Under COSHH 2002 Regulation 7, HSG140 (Safe Use and Handling of Flammable Liquids), COMAH 2015, and ADR tanker earthing requirements, employers must implement robust engineering controls, isolation procedures (LOTO), and bunding to prevent catastrophic release, fire, or toxic exposure during bulk liquid chemical transfer operations. This SOP mandates pre-transfer risk assessment, earthing verification, emergency shut-off systems, and secondary containment to reduce residual risk to ≤8 (5×5 matrix). It applies to all tanker offloading, IBC decanting, and pipeline transfer activities involving flammable, corrosive, or toxic substances at UK chemical storage, manufacturing, and distribution sites. Competent persons must verify earthing continuity, confirm bund integrity, and enforce permit-to-work protocols before any valve operation. The procedure integrates HSG140 guidance on static electricity control, COMAH safety report requirements for major accident hazards, and ADR regulations for road tanker operations. All operatives must hold valid CSCS/NPORS cards, complete site-specific COSHH training, and wear full chemical-resistant PPE throughout the transfer cycle.

Statutory FrameworkCOSHH 2002, HSG140 (Safe Use and Handling of Flammable Liquids), COMAH 2015, ADR Tanker Earthing & LOTO
ClassificationTypical bulk chemicals transferred include UN 1230 (Methanol, Class 3, PG II), UN 1789 (Hydrochloric Acid, Class 8, PG II), UN 1824 (Sodium Hydroxide Solution, Class 8, PG II), UN 1993 (Flammable Liquids N.O.S., Class 3), and UN 2735 (Amines, Liquid, Corrosive, N.O.S., Class 8). GHS pictograms: Flame (GHS02), Corrosion (GHS05), Health Hazard (GHS08), Exclamation Mark (GHS07). All substances must have current UK-compliant Safety Data Sheets (SDS) available at the transfer point, with emergency contact numbers displayed. COMAH 2015 upper-tier thresholds apply where aggregate flammable liquid storage exceeds 50,000 tonnes or toxic substances exceed specified limits. ADR 2023 requires tanker drivers to hold valid ADR vocational training certificates and carry transport documentation (Chapter 5.4). Static earthing resistance must not exceed 10⁶ ohms per HSG140 Section 4.3. Emergency response procedures must align with site COMAH Safety Report and local authority COMAH plans.
Required Plant / KitBonded earthing clamps and continuity testers (10⁶ ohm max resistance, HSG140 compliant) • Emergency shut-off valves (pneumatic or manual quarter-turn ball valves with lockable handles) • Spill containment bunds (minimum 110% capacity of largest tank/tanker compartment, impermeable construction) • Explosion-proof transfer pumps (ATEX-certified Zone 1/2, intrinsically safe motors) • Calibrated flow meters with high-level alarms and automatic trip systems
Site Sign-Off StatusRequires Competent Person Verification
Bid-Winning PCI Tender Studio or Instant Voice Customization

Bidding a Contract or Need This SOP Customized for Your Site?

Drop your client's Pre-Construction Information (PCI) PDF into our Tender Studio to generate a page-cited 5×5 RAMS & PQQ pack—or download our free blank Word (.doc) shell below.

Compile Visual SOP from Video

1. Mandatory Personal Protective Equipment (BS EN Standards)

BS EN 374-1:2016+A1:2018 (Type B, permeation Class 4 minimum for target chemicals)
Chemical-resistant gloves (nitrile or butyl rubber, minimum 0.4mm thickness)
Prevent dermal contact with corrosive, toxic, or sensitizing liquids during hose connection, valve operation, and emergency spill response per COSHH 2002 Regulation 7.
BS EN 166:2001 (Grade 3 liquid splash, optical class 1)
Full-face chemical splash goggles or face shield
Protect eyes and face from pressurized liquid jets, splashes during coupling/decoupling, and vapour exposure as mandated by COSHH 2002 Schedule 2A.
BS EN ISO 20345:2011 (S5 rating, antistatic properties, penetration resistance)
Chemical-resistant safety boots with steel toecap and anti-static sole
Prevent foot injury from dropped equipment, chemical pooling in bund areas, and static accumulation per HSG140 static control requirements.
BS EN 14605:2005+A1:2009 (Type 4 spray-tight, Category III PPE)
Type 4 chemical-resistant coverall with taped seams
Provide full-body protection against liquid aerosols, mists, and splashes during high-volume transfer operations involving corrosive or toxic substances under COSHH 2002.

