Under the Work at Height Regulations 2005 (Reg. 4–6), CDM 2015 (Reg. 13), HSG33 (Health & Safety in Roof Work), and ACR[M]001 (Avoiding Danger from Fragile Roofs), every industrial roofing, cladding, and gutter repair must be planned by a competent person, use collective fall protection (edge protection, guardrails, safety nets) in preference to personal fall arrest, and reduce residual fall-from-height risk to ≤6 (5×5 matrix). This audit-grade UK commercial quote, Bill of Quantities (BoQ), and 5×5 Risk Assessment & Method Statement (RAMS) template integrates 2026 UK trade rates (Materials, Plant, Labour in £ GBP), CIS Domestic Reverse Charge VAT treatment (VATA 1994 s.55A), and pre-staged safe systems of work. Once a Client Purchase Order is locked, the contractor automatically unlocks the pre-staged 5×5 RAMS, ensuring full CDM Principal Contractor compliance, BS EN-certified PPE (fall arrest harness EN 361, safety helmet EN 397, work-at-height footwear EN ISO 20345 S3), and documented permit-to-work for fragile roof access. Suitable for main contractors, roofing specialists, facilities managers, and CDM Principal Designers tendering industrial roof repairs, re-cladding, or gutter replacement across the UK.
Need to price this scope for a client buyer? Dictate your scope in the SafeSequence Voice-to-Quote Studio to compile a custom BoQ, auto-fill your blank .docx letterhead, and unlock the matching 5×5 RAMS below at £0 extra credit cost when the PO lands.
| Code | Trade Item & Specification | Category | Qty / Unit | Unit Rate | Net Total |
|---|---|---|---|---|---|
| M-RFC-001 | Trapezoidal steel roof cladding sheets, 0.7 mm pre-coated Colorcoat HPS200 Ultra, 6.0 m × 1.0 m cover width, inc. fixings, flashings, and 10% waste allowance | Materials | 85 m² | £42.50 | £3,612.50 |
| M-GUT-002 | Aluminium box gutter sections (mill finish, 150 mm × 100 mm), inc. end caps, unions, brackets, and silicone sealant; compliant with BS EN 612 | Materials | 22 linear m | £38.00 | £836.00 |
| P-MEWP-003 | Mobile Elevated Work Platform (MEWP) hire – 12 m working height, 3.5 t GVW, LOLER-inspected, delivered, operated by IPAF-certified operative, 5-day hire | Plant | 1 week | £875.00 | £875.00 |
| L-ROF-004 | JIB-graded Industrial Roofer / Cladding Operative (Gold Card), CSCS, IPAF 3a/3b, Work at Height trained, inc. travel, supervision, and tool-time; standard 39-hour week | Labour | 80 hours | £28.50 | £2,280.00 |
| Identified Hazard & Harm | Initial Risk (L×S) | Mandatory Engineering, Isolation & Procedural Controls | Residual Risk |
|---|---|---|---|
| 1. Fall from height (>2 m) through fragile roof lights, unprotected roof edges, or during MEWP operation Harm: Fatal or life-changing injuries: spinal fracture, traumatic brain injury, multiple fractures, permanent disability | 4 × 5 = 20 | • Appoint competent person (SSSTS/SMSTS) to plan work per Work at Height Regs 2005 Reg. 4–6. • Erect collective edge protection (guardrails, toe-boards) to all open edges per BS EN 13374 Class A. • Cover or barrier-off all fragile roof lights; use roof ladders & crawling boards (BS 1129) to distribute load. • MEWP operator must hold valid IPAF 3a/3b; daily pre-use checks per LOLER 1998. • All operatives wear full-body harness (EN 361) + twin-leg lanyard (EN 355) attached to EN 795 Class A2 anchor. • Rescue plan in place; rescue equipment (descent device, stretcher) on-site. • Weather monitoring: cease work if wind >10 m/s or rain makes surfaces slippery. | 2 × 5 = 10 |
| 2. Manual handling of heavy/awkward cladding sheets (6 m × 1 m, ~18 kg each) causing musculoskeletal injury Harm: Back strain, shoulder injury, trapped fingers, lacerations from sharp edges | 4 × 3 = 12 | • Conduct Manual Handling Risk Assessment per Manual Handling Operations Regulations 1992. • Use mechanical aids: MEWP platform, material hoist, or crane for lifting sheets to roof level. • Two-person lift for all sheets >15 kg; team briefing on safe grip points and communication signals. • Pre-cut sheets to manageable lengths where possible; store vertically in A-frame racks. • Wear cut-resistant gloves (EN 388:2016 Level C) to prevent hand injuries. • Provide lifting training and toolbox talk on kinetic handling techniques. | 2 × 3 = 6 |
