Commercial Electrical Quote & Bill of Quantities (BoQ) Template UK (BS 7671 + 1-Click RAMS)

A Commercial Electrical Quote & Bill of Quantities (BoQ) Template UK is a statutory-compliant pricing and risk document mandated by BS 7671:2018+A2:2022 (18th Edition Wiring Regulations), Electricity at Work Regulations 1989 (EAWR), CIS Domestic Reverse Charge (VATA 1994 s.55A), and CDM 2015. It requires safe isolation (Regulation 14 EAWR), Lock-Off/Tag-Out (LOTO), and 5×5 risk assessment to reduce residual risk from 15–20 (High) to ≤6 (Low) before energisation. This template integrates 2026 UK trade BoQ line items (Materials, JIB Labour, Plant hire) with pre-staged RAMS that auto-unlock upon Client Purchase Order acceptance, ensuring full commercial and HSE compliance for electrical installation, testing, and commissioning works across domestic, commercial, and industrial projects in England, Scotland, Wales, and Northern Ireland.

Statutory FrameworkBS 7671:2018+A2:2022 (18th Edition), EAWR 1989, CIS Domestic Reverse Charge (VATA 1994 s.55A), CDM 2015
ClassificationNot applicable – this is an electrical installation and testing service. However, contractors must maintain COSHH assessments for any cable lubricants, cleaning solvents, or arc-flash protective coatings used on-site. All electrical equipment must comply with BS 7671:2018+A2:2022 (18th Edition), EAWR 1989 Regulation 4 (systems, work activities, and protective equipment), and CDM 2015 Principal Designer duties. CIS Domestic Reverse Charge (VATA 1994 s.55A) applies to specified building and construction services supplied to CIS-registered contractors; standard 20% VAT applies to non-CIS domestic clients and commercial end-users. Electrical Installation Certificates (EIC), Minor Electrical Installation Works Certificates (MEIWC), and Electrical Installation Condition Reports (EICR) must be issued by competent persons (BS 7671 Part 6) and retained for audit.
Required Plant / KitFluke 1664FC or Megger MFT1741 multifunction tester (BS 7671 Part 6 verification) • Martindale VT12 two-pole voltage tester (GS38 compliant proving unit) • Lockable MCB/MCCB isolation locks and 'Danger – Electrician at Work' tags (LOTO kit) • Insulated hand tools set (VDE 1000 V rated screwdrivers, pliers, cutters) • Portable RCD protection unit (30 mA trip) for temporary supply circuits
1-Click RAMS HandoverQuote + 5×5 RAMS Supported
Price This Job & Unlock the Matching 5×5 RAMS in 1 Click

Need a Priced Quote or Custom QUOTE for Your Site?

Dictate your job scope in our Voice-to-Quote Studio to generate a watermarked UK Trade BoQ preview (and unlock the matching 5×5 RAMS for £0 extra when the PO lands)—or download our free blank Word (.doc) shell below.

Price This Job + RAMS (Free Preview)

Benchmark 2026 UK Trade Bill of Quantities (BoQ) & Rate Card Schedule

Need to price this scope for a client buyer? Dictate your scope in the SafeSequence Voice-to-Quote Studio to compile a custom BoQ, auto-fill your blank .docx letterhead, and unlock the matching 5×5 RAMS below at £0 extra credit cost when the PO lands.

Code Trade Item & Specification Category Qty / Unit Unit Rate Net Total
MAT-ELEC-001Twin & Earth PVC/PVC cable 2.5 mm² (6242Y) to BS 6004, grey, 100 m drum supply, fix, and test for ring final circuitsMaterials3 No. drums (300 m total)£68.50 per 100 m drum£205.50
MAT-ELEC-002Metal-clad 18th Edition consumer unit, 12-way dual RCD (63 A 30 mA Type A), SPD, to BS EN 61439-3, supply and installMaterials1 No.£285.00£285.00
PLT-ELEC-003Mobile aluminium scaffold tower (5 m platform height) hire per week, including delivery, erection, and weekly inspectionPlant2 weeks£145.00 per week£290.00
LAB-ELEC-004JIB-approved Approved Electrician (Grade 3) – installation, testing, and certification (BS 7671:2018+A2:2022 18th Edition + 2391 Test & Inspect)Labour40 hours£32.50 per hour£1,300.00

1. Mandatory Personal Protective Equipment (BS EN Standards)

BS EN IEC 61482-2:2020 (Arc flash protection)
Arc-rated coveralls or flame-resistant workwear (Category 2, 8 cal/cm² minimum ATPV)
Protects against arc flash and thermal hazards during live testing or fault conditions (EAWR 1989 Reg 14).
BS EN 60903:2003+A2:2020
Insulated safety gloves, Class 00 (500 V AC) or Class 0 (1000 V AC), leather protectors
Prevents electric shock during isolation verification, proving dead, and re-energisation (GS38, EAWR 1989).
BS EN ISO 20345:2011 S3 SRC + electrical hazard (EH) rating
Safety footwear, electrically insulating, composite toe cap, slip-resistant sole
Reduces risk of electric shock via ground path and protects against falling objects and slips.
BS EN 166:2001 (1 F)
Safety spectacles with side shields, anti-fog, UV protection
Guards against arc flash, flying debris during cable termination, and drilling operations.

