A Commercial Electrical Quote & Bill of Quantities (BoQ) Template UK is a statutory-compliant pricing and risk document mandated by BS 7671:2018+A2:2022 (18th Edition Wiring Regulations), Electricity at Work Regulations 1989 (EAWR), CIS Domestic Reverse Charge (VATA 1994 s.55A), and CDM 2015. It requires safe isolation (Regulation 14 EAWR), Lock-Off/Tag-Out (LOTO), and 5×5 risk assessment to reduce residual risk from 15–20 (High) to ≤6 (Low) before energisation. This template integrates 2026 UK trade BoQ line items (Materials, JIB Labour, Plant hire) with pre-staged RAMS that auto-unlock upon Client Purchase Order acceptance, ensuring full commercial and HSE compliance for electrical installation, testing, and commissioning works across domestic, commercial, and industrial projects in England, Scotland, Wales, and Northern Ireland.
Need to price this scope for a client buyer? Dictate your scope in the SafeSequence Voice-to-Quote Studio to compile a custom BoQ, auto-fill your blank .docx letterhead, and unlock the matching 5×5 RAMS below at £0 extra credit cost when the PO lands.
| Code | Trade Item & Specification | Category | Qty / Unit | Unit Rate | Net Total |
|---|---|---|---|---|---|
| MAT-ELEC-001 | Twin & Earth PVC/PVC cable 2.5 mm² (6242Y) to BS 6004, grey, 100 m drum supply, fix, and test for ring final circuits | Materials | 3 No. drums (300 m total) | £68.50 per 100 m drum | £205.50 |
| MAT-ELEC-002 | Metal-clad 18th Edition consumer unit, 12-way dual RCD (63 A 30 mA Type A), SPD, to BS EN 61439-3, supply and install | Materials | 1 No. | £285.00 | £285.00 |
| PLT-ELEC-003 | Mobile aluminium scaffold tower (5 m platform height) hire per week, including delivery, erection, and weekly inspection | Plant | 2 weeks | £145.00 per week | £290.00 |
| LAB-ELEC-004 | JIB-approved Approved Electrician (Grade 3) – installation, testing, and certification (BS 7671:2018+A2:2022 18th Edition + 2391 Test & Inspect) | Labour | 40 hours | £32.50 per hour | £1,300.00 |
| Identified Hazard & Harm | Initial Risk (L×S) | Mandatory Engineering, Isolation & Procedural Controls | Residual Risk |
|---|---|---|---|
| 1. Electric shock or electrocution from live conductors during installation, testing, or fault-finding Harm: Fatal injury, cardiac arrest, severe burns, long-term neurological damage | 4 × 5 = 20 | Isolate supply at origin (main switch/isolator), lock off with unique padlock and 'Danger – Electrician at Work' tag (LOTO). Prove dead with calibrated GS38 voltage tester and proving unit on all poles. Apply temporary earthing where back-feed risk exists. Use insulated tools (VDE 1000 V). Permit-to-Work for HV or complex LV systems. Competent Person (BS 7671 Part 6) supervision. Portable RCD protection (30 mA) on temporary supplies. | 2 × 3 = 6 |
| 2. Arc flash explosion during live testing, short-circuit fault, or incorrect re-energisation sequence Harm: Severe burns (2nd/3rd degree), blast injury, blindness, fatality | 3 × 5 = 15 | Conduct all testing dead wherever practicable (EAWR Reg 14). Where live testing is unavoidable (e.g. RCD trip time, earth loop impedance Ze), wear arc-rated PPE (8 cal/cm² minimum), face shield (BS EN IEC 61482-2), insulated gloves (BS EN 60903 Class 0). Use remote test probes. Establish 1 m exclusion zone. Ensure correct polarity and phase rotation before energisation. Incremental energisation: isolator → RCD → MCB. Emergency stop accessible. | 2 × 3 = 6 |
| 3. Falls from height when installing lighting circuits, cable tray, or conduit above 2 m Harm: Fractures, spinal injury, head trauma, fatality | 4 × 4 = 16 | Use mobile aluminium scaffold tower (BS EN 1004) with guardrails, toe boards, and safe access ladder. Weekly inspection by competent person (PASMA-trained). Alternatively, use podium steps (≤2.5 m) or Mobile Elevated Work Platform (MEWP) with IPAF-trained operator. Secure all tools in lanyards or tool bags. Maintain 3-point contact. Barricade work area below. Harness + lanyard only as last resort (Work at Height Regulations 2005). | 2 × 2 = 4 |