2. 5×5 Hazard Risk Assessment Matrix (HASAWA 1974 / CDM 2015)

Identified Hazard & HarmInitial Risk (L×S)Mandatory Engineering, Isolation & Procedural ControlsResidual Risk
1. Catastrophic bulk chemical release due to hose failure, coupling disconnect, or overfill
Harm: Major environmental contamination, toxic exposure (inhalation/dermal), fire/explosion if flammable, potential COMAH major accident event
4 × 5 = 20Install high-level alarms with automatic pump shut-off; use dry-break couplings (BS EN 13083); verify hose integrity (visual inspection + pressure test records within 12 months); implement permit-to-work with pre-transfer checklist; ensure bund capacity ≥110% of largest vessel; deploy spill kits and trained emergency response team; conduct annual COMAH safety report review and emergency drills.2 × 4 = 8
2. Static electricity ignition of flammable vapours during transfer (Class 3 liquids)
Harm: Flash fire, vapour cloud explosion, severe burns, fatalities, major property damage
3 × 5 = 15Bond and earth tanker and receiving vessel before hose connection (verify <10⁶ ohms resistance per HSG140); use conductive hoses (BS EN 12115 Type 2); maintain flow velocity <1 m/s during initial fill to prevent turbulent charge generation; prohibit mobile phones and non-ATEX equipment within 3m exclusion zone; install fixed gas detection (LEL monitors) with audible alarms; ensure all equipment is ATEX-certified for Zone 1/2 areas.2 × 4 = 8
3. Inhalation of toxic or corrosive vapours/fumes (e.g. HCl, ammonia, solvents)
Harm: Acute respiratory distress, chemical pneumonitis, unconsciousness, long-term lung damage, potential fatality
4 × 4 = 16Conduct COSHH assessment with workplace exposure monitoring (WEL compliance); use closed-loop transfer systems with vapour recovery where practicable; provide local exhaust ventilation (LEV) at fill points (tested every 14 months per HSG258); issue respiratory protective equipment (RPE) – half-mask with A2P3 filters (BS EN 140/143) for routine, BA sets for emergency; enforce 2-person minimum for high-hazard transfers; install fixed toxic gas detectors with alarm relay to control room.2 × 3 = 6
4. Manual handling injuries during hose connection/disconnection (heavy couplings, awkward postures)
Harm: Musculoskeletal disorders (back, shoulder, wrist strain), acute soft tissue injuries, long-term disability
4 × 2 = 8Provide mechanical hose handling aids (spring balancers, trolleys, quick-release couplings); limit hose assembly weight to <25kg per operative or enforce 2-person lift; deliver manual handling training (HSE INDG143) annually; design transfer points at ergonomic height (0.75–1.2m); rotate operatives to reduce repetitive strain; conduct DSE/workstation assessments for control panel operators.2 × 2 = 4
5. Tanker rollover or movement during transfer (inadequate chocking, driver error)
Harm: Hose rupture, major spill, crushing injuries, loss of containment, environmental incident
2 × 5 = 10Apply wheel chocks (minimum 2 per tanker) and engage parking brake before hose connection; use designated hardstanding with level gradient (<2%); install physical barriers (bollards) to prevent forward/reverse movement; enforce 'engine off, keys removed' policy during transfer; implement LOTO on tanker ignition if practicable; ensure driver remains in attendance or within immediate call; conduct pre-transfer vehicle stability check (tyre condition, suspension, load distribution).1 × 4 = 4