2. 5×5 Hazard Risk Assessment Matrix (HASAWA 1974 / CDM 2015)

Identified Hazard & HarmInitial Risk (L×S)Mandatory Engineering, Isolation & Procedural ControlsResidual Risk
1. Electric shock or electrocution from live conductors during installation, testing, or fault-finding
Harm: Fatal injury, cardiac arrest, severe burns, long-term neurological damage
4 × 5 = 20Isolate supply at origin (main switch/isolator), lock off with unique padlock and 'Danger – Electrician at Work' tag (LOTO). Prove dead with calibrated GS38 voltage tester and proving unit on all poles. Apply temporary earthing where back-feed risk exists. Use insulated tools (VDE 1000 V). Permit-to-Work for HV or complex LV systems. Competent Person (BS 7671 Part 6) supervision. Portable RCD protection (30 mA) on temporary supplies.2 × 3 = 6
2. Arc flash explosion during live testing, short-circuit fault, or incorrect re-energisation sequence
Harm: Severe burns (2nd/3rd degree), blast injury, blindness, fatality
3 × 5 = 15Conduct all testing dead wherever practicable (EAWR Reg 14). Where live testing is unavoidable (e.g. RCD trip time, earth loop impedance Ze), wear arc-rated PPE (8 cal/cm² minimum), face shield (BS EN IEC 61482-2), insulated gloves (BS EN 60903 Class 0). Use remote test probes. Establish 1 m exclusion zone. Ensure correct polarity and phase rotation before energisation. Incremental energisation: isolator → RCD → MCB. Emergency stop accessible.2 × 3 = 6
3. Falls from height when installing lighting circuits, cable tray, or conduit above 2 m
Harm: Fractures, spinal injury, head trauma, fatality
4 × 4 = 16Use mobile aluminium scaffold tower (BS EN 1004) with guardrails, toe boards, and safe access ladder. Weekly inspection by competent person (PASMA-trained). Alternatively, use podium steps (≤2.5 m) or Mobile Elevated Work Platform (MEWP) with IPAF-trained operator. Secure all tools in lanyards or tool bags. Maintain 3-point contact. Barricade work area below. Harness + lanyard only as last resort (Work at Height Regulations 2005).2 × 2 = 4
4. Manual handling of heavy consumer units, distribution boards, cable drums (up to 50 kg)
Harm: Musculoskeletal disorders (MSD), back strain, herniated disc, shoulder injury
5 × 3 = 15Mechanical aids: sack truck, cable drum stand, lifting trolley. Two-person lift for items >25 kg. Kinetic lifting technique training (Manual Handling Operations Regulations 1992). Pre-task dynamic risk assessment. Rotate tasks to reduce repetitive strain. Ensure clear, level access routes. Store materials at waist height where possible.3 × 2 = 6
5. Drilling/chasing walls: dust inhalation (silica, cement), noise >85 dB(A), vibration (HAVS)
Harm: Silicosis, lung disease, noise-induced hearing loss, Hand-Arm Vibration Syndrome (HAVS)
4 × 3 = 12Use on-tool dust extraction (HSE Class M vacuum, BS 8520-2). Wet-cutting where feasible. FFP3 disposable respirator (BS EN 149:2001+A1:2009) for dry cutting. Ear defenders (SNR 30 dB, BS EN 352-1) or moulded earplugs. Anti-vibration gloves (BS EN ISO 10819). Limit trigger time: max 15 min per hour. Health surveillance (HAVS, audiometry) for regular users. Rotate operatives.2 × 2 = 4

3. Step-by-Step Safe Sequence of Operations & Hold-Points

1

Site induction, permit issue, and safe electrical isolation (LOTO)

Pre-Start & Isolation

Attend site induction; confirm scope, hazards, and emergency procedures. Obtain Permit-to-Work if required (HV or complex LV). Identify supply origin (main isolator, consumer unit, distribution board). Isolate all relevant circuits: switch OFF, withdraw fuses or lock MCB/MCCB in OFF position using unique padlock and 'Danger – Electrician at Work' tag. Prove dead on all poles (L1, L2, L3, N) using calibrated GS38 voltage tester and proving unit. Display 'Isolated – Do Not Switch On' signage at point of isolation. Record isolation in site log.