| 4. Manual handling of heavy consumer units, distribution boards, cable drums (up to 50 kg) Harm: Musculoskeletal disorders (MSD), back strain, herniated disc, shoulder injury | 5 × 3 = 15 | Mechanical aids: sack truck, cable drum stand, lifting trolley. Two-person lift for items >25 kg. Kinetic lifting technique training (Manual Handling Operations Regulations 1992). Pre-task dynamic risk assessment. Rotate tasks to reduce repetitive strain. Ensure clear, level access routes. Store materials at waist height where possible. | 3 × 2 = 6 |
| 5. Drilling/chasing walls: dust inhalation (silica, cement), noise >85 dB(A), vibration (HAVS) Harm: Silicosis, lung disease, noise-induced hearing loss, Hand-Arm Vibration Syndrome (HAVS) | 4 × 3 = 12 | Use on-tool dust extraction (HSE Class M vacuum, BS 8520-2). Wet-cutting where feasible. FFP3 disposable respirator (BS EN 149:2001+A1:2009) for dry cutting. Ear defenders (SNR 30 dB, BS EN 352-1) or moulded earplugs. Anti-vibration gloves (BS EN ISO 10819). Limit trigger time: max 15 min per hour. Health surveillance (HAVS, audiometry) for regular users. Rotate operatives. | 2 × 2 = 4 |
Attend site induction; confirm scope, hazards, and emergency procedures. Obtain Permit-to-Work if required (HV or complex LV). Identify supply origin (main isolator, consumer unit, distribution board). Isolate all relevant circuits: switch OFF, withdraw fuses or lock MCB/MCCB in OFF position using unique padlock and 'Danger – Electrician at Work' tag. Prove dead on all poles (L1, L2, L3, N) using calibrated GS38 voltage tester and proving unit. Display 'Isolated – Do Not Switch On' signage at point of isolation. Record isolation in site log.
Erect mobile scaffold tower or podium steps (PASMA-trained operative) with guardrails, toe boards, and safe access. Inspect before first use and weekly thereafter; tag with green 'Safe to Use' label. Barricade work area below with barriers and signage. Stage cable drums on rotating stands, consumer units, and hand tools within easy reach. Set up on-tool dust extraction (Class M vacuum) and connect to 110 V transformer or portable RCD-protected 230 V supply. Confirm emergency stop and first-aid kit locations.
Run cables in prescribed zones (BS 7671 Section 522) using appropriate fixing methods (clips every 300 mm horizontal, 400 mm vertical). Drill/chase walls using on-tool extraction; wear FFP3 mask and ear defenders. Install consumer unit on non-combustible surface ≥1.4 m above floor. Terminate cables using insulated VDE tools; ensure correct polarity (Brown=L, Blue=N, Green/Yellow=E). Install main protective bonding to gas, water, oil services (10 mm² minimum, BS 7671 Reg 411.3.1.2). Label all circuits clearly. Fit RCDs (30 mA Type A for socket circuits, Type F for inverter/EV loads). Install SPD (Type 2) if required by risk assessment.
With supply still isolated, perform dead tests using multifunction tester (Fluke 1664FC or Megger MFT1741): (1) Continuity of protective conductors (R1+R2 <0.05 Ω per metre), (2) Insulation resistance (≥1 MΩ at 500 V DC between live conductors and earth, L-N), (3) Polarity check (all switches in line conductor). Record results on Electrical Installation Certificate (EIC) schedule. Remove LOTO, restore supply under controlled conditions. Perform live tests: (4) Earth fault loop impedance Zs (must be ≤ values in BS 7671 Appendix 2 for MCB disconnection time), (5) RCD trip time (≤40 ms at 5× IΔn, ≤300 ms at 1× IΔn), (6) Functional testing of all switches, sockets, lights.
Energise in sequence: (1) Close main isolator, (2) Switch ON RCDs (check 30 mA test button operates), (3) Switch ON individual MCBs one at a time, monitoring for trips or faults. Balance loads across phases (3-phase boards) to within 10% using clamp meter. Test all socket outlets with socket tester (correct wiring indicator). Operate all lighting circuits, check dimmer/sensor functions. Verify emergency lighting (if applicable) charges and illuminates on mains failure. Measure and record voltage at furthest point (must be 230 V ±10%, BS 7671 Appendix 2). Label consumer unit with maximum demand (A) and date of installation.