3. Step-by-Step Safe Sequence of Operations & Hold-Points

1

Site Induction, Permit-to-Work, and COSHH Briefing

Pre-Transfer Preparation & Permit Issue

Verify tanker driver holds valid ADR certificate and transport documentation (CMR, ADR Chapter 5.4). Issue site-specific permit-to-work after confirming: (a) receiving tank has adequate capacity (check gauges/dip readings); (b) bund is empty, clean, and drain valve closed; (c) weather conditions acceptable (no lightning within 10 miles, wind <20 mph); (d) emergency services notified if COMAH site. Conduct toolbox talk covering SDS hazards, emergency procedures, muster points, and PPE requirements. Confirm all operatives hold valid CSCS/NPORS cards and have completed site COSHH training within past 12 months.

Critical Hold-Point: STOP: Do not proceed if receiving tank capacity is insufficient, bund integrity is compromised, or weather conditions pose lightning/static ignition risk. Abort transfer and notify site manager immediately.
2

Vehicle Immobilization, Earthing, and Exclusion Zone Setup

Tanker Positioning & Isolation (LOTO)

Position tanker on designated hardstanding within 3m of fill point. Apply minimum 2 wheel chocks per vehicle and engage parking brake. Switch off engine and remove ignition keys (store in permit holder's possession). Attach bonded earthing clamp to tanker chassis and receiving vessel metalwork; verify continuity <10⁶ ohms using calibrated tester (record reading on permit). Erect 3m exclusion zone barriers with 'No Smoking / No Naked Flames / ATEX Zone' signage. Isolate non-essential electrical equipment within zone. Confirm fixed gas detectors (LEL/toxic) are operational and alarm-tested.

Critical Hold-Point: HOLD POINT: Earthing resistance must be <10⁶ ohms per HSG140. If reading exceeds limit, clean contact surfaces and re-test. Do not proceed until compliant reading achieved and recorded.
3

Dry-Break Coupling, Leak Test, and Valve Alignment Verification

Hose Connection & Pre-Transfer Checks

Inspect transfer hose for damage (cuts, abrasion, kinks); verify test certificate is in-date (<12 months). Connect dry-break coupling to tanker outlet and receiving tank inlet, ensuring gaskets are correctly seated. Perform leak test: slowly open tanker valve 1/4 turn and inspect all joints for seepage (use leak detection spray if available). Confirm receiving tank vent is open and unobstructed. Set flow meter to zero and verify high-level alarm set-point (typically 90% capacity). Open isolation valves in sequence: (1) receiving tank inlet, (2) tanker outlet. Maintain initial flow rate <1 m/s for first 30 seconds to minimize static generation (HSG140 Section 4.3).

Critical Hold-Point: STOP: If any leak detected at coupling or valve, immediately close tanker valve, depressurize hose, rectify leak, and re-test. Do not attempt transfer with compromised connections.
4

Pump Operation, Flow Rate Control, and Atmospheric Monitoring

Active Transfer & Continuous Monitoring

Start transfer pump (if applicable) or open tanker valve fully once initial flow confirmed leak-free. Monitor flow meter and tank level gauge continuously; maintain flow rate within design parameters (typically 200–500 L/min for bulk chemicals). Conduct atmospheric monitoring every 15 minutes using portable gas detector (LEL <10%, toxic gases <50% WEL). Maintain 2-person attendance: one at tanker, one at receiving tank. Prohibit mobile phone use, smoking, or hot work within 10m exclusion zone. Observe bund area for signs of leakage or overfill. Record transfer volume and time on permit at 25%, 50%, 75% completion milestones.