Critical Hold-Point: ⚠ STOP – Do NOT proceed until isolation is verified DEAD on all poles and LOTO applied. Failure to prove dead is the leading cause of electrical fatalities (EAWR 1989 Reg 14).
2

Erect scaffold/podium, establish exclusion zone, and stage materials

Access & Preparation

Erect mobile scaffold tower or podium steps (PASMA-trained operative) with guardrails, toe boards, and safe access. Inspect before first use and weekly thereafter; tag with green 'Safe to Use' label. Barricade work area below with barriers and signage. Stage cable drums on rotating stands, consumer units, and hand tools within easy reach. Set up on-tool dust extraction (Class M vacuum) and connect to 110 V transformer or portable RCD-protected 230 V supply. Confirm emergency stop and first-aid kit locations.

Critical Hold-Point: ⚠ STOP – Do NOT work at height without guardrails or fall protection. Ensure scaffold inspection tag is in date and tower is level on firm ground.
3

Install cables, consumer unit, accessories, and earthing/bonding

Installation

Run cables in prescribed zones (BS 7671 Section 522) using appropriate fixing methods (clips every 300 mm horizontal, 400 mm vertical). Drill/chase walls using on-tool extraction; wear FFP3 mask and ear defenders. Install consumer unit on non-combustible surface ≥1.4 m above floor. Terminate cables using insulated VDE tools; ensure correct polarity (Brown=L, Blue=N, Green/Yellow=E). Install main protective bonding to gas, water, oil services (10 mm² minimum, BS 7671 Reg 411.3.1.2). Label all circuits clearly. Fit RCDs (30 mA Type A for socket circuits, Type F for inverter/EV loads). Install SPD (Type 2) if required by risk assessment.

Critical Hold-Point: ⚠ STOP – Verify all terminations are tight (torque screwdriver) and correct polarity before closing enclosure. Loose connections cause arcing and fire.
4

Conduct dead and live tests per BS 7671 Part 6 (Chapter 64)

Testing & Verification

With supply still isolated, perform dead tests using multifunction tester (Fluke 1664FC or Megger MFT1741): (1) Continuity of protective conductors (R1+R2 <0.05 Ω per metre), (2) Insulation resistance (≥1 MΩ at 500 V DC between live conductors and earth, L-N), (3) Polarity check (all switches in line conductor). Record results on Electrical Installation Certificate (EIC) schedule. Remove LOTO, restore supply under controlled conditions. Perform live tests: (4) Earth fault loop impedance Zs (must be ≤ values in BS 7671 Appendix 2 for MCB disconnection time), (5) RCD trip time (≤40 ms at 5× IΔn, ≤300 ms at 1× IΔn), (6) Functional testing of all switches, sockets, lights.

Critical Hold-Point: ⚠ STOP – Wear arc-rated PPE and insulated gloves for live testing. Establish 1 m exclusion zone. Use remote test leads. Do NOT touch live parts.
5

Incremental energisation, load balancing, and final functional checks

Energisation & Commissioning

Energise in sequence: (1) Close main isolator, (2) Switch ON RCDs (check 30 mA test button operates), (3) Switch ON individual MCBs one at a time, monitoring for trips or faults. Balance loads across phases (3-phase boards) to within 10% using clamp meter. Test all socket outlets with socket tester (correct wiring indicator). Operate all lighting circuits, check dimmer/sensor functions. Verify emergency lighting (if applicable) charges and illuminates on mains failure. Measure and record voltage at furthest point (must be 230 V ±10%, BS 7671 Appendix 2). Label consumer unit with maximum demand (A) and date of installation.

Critical Hold-Point: ⚠ STOP – If any MCB trips on energisation, immediately isolate, investigate, and re-test. Do NOT bypass or uprate protective devices.
6

Issue certificates, user instructions, and O&M manual; demobilise site

Handover & Documentation

Complete and sign Electrical Installation Certificate (EIC) or Minor Electrical Installation Works Certificate (MEIWC) per BS 7671 Part 6. Provide client with: (1) EIC/MEIWC, (2) Schedule of test results, (3) Consumer unit circuit schedule (laminated label), (4) User instructions (RCD testing, emergency procedures), (5) As-built drawings (if applicable). Register installation with local Building Control (Part P notification, England/Wales). Photograph completed installation for records. Remove all waste, packaging, and redundant materials (SWMP, CDM 2015). Demobilise scaffold, clean site, and hand back to client. Retain copies for 6 years (CDM 2015 Reg 4).

Critical Hold-Point: ⚠ STOP – Do NOT hand over installation without valid EIC/MEIWC signed by competent person. Non-compliance is a criminal offence (Building Regulations 2010 Part P).