Complete and sign Electrical Installation Certificate (EIC) or Minor Electrical Installation Works Certificate (MEIWC) per BS 7671 Part 6. Provide client with: (1) EIC/MEIWC, (2) Schedule of test results, (3) Consumer unit circuit schedule (laminated label), (4) User instructions (RCD testing, emergency procedures), (5) As-built drawings (if applicable). Register installation with local Building Control (Part P notification, England/Wales). Photograph completed installation for records. Remove all waste, packaging, and redundant materials (SWMP, CDM 2015). Demobilise scaffold, clean site, and hand back to client. Retain copies for 6 years (CDM 2015 Reg 4).
**EMERGENCY CONTACT:** Dial 999 (UK) for life-threatening electric shock, arc flash burns, or fall from height. **Electric Shock:** Do NOT touch casualty if still in contact with live conductor. Isolate supply immediately or use non-conductive object (dry wood) to break contact. Check responsiveness, breathing; commence CPR if required (30 compressions : 2 breaths). Apply AED if available. Treat for shock; keep warm. **Arc Flash Burns:** Remove casualty from hazard. Do NOT remove adherent clothing. Cool burn with running water (20 min). Cover with sterile non-adhesive dressing. Treat for shock. **Falls:** Do NOT move casualty if spinal injury suspected. Stabilise head/neck. Call 999. Monitor breathing. **First Aid:** Minimum 1× HSE-appointed First Aider on site (EFAW or FAW certificate). First-aid kit to BS 8599-1. Accident Book (BI 510) entries mandatory. Report RIDDOR injuries (>7 days incapacity, fracture, electric shock requiring resuscitation) to HSE within 15 days via online portal. Preserve evidence; photograph scene. Notify Principal Designer and Client (CDM 2015 Reg 22).
CIS Domestic Reverse Charge (VATA 1994 s.55A, effective 1 March 2021) applies when you (a CIS-registered subcontractor) supply specified construction services (including electrical installation) to another CIS-registered contractor for onward supply to a domestic end-user. In this case, you invoice at 0% VAT and the main contractor accounts for VAT under reverse charge. If you supply directly to a domestic homeowner (non-CIS), or to a commercial end-user (office, factory), you charge standard 20% VAT. Always confirm your client's CIS status (UTR, CIS registration number) and VAT status before issuing the quote. Incorrect VAT treatment triggers HMRC penalties and interest.
Under BS 7671:2018+A2:2022 Part 6 (Chapter 64), the person signing an EIC must be 'competent'—defined as possessing sufficient technical knowledge, experience, and skill. Typically this means: (1) City & Guilds 2365 Level 3 Diploma in Electrical Installations, (2) City & Guilds 2391-52 or 2394-01 Inspection & Testing qualification, (3) 18th Edition (BS 7671:2018+A2:2022) certificate (C&G 2382-22), (4) JIB Approved Electrician (Grade 3) or equivalent, and (5) membership of a Competent Person Scheme (NICEIC, NAPIT, ELECSA) for Part P self-certification in England/Wales. For non-domestic works or Scotland/NI, scheme membership is not legally required but demonstrates competence. Employers must maintain training records and competency matrices (CDM 2015 Reg 9).
JIB (Joint Industry Board) rates are the recognised benchmark for electrical contracting in the UK. As of January 2026, a JIB Approved Electrician (Grade 3) earns circa £21.50–£23.00 per hour basic wage (regional variations apply). Your BoQ labour rate (£32.50/hour in this template) includes: (1) basic wage, (2) employer's NI (13.8%), (3) holiday pay (12.07% accrual), (4) pension contributions (SJIB scheme, ~8%), (5) tool allowance, travel time, and (6) overhead/profit margin (typically 15–25%). For CIS subcontractors, deduct 20% (registered) or 30% (unregistered) CIS tax at source unless holding gross payment status. Always state whether your rate is 'CIS deducted' or 'gross' in the BoQ notes to avoid disputes. Include for PPE, small tools, and testing equipment in preliminaries or as separate line items.
| Operative / Supervisor Name | Trade / Role & CSCS No. | Signature | Date & Time |
|---|---|---|---|
| 1. (Site Supervisor): | |||
| 2. | |||
| 3. | |||
| 4. |
Need a priced commercial quote or site-specific compliance pack instead of a static template? Explore the live SafeSequence® UK studios hosted in AWS London (eu-west-2):