Critical Hold-Point: EMERGENCY STOP: If LEL exceeds 10%, toxic gas alarm activates, or any leak observed, immediately activate emergency shut-off valve (ESOV), stop pump, close tanker valve, and evacuate to muster point. Initiate site emergency response plan.
5

Final Volume Verification, Line Draining, and Coupling Isolation

Transfer Completion & Hose Purging

When high-level alarm activates or target volume reached, close tanker outlet valve first, then stop pump (if used). Allow hose to drain into receiving tank (minimum 5 minutes). Close receiving tank inlet valve. Verify final volume against delivery note (tolerance ±2%). If significant discrepancy, inspect bund and surrounding area for spills before signing off. Purge residual chemical from hose using nitrogen or compressed air (if system equipped) into receiving tank or dedicated recovery vessel. Depressurize hose by cracking coupling slightly and allowing vapour to vent safely (use drip tray).

Critical Hold-Point: HOLD POINT: Do not disconnect coupling until hose is fully drained and depressurized. Residual pressure can cause violent spray and serious chemical exposure.
6

Safe Coupling Removal, Equipment Cleaning, and Documentation

Disconnection, Decontamination & Permit Closure

Disconnect dry-break coupling at receiving tank first, then tanker outlet. Cap all open connections immediately to prevent contamination and vapour release. Inspect bund for any spillage; if present, deploy spill kit and absorb/contain per site ERP. Decontaminate hose exterior and couplings using appropriate neutralizing agent or water wash (dispose of washings per site waste procedure). Remove earthing clamps and store equipment securely. Remove wheel chocks and return ignition keys to driver. Complete permit-to-work sign-off: record final volume, transfer duration, any incidents/near-misses, and atmospheric monitoring results. File permit and update site chemical inventory/COMAH records. Conduct post-transfer debrief and address any lessons learned.

Critical Hold-Point: FINAL CHECK: Confirm bund drain valve remains closed, all isolation valves are in correct position (receiving tank inlet closed), and exclusion zone signage removed. Notify site manager of transfer completion and any abnormal occurrences.

Emergency Rescue, First Aid & Spill Protocol

**EMERGENCY RESPONSE:** In the event of major spill, fire, or toxic release, activate site emergency alarm immediately. Evacuate all non-essential personnel to designated muster point (minimum 50m upwind). Trained emergency response team (ERT) to don BA sets and approach from upwind. Activate emergency shut-off valve (ESOV) if safe to do so. Deploy foam/dry powder extinguishers for flammable liquid fires (do NOT use water jets on Class 3 fires). For large spills, construct temporary bunding using absorbent booms and sand. Notify Environment Agency incident hotline (0800 807060) if >10 litres enters watercourse or ground. Contact Fire & Rescue Service (999) for fires exceeding 1m² or involving COMAH substances. Preserve scene for HSE RIDDOR investigation if serious injury/dangerous occurrence. **FIRST AID (Chemical Exposure):** • **Skin Contact:** Remove contaminated clothing immediately. Irrigate affected area with copious running water for minimum 15 minutes. Do NOT attempt to neutralize. Seek medical attention for all corrosive/toxic exposures. • **Eye Contact:** Irrigate eyes with eyewash station or clean water for minimum 15 minutes, holding eyelids open. Remove contact lenses if present and easy to do. Seek immediate medical attention – chemical eye injuries are time-critical. • **Inhalation:** Move casualty to fresh air immediately. If breathing is difficult, administer oxygen (if trained and available). Place in recovery position if unconscious but breathing. Call 999 and request paramedic attendance. Do NOT enter confined space or vapour cloud without BA. • **Ingestion (rare):** Do NOT induce vomiting. Rinse mouth with water. Give small sips of water if conscious. Seek immediate medical attention and provide SDS to paramedics. All incidents involving chemical exposure, fire, or environmental release must be reported to site HSE Manager within 1 hour and logged in site accident book. RIDDOR-reportable events (major injury, dangerous occurrence, >7-day absence) must be notified to HSE within timescales specified in RIDDOR 2013.

