UK HVAC, air conditioning, and Air Handling Unit (AHU) maintenance quotations must comply with F-Gas Regulations 2015 (refrigerant handling & leak checks), BESA SFG20 planned maintenance schedules, TR19 internal cleanliness standards, PUWER 1998 Lock-Off/Tag-Out (LOTO) isolation for rotating machinery, and CIS Domestic Reverse Charge VAT (VATA 1994 s.55A) for building services. This audit-grade template integrates a priced Bill of Quantities (BoQ) with 2026 UK trade rates (Materials, Plant, Labour in £ GBP), a pre-staged 5×5 Risk Assessment & Method Statement (RAMS) covering refrigerant exposure, electrical isolation, working at height (AHU access), Legionella control, and rotating machinery entanglement, and BS EN-coded PPE schedules. By locking a Client Purchase Order against this quotation, contractors automatically unlock the embedded RAMS, ensuring F-Gas-certified engineers execute LOTO isolation, TR19 hygiene swabs, and SFG20 task frequencies while maintaining full CIS VAT compliance. The 5×5 matrix demonstrates risk reduction from initial scores (e.g. 4×4=16 High) to residual (2×2=4 Low) through engineering controls, permit-to-work systems, and competent-person supervision, satisfying CDM 2015 Principal Contractor duties and client PQQ pre-qualification requirements for mechanical services frameworks.
Need to price this scope for a client buyer? Dictate your scope in the SafeSequence Voice-to-Quote Studio to compile a custom BoQ, auto-fill your blank .docx letterhead, and unlock the matching 5×5 RAMS below at £0 extra credit cost when the PO lands.
| Code | Trade Item & Specification | Category | Qty / Unit | Unit Rate | Net Total |
|---|---|---|---|---|---|
| M-HVAC-010 | R32 refrigerant gas (10 kg cylinder, virgin, GWP 675) – supply only, F-Gas certified handling. Standard-rated 20% VAT (not CIS reverse charge). | Materials | 1 No. cylinder | £285.00 | £285.00 |
| M-HVAC-020 | MERV 8 pleated panel filter set (592×592×48 mm) for AHU – supply & fit, inc. disposal of used filters (EWC 15 01 02). | Materials | 4 No. filters | £38.50 | £154.00 |
| P-HVAC-030 | Mobile aluminium scaffold tower hire (4 m platform height, BS EN 1004:2020) – 1 week hire inc. delivery, erection, inspection (PASMA cert). | Plant | 1 No. week | £175.00 | £175.00 |
| L-HVAC-040 | JIB-approved HVAC Technician (ECS Gold Card + F-Gas Cat I cert) – planned maintenance visit: isolation, filter change, coil clean, refrigerant check, TR19 swab, re-commission. CIS Domestic Reverse Charge applies (VATA 1994 s.55A); client accounts for VAT. | Labour | 8 hrs | £52.00 | £416.00 |
| Identified Hazard & Harm | Initial Risk (L×S) | Mandatory Engineering, Isolation & Procedural Controls | Residual Risk |
|---|---|---|---|
| 1. Refrigerant exposure (R32, R410A) – inhalation, asphyxiation in confined AHU plant rooms, or frostbite from liquid contact Harm: Asphyxiation (oxygen displacement <19.5%), cardiac sensitisation (high concentrations), cold burns (liquid refrigerant −51°C) | 4 × 4 = 16 | F-Gas Cat I certified engineer only; pre-work O₂ monitoring (<19.5% stop work); forced ventilation (10 ACH min.); wear nitrile gloves (BS EN 374); refrigerant recovery before opening system; emergency eyewash station within 10 m. | 2 × 2 = 4 |
| 2. Electrical shock from live AHU fan motors, control panels, or VSD drives (230/400 V 3-ph) Harm: Electrocution (fatal), severe burns, arc flash injury | 5 × 5 = 25 | PUWER 1998 Reg 19 LOTO: isolate at local isolator & main distribution board; fit MCB lockout devices & personal padlock; affix 'Danger: Men Working' tag; prove dead with calibrated voltage tester (GS38); permit-to-work for >400 V; AP (Authorised Person) supervision. | 1 × 3 = 3 |
| 3. Working at height – accessing rooftop AHU, changing filters on elevated plenums (2–4 m) Harm: Fall from height causing fractures, head injury, or fatality | 4 × 5 = 20 | Use mobile scaffold tower (BS EN 1004:2020, PASMA-trained erector, weekly inspection); guardrails on all open sides; 3:1 base:height ratio; toe boards; alternatively, podium step with handrails; no ladders for prolonged work; edge protection on roofs (collective measures per Work at Height Regs 2005). | 2 × 3 = 6 |
| 4. Rotating machinery entanglement – AHU fan impellers, belt drives, motor couplings during inspection/cleaning Harm: Crush injury to hands/fingers, amputation, entanglement of clothing/hair | 3 × 5 = 15 | LOTO isolation (see Hazard 2) before opening AHU access doors; verify fan stationary (visual + try-to-turn test); remove watches/jewellery; secure long hair; replace all guarding (BS EN ISO 14120) before re-energising; two-person rule for confined AHU plenums. | 1 × 4 = 4 |
| 5. Legionella bacteria exposure from AHU cooling coils, humidifiers, or condensate trays (bioaerosol inhalation) Harm: Legionnaires' disease (pneumonia, 10% fatality), Pontiac fever (flu-like illness) | 3 × 4 = 12 | HSG274 Part 2 compliance: quarterly TR19 hygiene swabs (ATP <500 RLU pass); biocide dosing of humidifiers; drain & clean condensate trays; coil disinfection (quaternary ammonium or chlorine dioxide, 10 min contact); wear FFP2 respirator during cleaning; Legionella risk assessment reviewed annually by competent person (e.g. Legionella Control Association cert). | 2 × 2 = 4 |
Attend client site induction; confirm AHU location, refrigerant type (nameplate check), and SFG20 task scope. Obtain permit-to-work from Authorised Person (AP). Isolate AHU at local isolator and main distribution board; fit MCB lockout devices and personal padlock; affix 'Danger: Men Working' tag with name/date. Prove dead at fan motor terminals and control panel using calibrated voltage tester (GS38). Test emergency stop functionality. Erect mobile scaffold tower (if required) with PASMA inspection record; check guardrails, toe boards, and 3:1 stability ratio.