Emergency Rescue, First Aid & Spill Protocol

**EMERGENCY CONTACT:** Dial 999 (UK) for life-threatening electric shock, arc flash burns, or fall from height. **Electric Shock:** Do NOT touch casualty if still in contact with live conductor. Isolate supply immediately or use non-conductive object (dry wood) to break contact. Check responsiveness, breathing; commence CPR if required (30 compressions : 2 breaths). Apply AED if available. Treat for shock; keep warm. **Arc Flash Burns:** Remove casualty from hazard. Do NOT remove adherent clothing. Cool burn with running water (20 min). Cover with sterile non-adhesive dressing. Treat for shock. **Falls:** Do NOT move casualty if spinal injury suspected. Stabilise head/neck. Call 999. Monitor breathing. **First Aid:** Minimum 1× HSE-appointed First Aider on site (EFAW or FAW certificate). First-aid kit to BS 8599-1. Accident Book (BI 510) entries mandatory. Report RIDDOR injuries (>7 days incapacity, fracture, electric shock requiring resuscitation) to HSE within 15 days via online portal. Preserve evidence; photograph scene. Notify Principal Designer and Client (CDM 2015 Reg 22).

4. UK Commercial, HSE & PQQ Compliance FAQs: Commercial Electrical Quote & Bill of Quantities (BoQ) Template UK (BS 7671 + 1-Click RAMS)

Does CIS Domestic Reverse Charge apply to my electrical subcontractor quote, or do I charge 20% VAT?

CIS Domestic Reverse Charge (VATA 1994 s.55A, effective 1 March 2021) applies when you (a CIS-registered subcontractor) supply specified construction services (including electrical installation) to another CIS-registered contractor for onward supply to a domestic end-user. In this case, you invoice at 0% VAT and the main contractor accounts for VAT under reverse charge. If you supply directly to a domestic homeowner (non-CIS), or to a commercial end-user (office, factory), you charge standard 20% VAT. Always confirm your client's CIS status (UTR, CIS registration number) and VAT status before issuing the quote. Incorrect VAT treatment triggers HMRC penalties and interest.

What qualifications must my electrician hold to legally issue an Electrical Installation Certificate (EIC) under BS 7671 18th Edition?

Under BS 7671:2018+A2:2022 Part 6 (Chapter 64), the person signing an EIC must be 'competent'—defined as possessing sufficient technical knowledge, experience, and skill. Typically this means: (1) City & Guilds 2365 Level 3 Diploma in Electrical Installations, (2) City & Guilds 2391-52 or 2394-01 Inspection & Testing qualification, (3) 18th Edition (BS 7671:2018+A2:2022) certificate (C&G 2382-22), (4) JIB Approved Electrician (Grade 3) or equivalent, and (5) membership of a Competent Person Scheme (NICEIC, NAPIT, ELECSA) for Part P self-certification in England/Wales. For non-domestic works or Scotland/NI, scheme membership is not legally required but demonstrates competence. Employers must maintain training records and competency matrices (CDM 2015 Reg 9).

How do I price labour in my electrical BoQ—should I use JIB rates, and what's included in the hourly charge?

JIB (Joint Industry Board) rates are the recognised benchmark for electrical contracting in the UK. As of January 2026, a JIB Approved Electrician (Grade 3) earns circa £21.50–£23.00 per hour basic wage (regional variations apply). Your BoQ labour rate (£32.50/hour in this template) includes: (1) basic wage, (2) employer's NI (13.8%), (3) holiday pay (12.07% accrual), (4) pension contributions (SJIB scheme, ~8%), (5) tool allowance, travel time, and (6) overhead/profit margin (typically 15–25%). For CIS subcontractors, deduct 20% (registered) or 30% (unregistered) CIS tax at source unless holding gross payment status. Always state whether your rate is 'CIS deducted' or 'gross' in the BoQ notes to avoid disputes. Include for PPE, small tools, and testing equipment in preliminaries or as separate line items.

5. Operative Toolbox Talk & Competent Person Sign-Off Register

Operative / Supervisor Name Trade / Role & CSCS No. Signature Date & Time
1. (Site Supervisor):     
2.     
3.     
4.     

Price the Job & Automate UK Safety Compliance with SafeSequence®

Need a priced commercial quote or site-specific compliance pack instead of a static template? Explore the live SafeSequence® UK studios hosted in AWS London (eu-west-2):

Voice-to-Quote & 1-Click RAMS Dictate your job scope to compile a priced UK Trade BoQ, auto-fill your blank .docx letterhead & unlock the matching 5×5 RAMS for £0 extra. PCI Tender-to-RAMS Studio Upload 300-page Principal Contractor PCI PDFs for [Page X] cited RAMS & PAS 91 answers. Voice RAMS & CLP COSHH Dictate site tasks or scan chemical tins to generate UK 5×5 RAMS & Reg 6 COSHH PDFs. Enterprise Admin Command Hub Unlock custom logo branding, saved company rate cards, Visual Video SOPs, 6S OPLs & CAPAs.