Under COSHH 2002 Regulation 7, DSEAR 2002, and REACH Diisocyanate Training requirements, employers must prevent or adequately control exposure to Sika Sikalastic polyurethane roofing products containing flammable solvents (GHS02), respiratory sensitisers, and skin irritants (GHS07, GHS08). Mandatory engineering controls include forced mechanical ventilation achieving ≥10 air changes/hour, ignition source isolation within 10m radius, and respiratory protective equipment (RPE) with assigned protection factor ≥20. Target residual risk: ≤8 (Tolerable) through hierarchy of control implementation, competent person supervision, and documented pre-task atmospheric monitoring.
| Identified Hazard & Harm | Initial Risk (L×S) | Mandatory Engineering, Isolation & Procedural Controls | Residual Risk |
|---|---|---|---|
| 1. Inhalation of isocyanate vapours and organic solvent fumes during mixing, application, and curing Harm: Respiratory sensitisation (occupational asthma), acute respiratory irritation, long-term irreversible lung damage. Symptoms include chest tightness, wheezing, shortness of breath. Latent sensitisation may develop after repeated low-level exposure. | 4 × 4 = 16 | Engineering: Install ATEX-certified mechanical ventilation achieving minimum 10 air changes/hour with ducting to external atmosphere. Position extract points at low level (vapours heavier than air). Administrative: Conduct pre-work atmospheric monitoring for VOCs <50% OEL. Enforce mandatory RPE (ABEK1P3 filters, APF≥20) with documented face-fit testing. Restrict access to 10m exclusion zone. Implement REACH-compliant diisocyanate training certification (valid 5 years). Medical surveillance: Annual respiratory health surveillance per HSE G404. PPE: Mandatory half-mask respirator with combined filters, changed per manufacturer schedule or when breathing resistance increases. | 3 × 2 = 6 |
| 2. Fire and explosion risk from flammable solvent vapours in confined roof spaces Harm: Catastrophic fire/explosion causing severe burns, fatalities, structural collapse. Vapour-air mixtures within LEL-UEL range (typically 1-10% v/v) ignited by static discharge, hot works, electrical equipment, or smoking materials. | 3 × 5 = 15 | DSEAR Assessment: Classify work area as Zone 2 hazardous area during application and 24-hour cure period. Isolation: Implement 10-metre hot work exclusion zone with physical barriers and signage. Lockout/tagout all non-intrinsically safe electrical equipment. Issue Permit-to-Work with ignition source checklist. Bonding/Earthing: Verify continuity <10⁶ ohms between all conductive equipment and verified earth point before material transfer. Use only ATEX-certified tools and lighting (Category 3G). Monitoring: Continuous LEL monitoring with audible alarm set at 10% LEL; evacuate if >20% LEL detected. Provide CO₂ or foam fire extinguishers (minimum 6kg) at 10m intervals. Prohibit smoking within 25m radius. | 2 × 4 = 8 |
| 3. Dermal contact causing skin sensitisation and allergic contact dermatitis Harm: Irreversible skin sensitisation (H317) leading to chronic allergic dermatitis. Once sensitised, workers cannot tolerate future isocyanate exposure. Symptoms: severe itching, redness, blistering, weeping lesions on hands, forearms, face. | 5 × 3 = 15 | Substitution: Evaluate lower-hazard water-based alternatives where specification permits. Engineering: Provide dedicated wash station with emergency eyewash within 10m of work area. Supply barrier cream (pre-work) and after-work skin conditioning cream. Administrative: Implement 'no skin contact' policy with disciplinary enforcement. Provide changing facilities to prevent contamination of personal clothing. Conduct pre-employment and periodic skin surveillance. Training: Demonstrate correct glove donning/doffing technique to prevent contamination. PPE: Mandatory nitrile gloves (BS EN 374-1 Type B, >0.38mm, permeation >480 min). Inspect gloves every 30 minutes; replace immediately if compromised. Disposable coveralls with elasticated wrists/ankles (Type 4 minimum). | 4 × 2 = 8 |
| 4. Eye contact with liquid components causing serious irritation and potential corneal damage Harm: Serious eye irritation (H319) with pain, redness, blurred vision. Uncured isocyanate contact may cause corneal burns requiring emergency medical treatment. Risk of permanent vision impairment if not irrigated immediately. | 4 × 3 = 12 | Engineering: Install plumbed eyewash station (BS EN 15154-2:2006) delivering 6 litres/minute for 15 minutes, tested weekly with records retained. Position within 10-second travel time from application area. Administrative: Display emergency eye irrigation procedure at eyewash station. Designate trained first aider on-site during all application works. Maintain emergency contact details for occupational health/ophthalmology services. Training: Demonstrate eyewash operation during site induction; practice with eyes closed. PPE: Mandatory safety goggles (BS EN 166 Grade 3, optical class 1) with indirect ventilation PLUS face shield for pouring/mixing operations. Ensure goggles compatible with respirator seal. | 3 × 2 = 6 |