| 3. Adverse weather: high winds, rain, ice, or lightning during exposed roof work Harm: Loss of balance, slips, wind-blown materials striking operatives, lightning strike | 3 × 4 = 12 | • Monitor Met Office forecasts daily; cease work if wind speed >10 m/s (Beaufort Scale 5) or gusts >15 m/s. • Stop work immediately if lightning detected within 10 miles (use lightning detection app). • Do not work on wet, icy, or snow-covered roofs; apply anti-slip grit or defer until dry. • Secure all loose materials (sheets, tools) with lanyards or weighted bags to prevent wind-lift. • Provide high-visibility waterproof clothing (EN ISO 20471 Class 3) and thermal layers in cold weather. • Establish safe refuge area at ground level; communicate weather hold via two-way radio. | 2 × 4 = 8 |
| 4. Contact with live overhead power lines or buried services during MEWP positioning or drilling Harm: Electrocution (fatal), arc flash burns, explosion if gas main struck | 2 × 5 = 10 | • Obtain up-to-date utility plans (electricity, gas, water, telecoms) from asset owners (UKPN, Cadent, etc.). • Use Cable Avoidance Tool (CAT) and Signal Generator (Genny) to locate buried services; mark with spray paint. • Maintain minimum 3 m exclusion zone from overhead lines; if <3 m, arrange isolation or goal-post barriers with DNO. • MEWP boom must never approach within 3 m of live conductors; appoint trained banksman. • Permit-to-Work for any drilling or penetration; hand-dig trial holes to confirm service locations. • Emergency contact numbers for DNO and gas emergency (0800 111 999) displayed on site notice board. | 1 × 5 = 5 |
| 5. Falling objects (tools, fixings, cladding offcuts) striking personnel or public below Harm: Head injuries, lacerations, fractures to ground-level workers or passers-by | 4 × 4 = 16 | • Establish exclusion zone (minimum 6 m radius) around work area; erect Heras fencing, barriers, and warning signage. • Fit toe-boards (≥150 mm height) and brick guards to all scaffold platforms and MEWP baskets. • Use tool lanyards (EN 795) to tether all hand tools to operative or platform; no loose items on roof. • Lower materials in buckets or bags via rope/pulley system or material hoist—never throw or drop. • Provide hard hats (EN 397) to all personnel within exclusion zone, including visitors and delivery drivers. • Appoint ground-level banksman to control pedestrian/vehicle access and monitor for falling object hazards. | 2 × 4 = 8 |
Competent person (SSSTS/SMSTS) conducts roof survey to identify fragile materials (asbestos cement, liner panels, roof lights), structural capacity, and access routes. Obtain Permit-to-Work from client/duty-holder. Erect scaffold tower or MEWP with guardrails (BS EN 13374 Class A) to all open edges. Install EN 795 Class A2 anchor points for personal fall arrest. Barrier-off fragile roof lights with warning signs. Confirm LOLER inspection certificates for all lifting equipment. Deliver materials to designated laydown area; segregate from pedestrian routes. Brief all operatives on emergency procedures, rescue plan, and weather monitoring protocol.
Work from MEWP platform or scaffold tower—never stand directly on fragile roof. Use cordless impact driver to remove fixings systematically, starting from ridge and working downwards. Place fixings in tool belt pouch or bucket—do not drop. Lower damaged cladding sheets and gutter sections to ground using rope/pulley or material hoist; never throw. Inspect roof structure (purlins, trusses) for corrosion or damage; photograph and report to Principal Designer. Segregate waste into skips: metal (recyclable), non-hazardous construction waste, and any asbestos-containing materials (ACM) for licensed disposal. Maintain exclusion zone; banksman controls ground-level access.
Inspect and repair corroded purlins or roof trusses; replace timber sections if rot detected. Install new gutter brackets at 600 mm centres, ensuring fall of 1:600 towards downpipe outlet. Use torque wrench to tighten structural bolts to manufacturer's specification (typically 40–60 Nm). Fit aluminium box gutter sections (BS EN 612), seal unions with silicone mastic, and install end caps. Check alignment with string line and spirit level. Conduct water test: pour 10 litres into gutter and verify flow to downpipe with no leaks. All work conducted from MEWP or scaffold platform with guardrails; operatives remain clipped to anchor points.