Don FFP2 respirator and safety spectacles. Open AHU access panels (fan, filter, coil sections). Visually inspect for standing water in condensate trays, visible mould/biofilm on coils, and filter loading. Take TR19 hygiene swabs from cooling coil surface and condensate tray; record ATP readings (target <500 RLU). Photograph filter condition, coil fouling, and any corrosion. Check fan impeller for debris/damage and belt tension (if belt-driven). Record findings on SFG20 task sheet.
Remove and bag used filters (EWC 15 01 02 waste code); dispose per site waste management plan. Fit new MERV 8 filters (check airflow direction arrow). Spray cooling coils with approved coil cleaner (pH-neutral or mild alkaline; consult SDS); allow 10 min contact time. Rinse with low-pressure water (avoid fin damage). Apply biocide (quaternary ammonium or chlorine dioxide, 200 ppm) to coils and condensate tray; leave 10 min contact. Drain and flush condensate trays; check trap seal (U-bend water level). Wipe fan impeller blades with damp cloth.
Connect calibrated digital manifold gauges to service ports (low/high side). Record suction/discharge pressures and temperatures. Calculate superheat (suction temp − evaporator saturation temp; target 8–12°C) and subcooling (condenser saturation temp − liquid line temp; target 5–7°C). Perform electronic leak detection (heated diode or infrared sensor, 5 g/yr sensitivity per F-Gas Regs). If leak detected, mark location, recover refrigerant, repair, pressure test (nitrogen 1.1× design pressure, 24 hr hold), vacuum to 500 microns, recharge to nameplate weight (±2%). Record refrigerant type, GWP, quantity added, and cylinder batch number in site F-Gas log.
Refit all AHU access panels and secure with original fasteners. Verify all tools and cleaning materials removed from AHU interior (tool count check). Confirm fan impeller rotates freely by hand (no obstruction). Check belt tension and alignment (if applicable). Inspect motor bearings for noise/play. Verify condensate drain trap seal. Replace any damaged insulation or gaskets. Complete SFG20 task sheet with filter type/date, ATP results, refrigerant pressures, and any defects. Photograph completed work.
Remove personal padlock and LOTO devices (only the person who fitted them may remove). Restore power at distribution board and local isolator. Start AHU in manual mode; listen for abnormal noise (bearing wear, belt squeal). Check fan rotation direction (compare to nameplate arrow). Measure supply air temperature and velocity (anemometer at grille). Verify BMS communication and setpoint control. Run for 15 min; re-check refrigerant pressures under load. Issue SFG20 certificate of completion, TR19 hygiene report, and F-Gas service record to client. Update asset register and schedule next service (per SFG20 frequency, typically 6–12 months).
**Emergency Contact:** Dial 999 (ambulance/fire). Site Emergency Assembly Point: [Insert location]. **Refrigerant Exposure:** Move casualty to fresh air immediately; if unconscious, place in recovery position and administer O₂ if trained. For liquid refrigerant contact (frostbite), irrigate affected skin/eyes with lukewarm water (15 min); do NOT rub. Seek medical attention. **Electrical Shock:** Do NOT touch casualty if still in contact with live conductor; isolate power first. If casualty not breathing, commence CPR (30 compressions:2 breaths) and deploy AED. Call 999. Treat burns with cool running water (20 min). **Fall from Height:** Do not move casualty if spinal injury suspected; call 999 and keep warm. Control bleeding with direct pressure. **Chemical Splash (Coil Cleaner):** Irrigate eyes/skin with eyewash station or running water (15 min). Remove contaminated clothing. Consult SDS for specific first aid (e.g. alkaline burns may require medical attention). **Legionella Suspected Exposure:** If flu-like symptoms develop within 2–10 days post-work (fever, cough, shortness of breath), seek urgent medical attention and inform GP of potential Legionella exposure; early antibiotic treatment is critical. **First Aid:** Minimum 1× First Aid at Work (FAW) trained person on site; first aid kit to BS 8599-1. Accident reporting: RIDDOR notification required for >7-day absence, major injury, or dangerous occurrence (HSE online F2508 within 15 days).
| Operative / Supervisor Name | Trade / Role & CSCS No. | Signature | Date & Time |
|---|---|---|---|
| 1. (Site Supervisor): | |||
| 2. | |||
| 3. | |||
| 4. |
Need a priced commercial quote or site-specific compliance pack instead of a static template? Explore the live SafeSequence® UK studios hosted in AWS London (eu-west-2):