| 5. Exposure to hazardous substances during confined space roof void application Harm: Acute oxygen deficiency, rapid unconsciousness, and asphyxiation in poorly ventilated roof voids. Accumulation of solvent vapours displacing oxygen below 19.5%. Compounded by heat stress in summer months causing heat exhaustion and impaired judgment. | 3 × 5 = 15 | Confined Space Entry: Conduct formal confined space risk assessment per BS 8454:2020. Issue Confined Space Entry Permit with atmospheric testing (O₂ 19.5-23%, LEL <10%, VOC <50% WEL). Appoint competent confined space supervisor (external to space). Engineering: Provide forced mechanical ventilation with ducted fresh air supply and extract. Maintain positive pressure where practicable. Install continuous multi-gas monitoring with remote alarm to supervisor. Emergency: Station rescue team with retrieval equipment (tripod, winch, harness) outside entry point. Prohibit entry for rescue without BA and second standby person. Provide emergency escape breathing apparatus (EEBA) for entrants. Communication: Maintain continuous visual/radio contact; implement 'buddy check' every 15 minutes. Limit work duration to 45-minute shifts with 15-minute breaks in fresh air. | 2 × 3 = 6 |
Establish 10m exclusion zone with physical barriers and DSEAR hazardous area signage. Issue Permit-to-Work and Confined Space Entry Permit if applicable. Conduct atmospheric testing using calibrated multi-gas detector (bump-tested same day): verify O₂ 19.5-23%, LEL <10%, VOC <50% WEL. Record baseline readings on permit. Lockout/tagout all non-ATEX electrical equipment within zone; verify isolation with voltage tester. Establish earthing point and verify continuity <10⁶ ohms. Position ATEX-certified mechanical ventilation fans to achieve ≥10 air changes/hour; measure and record airflow. Confirm emergency eyewash station operational (weekly test record checked). Verify all operatives hold valid REACH diisocyanate training certificates (within 5 years). Conduct toolbox talk covering emergency procedures, RPE requirements, and exclusion zone boundaries. HOLD POINT: Site manager and competent person sign permit confirming all controls in place before material delivery.
Don all mandatory PPE: nitrile gloves (inspect for defects), ABEK1P3 respirator (seal check per HSE INDG479), safety goggles, face shield, chemical-resistant coveralls, antistatic boots. Verify RPE face-fit test certificate current (within 12 months). Ground containers to verified earth point using bonding cables; confirm continuity <10⁶ ohms with multimeter. Slowly decant components into clean, earthed mixing vessel—avoid splashing and static generation. Use only non-sparking bronze tools for stirring. Mix components per manufacturer's technical data sheet (typically 1:1 or pre-catalysed single component). Maintain continuous atmospheric monitoring; if LEL exceeds 10%, cease work and increase ventilation. Keep containers sealed when not in use. Position CO₂ fire extinguisher within 3m reach. Limit mixed material to 30-minute pot life quantities to minimise waste and exposure duration. HOLD POINT: Supervisor verifies correct mixing ratios, earthing continuity, and atmospheric levels before application commences.
Ensure mechanical ventilation remains operational throughout preparation phase. Use non-sparking scrapers and brushes to remove loose debris, dust, and contaminants from roof substrate. Avoid actions generating sparks (grinding, cutting) within exclusion zone—if essential, issue separate Hot Work Permit with additional fire watch. Vacuum debris using ATEX-certified vacuum cleaner (do not use compressed air which disperses dust and creates static). Wipe surface with lint-free cloths dampened with approved solvent cleaner if specified—dispose of solvent-soaked cloths immediately into sealed metal waste container (spontaneous combustion risk). Apply Sika primer using brush or roller with extended handle to minimise bending. Work in well-ventilated direction (upwind to downwind). Monitor atmospheric VOC levels every 30 minutes; record on permit. Allow primer to cure per technical data (typically 1-4 hours depending on temperature/humidity). Restrict access during cure period; maintain ventilation and exclusion zone. HOLD POINT: Verify primer fully cured (tack-free) and atmospheric levels remain <50% WEL before membrane application.
Re-confirm all PPE correctly fitted; conduct respirator positive/negative pressure seal check. Verify atmospheric conditions remain within safe parameters (O₂, LEL, VOC). Pour Sikalastic membrane onto primed substrate in manageable sections (typically 5-10m² to maintain wet edge). Use lambswool roller or squeegee with extended handle to spread membrane to specified thickness (typically 1.5-3mm depending on system). Apply in multiple thin coats rather than single thick coat to reduce VOC emission rate and improve cure. Maintain continuous mechanical ventilation; reposition extract fans as work progresses. Rotate operatives every 45 minutes to limit individual exposure duration; breaks taken in fresh air outside exclusion zone. Inspect gloves every 30 minutes for swelling/degradation; replace immediately if compromised. Seal partially used containers immediately to minimise vapour release. Clean tools with approved solvent in well-ventilated area; dispose of cleaning waste into sealed metal containers. Monitor atmospheric levels every 30 minutes; if VOC exceeds 50% WEL or LEL exceeds 10%, cease work and increase ventilation. HOLD POINT: Supervisor inspects membrane coverage, thickness, and edge details before declaring section complete.
