confirmed isolated – use a non-conductive implement to break contact if safe to do so, then commence CPR if qualified and required. For minor cuts or abrasions from sharp edges, wash wound with clean water, apply sterile dressing, and record in accident book per RIDDOR 2013 requirements. All injuries resulting in >7 day absence, specified injuries (fractures, amputations, crush injuries), or dangerous occurrences (failure of load-bearing equipment, electrical short circuit causing fire) must be reported to HSE via online portal within 15 days (10 days for fatalities/specified injuries). Ensure adequate first aid provision per HSE L74 guidance – minimum one appointed person for low-risk sites, qualified first aider (3-day FAW or 1-day EFAW) for higher-risk food manufacturing environments. First aid kits must be stocked with sterile dressings, eye wash, burn gel, and guidance cards, located within 50 metres of equipment. Display emergency contact numbers prominently including site first aiders, maintenance emergency line, and HSE incident contact centre (0345 300 9923). Conduct emergency stop drills quarterly and record participation to ensure operator competence in crisis response.
Under Food Safety Act 1990 and HACCP principles, metal detector sensitivity must be verified at the start of each production shift, after every product changeover, and at maximum 1-hour intervals during continuous operation (30 minutes recommended as best practice). You must use manufacturer-supplied or equivalent test pieces (typically ferrous 2.5mm, non-ferrous 3.0mm, stainless steel 3.5mm spheres) and document results on a CCP monitoring record showing date, time, operator name, pass/fail status, and corrective actions for any failures. Trading Standards officers will request these records during inspections along with evidence of: (1) equipment calibration certificates traceable to UKAS standards, (2) maintenance logs demonstrating preventive servicing per manufacturer schedule, (3) operator training records proving competence, and (4) your HACCP plan identifying the metal detector as a Critical Control Point with defined critical limits and monitoring procedures. Records must be retained for minimum 2 years. Failure to demonstrate due diligence can result in Hygiene Improvement Notices, product seizure, or prosecution under Food Safety and Hygiene (England) Regulations 2013. Additionally, checkweigher accuracy must comply with Weights and Measures Act 1985 – if making quantity declarations, equipment requires verification by Trading Standards and periodic re-verification (typically annually for commercial use).
Bypassing interlocked guards is a serious breach of PUWER 1998 Regulation 11 (dangerous parts of machinery) and Regulation 22 (maintenance operations), and yes, both the company and individuals can face prosecution. HSE takes guard bypassing extremely seriously – it's a causal factor in numerous fatal and serious injury cases documented in HSG245. The legal position is clear: guards must remain in place and functional during operation, and if removal is necessary for maintenance (including jam clearance), you must implement a safe system of work including: (1) LOTO isolation per BS EN ISO 14118 to achieve zero energy state, (2) permit-to-work for complex tasks, (3) use of alternative safeguarding (e.g., hold-to-run controls, reduced speed maintenance mode) if equipment design permits, and (4) competent person supervision. If jams are frequent, this indicates an underlying equipment fault or operational issue that must be addressed through engineering improvement – HSE will not accept 'production pressure' as justification for unsafe practices. Penalties for PUWER breaches include unlimited fines (recent cases have exceeded £1 million) and up to 2 years imprisonment for individuals under Section 37 of Health and Safety at Work Act 1974 if directors/managers are found to have consented to or connived in the offence. You should immediately conduct a risk assessment per BS EN ISO 12100, implement LOTO procedures, provide refresher training emphasising legal duties, and consider disciplinary action for repeated violations. Document all corrective actions as evidence of due diligence.
Your legal obligation depends on whether the checkweigher is part of your HACCP Critical Control Point (CCP) system and whether you're making average quantity declarations under Weights and Measures Act 1985. If the metal detector component has failed sensitivity testing, you MUST quarantine all products processed since the last successful verification test – this is non-negotiable under Food Safety Act 1990 and due diligence defence requirements. These products must be treated as potentially contaminated and either: (1) manually inspected using a verified metal detector, (2) reprocessed through functioning equipment, or (3) destroyed with waste records retained. Simply recalibrating and continuing would constitute a breach of your HACCP plan and could result in prosecution if contaminated product reaches consumers. For checkweigher weight accuracy drift, if you're making quantity declarations (e.g., '500g ℮'), the Weights and Measures Act requires you to demonstrate compliance with average quantity system rules – this means the affected batch may need statistical verification or, if significantly out of tolerance, relabelling or destruction. Trading Standards can prosecute for short-weight offences even if unintentional. Best practice: implement automatic data logging that timestamps all weight measurements, enabling you to identify the exact point calibration drifted and limit the affected batch size. Your HACCP plan should define 'loss of control' criteria (e.g., 2 consecutive test failures) triggering automatic line stop and quarantine procedures. Document your decision-making process thoroughly – in the event of an incident or inspection, you must demonstrate you took all reasonable precautions and exercised due diligence. The cost of quarantine and re-inspection is far lower than the potential costs of product recall, prosecution, or consumer injury claims.
Competent Person & Operative Declaration: By signing below, the Site Supervisor confirms this assessment has been adapted and verified for actual site conditions, and operatives confirm they have attended the pre-start Toolbox Talk for Bizerba GLM-Ievo Checkweigher Metal Detector Combo and will follow the safe system of work.
| Operative / Supervisor Name | Trade / Role & CSCS No. | Signature | Date & Time |
|---|---|---|---|
| 1. (Site Supervisor): | |||
| 2. | |||
| 3. | |||
| 4. | |||
| 5. | |||
| 6. |