4. UK HSE & PQQ Compliance FAQs: Bulk Liquid Chemical Transfer Process SOP (Tanker Offloading, Bunding & COSHH Controls)

What are the legal requirements for earthing and bonding during bulk chemical tanker offloading in the UK?

Under HSG140 (Safe Use and Handling of Flammable Liquids) Section 4.3, all tanker and receiving vessel metalwork must be electrically bonded and earthed before transfer of flammable liquids (Class 3) to prevent static ignition. Earthing resistance must not exceed 10⁶ ohms, verified using a calibrated continuity tester before each transfer. The Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR) require elimination of ignition sources in hazardous zones. ADR 2023 Chapter 7.5.10 mandates that tanker drivers ensure earthing is in place before opening valves. Failure to earth is a common cause of flash fires and is cited in HSE enforcement notices. All earthing clamps must be bonded (not relying on paint or rust for contact) and connected before hoses are coupled, remaining in place until disconnection is complete.

Do I need a COMAH safety report for bulk liquid chemical storage and transfer operations?

You require a COMAH 2015 safety report if your site stores or handles quantities of hazardous substances exceeding the lower-tier (notification) or upper-tier (safety report) thresholds in Schedule 1. For example, upper-tier applies if you store ≥50,000 tonnes of flammable liquids (Category 2/3) or ≥200 tonnes of acute toxic substances (Category 1/2). The safety report must include major accident hazard scenarios (e.g. catastrophic tank failure, tanker collision, toxic release), prevention measures (engineering controls, LOTO, permit systems), and emergency response plans coordinated with local authority and emergency services. HSE is the competent authority and conducts inspections; non-compliance can result in prohibition notices or prosecution. Even below upper-tier, you must notify HSE and implement a Major Accident Prevention Policy (MAPP). Bulk transfer operations are high-risk COMAH activities and must be covered in your safety report with detailed procedures, competence requirements, and maintenance regimes.

What PPE and training do operatives need for COSHH-compliant bulk chemical transfer in the UK?

Under COSHH 2002 Regulation 7, employers must provide adequate PPE as a last line of defense after engineering controls. For bulk chemical transfer, mandatory PPE includes: chemical-resistant gloves (BS EN 374 Type B, permeation Class 4+ for target substances), full-face splash goggles or face shield (BS EN 166 Grade 3), Type 4 chemical coveralls (BS EN 14605), and S5 safety boots with antistatic properties (BS EN ISO 20345). Respiratory protection (half-mask with A2P3 filters or BA sets) is required where vapour exposure exceeds Workplace Exposure Limits (WELs) or for emergency response. Training must cover: COSHH assessment interpretation, SDS comprehension, correct PPE donning/doffing, emergency procedures, and substance-specific hazards. Operatives should hold CSCS/NPORS cards and complete refresher training annually. Competent person (e.g. site chemist, HSE advisor) must supervise high-hazard transfers. ADR-trained drivers are responsible for tanker-side operations. All training records must be documented and available for HSE inspection.

5. Operative Toolbox Talk & Competent Person Sign-Off Register

Operative / Supervisor Name Trade / Role & CSCS No. Signature Date & Time
1. (Site Supervisor):     
2.     
3.     
4.     

Automate UK Safety Documentation with SafeSequence®

Need site-specific compliance documentation instead of a static template? Explore the core SafeSequence® UK software modules hosted in AWS London (eu-west-2):

45s Voice RAMS & COSHH Dictate site tasks or select CLP diamonds to generate UK 5×5 RAMS & Reg 6 COSHH PDFs. PCI Tender-to-RAMS Studio Upload 300-page Principal Contractor PCI PDFs for [Page X] cited RAMS & PAS 91 answers. Enterprise Visual SOPs Turn shop-floor POV walkthrough video into GDPR-redacted Visual SOPs, 6S OPLs & CAPAs. HSE Consultant Vaults Multi-client white-label RAMS, Visual SOP & COSHH software for CMIOSH consultants.

Related UK Safety & Tender Templates