Hoist pre-cut cladding sheets (6 m × 1 m) to roof level using MEWP platform or material hoist—two-person lift. Lay sheets from eaves to ridge, ensuring minimum 150 mm end lap and one-and-a-half corrugation side lap. Fix with self-drilling roofing screws (stainless steel A2, 5.5 × 65 mm) fitted with EPDM sealing washers, driven into purlin crown at 4 fixings per sheet width. Use cordless impact driver with torque setting to avoid over-tightening (strip threads) or under-tightening (water ingress). Install ridge capping, barge flashings, and eaves closure strips. Wear cut-resistant gloves (EN 388 Level C) when handling sharp edges. Maintain three-point contact on roof ladder; never overreach.
Clean all lap joints, flashing edges, and roof penetrations (vent pipes, roof lights) with isopropanol wipe to remove dust and oils. Apply neutral-cure silicone sealant (BS EN 15651-1 Type F) in continuous bead along side laps, end laps, and flashing upstands. Tool sealant with wet finger or spatula to ensure full adhesion and smooth finish. Fit foam closure strips under eaves and ridge to prevent bird/insect ingress while allowing ventilation. Inspect all fasteners for correct sealing washer compression—no gaps or over-compression. If using solvent-based coatings or hot bitumen, ensure adequate ventilation and wear FFP3 respirator (BS EN 149:2001+A1:2009). Allow 24-hour cure time before water testing.
Conduct final water test: simulate heavy rainfall using hose for 15 minutes, inspecting all laps, gutters, and downpipes for leaks. Rectify any defects immediately. Remove all tools, waste, and temporary works (scaffold, MEWP, barriers). Conduct final site inspection with client/Principal Contractor; complete snag list. Update CDM Health & Safety File with as-built drawings, product data sheets (cladding, sealants), LOLER certificates, and photographic record. Issue O&M manual covering gutter cleaning frequency (twice-yearly), fastener inspection (annual), and safe access arrangements for future maintenance. Hand over Permit-to-Work closure certificate and sign-off RAMS. Confirm CIS Domestic Reverse Charge VAT treatment on final invoice (VATA 1994 s.55A).
**Emergency Contact Numbers:** • Emergency Services: **999** (Fire, Ambulance, Police) • HSE Incident Contact Centre: **0345 300 9923** • Gas Emergency (National Grid): **0800 111 999** • Electricity Network (e.g., UK Power Networks): **0800 31 63 105** **Fall-from-Height Rescue:** If an operative falls and is suspended in harness, **suspension trauma** can be fatal within 10–20 minutes. Immediate rescue is critical: 1. **Call 999** and request Fire & Rescue Service with aerial appliance or rope rescue team. 2. **Do NOT attempt untrained rescue**—secondary falls are common. 3. If trained rescue team on-site, use descent device (EN 341 Class A) to lower casualty gently; avoid sudden release. 4. Once on ground, place casualty in **recovery position** (not flat on back) to prevent orthostatic shock. 5. Monitor consciousness, breathing, and circulation; administer oxygen if available. 6. **Do NOT allow casualty to stand or walk**—risk of cardiac arrest post-suspension. **First Aid Provision (HSE INDG214):** • Minimum **one appointed First Aider** (3-day FAW or EFAW) on-site at all times. • First Aid kit (BS 8599-1) stocked with trauma dressings, eye wash, burn gel, and resuscitation face shield. • Automated External Defibrillator (AED) recommended for sites >10 operatives or remote locations. • Accident Book (BI 510) maintained; all injuries recorded and RIDDOR-reportable incidents (>7-day absence, fall >2 m, hospital admission) notified to HSE within 15 days. **Adverse Weather / Lightning:** • If lightning detected within 10 miles, evacuate roof immediately and shelter in vehicle or building (not under trees or scaffold). • If operative experiences electric shock from overhead line contact, **do NOT touch casualty** until power confirmed isolated by DNO. Use non-conductive pole to separate if safe to do so, then call 999.
| Operative / Supervisor Name | Trade / Role & CSCS No. | Signature | Date & Time |
|---|---|---|---|
| 1. (Site Supervisor): | |||
| 2. | |||
| 3. | |||
| 4. |
Need a priced commercial quote or site-specific compliance pack instead of a static template? Explore the live SafeSequence® UK studios hosted in AWS London (eu-west-2):