Maintain mechanical ventilation for minimum 24 hours post-application or until atmospheric monitoring confirms VOC levels <10% WEL, whichever is longer. Continue DSEAR Zone 2 classification and 10m exclusion zone during cure period—maintain barriers and signage. Conduct atmospheric monitoring at 2-hour intervals for first 8 hours, then 4-hourly; record all readings on permit. Prohibit hot works, smoking, and non-ATEX equipment within 25m radius until fully cured. In cold/humid conditions (substrate temperature <10°C, RH >85%), curing may extend to 48-72 hours—adjust monitoring schedule accordingly. Protect uncured membrane from rainfall, foot traffic, and contamination using temporary coverings if necessary (ensure coverings do not trap vapours). Post warning signs: 'Hazardous Atmosphere—Respiratory Protection Required—No Unauthorised Access'. Maintain fire extinguisher provision throughout cure period. HOLD POINT: Competent person confirms atmospheric levels safe (<10% WEL VOC, <5% LEL) and membrane fully cured (tack-free, no solvent odour) before permitting general access or subsequent trades.
Segregate waste into appropriate streams: (1) Empty containers—triple-rinsed and labelled 'Hazardous Waste—Isocyanate Residue'; (2) Used PPE (gloves, coveralls, respirator filters)—sealed in heavy-duty polythene bags labelled 'Contaminated PPE—Isocyanate'; (3) Solvent-soaked rags and cleaning materials—sealed metal containers labelled 'Flammable Hazardous Waste'. Complete Hazardous Waste Consignment Notes per Environmental Protection Act 1990 and Special Waste Regulations. Arrange collection by licensed waste carrier (EA/SEPA registered); retain consignment note copies for 3 years. Decontaminate tools using approved solvent in well-ventilated area; allow to air-dry before storage. Remove exclusion zone barriers and signage only after atmospheric testing confirms background levels. Conduct post-work inspection for spills, contamination, or residual hazards. Provide welfare facilities for operatives to shower and change before leaving site (prevent take-home contamination). Complete Permit-to-Work close-out: record final atmospheric readings, waste consignment numbers, and any incidents/near-misses. File all records (permits, atmospheric logs, training certificates, waste notes) for minimum 5 years per COSHH Regulation 12. HOLD POINT: Site manager and H&S advisor sign-off confirming compliant waste disposal and site returned to normal operations.
INHALATION: Remove casualty to fresh air immediately. If breathing is difficult, administer oxygen if trained and available. If breathing has stopped, commence CPR and summon emergency services (999/112). Keep casualty warm and at rest in semi-recumbent position. Do NOT induce vomiting. Seek immediate medical attention—inform paramedics of isocyanate exposure and provide Safety Data Sheet. Monitor for delayed respiratory symptoms (occupational asthma may develop hours after exposure). SKIN CONTACT: Remove contaminated clothing immediately (cut off if necessary to avoid pulling over head/face). Wash affected area with copious soap and lukewarm water for minimum 15 minutes. Do NOT use solvents or thinners to clean skin (increases absorption). Apply skin conditioning cream if available. Seek medical attention if irritation, redness, or sensitisation symptoms develop. Launder contaminated clothing separately before reuse or dispose as hazardous waste. EYE CONTACT: Irrigate eyes immediately with clean water or eyewash solution for minimum 15 minutes, holding eyelids open. Remove contact lenses if present and easy to do—continue irrigation. Seek immediate medical attention from ophthalmologist or A&E—inform of isocyanate exposure. Do NOT rub eyes. INGESTION: Rinse mouth thoroughly with water. Do NOT induce vomiting (aspiration risk). Give small amounts of water to drink if conscious. Seek immediate medical attention—provide Safety Data Sheet. FIRE: Evacuate area immediately; summon Fire & Rescue Service (999). Use CO₂, foam, or dry powder extinguishers—do NOT use water jet (spreads burning liquid). Wear full BA and chemical-resistant suit. Flammable vapours heavier than air—may travel to ignition sources. Cool containers with water spray from protected position. SPILLAGE: Evacuate area; eliminate ignition sources. Wear full PPE including RPE. Contain spill with absorbent booms or sand. Absorb liquid with vermiculite or proprietary absorbent. Collect into sealed metal containers labelled 'Hazardous Waste—Flammable Isocyanate'. Ventilate area thoroughly. Do NOT wash into drains (environmental contamination). Report significant spills to Environment Agency Incident Hotline 0800 807060. EMERGENCY CONTACTS: Emergency Services 999/112 | HSE Incident Contact Centre 0345 300 9923 | Environment Agency 0800 807060 | NHS 111 | Poison Centre (NPIS) via 111 or A&E.
Competent Person & Operative Declaration: By signing below, the Site Supervisor confirms this assessment has been adapted and verified for actual site conditions, and operatives confirm they have attended the pre-start Toolbox Talk for Sika Sikalastic Cold-Applied Liquid Polyurethane Roofing Membrane & Primer and will follow the safe system of work.
| Operative / Supervisor Name | Trade / Role & CSCS No. | Signature | Date & Time |
|---|---|---|---|
| 1. (Site Supervisor): | |||
| 2. | |||
| 3. | |||
| 4. | |||
| 5. | |||