This COSHH assessment covers the safe changeover of commercial LPG propane cylinders and bulk refuelling operations in accordance with DSEAR 2002, COSHH 2002, and UKLPG Code of Practice 1. LPG (Liquefied Petroleum Gas) is classified under GHS02 (Flammable Gas) and GHS04 (Pressurised Gas), presenting significant fire, explosion, asphyxiation, and cold burn hazards. This document establishes mandatory control measures including engineering controls, isolation procedures (LOTO), competency requirements, and emergency response protocols. All operatives must be trained to UKLPG standards and hold valid Gas Safe or equivalent certification where applicable. Operations must be conducted in well-ventilated areas, away from ignition sources, with appropriate gas detection equipment operational. This assessment applies to cylinder changeover operations (typically 19kg to 47kg cylinders) and bulk tank refuelling from road tankers. Risk assessments must be reviewed annually or following incident/near-miss events.
| Identified Hazard & Harm | Initial Risk (L×S) | Mandatory Engineering, Isolation & Procedural Controls | Residual Risk |
|---|---|---|---|
| 1. Fire and explosion from LPG release and ignition Harm: Catastrophic burns, fatalities, property destruction, multiple casualties |
4 × 5 = 20 | DSEAR Zone 1/2 classification enforced. All electrical equipment ATEX-rated. Hot work permit system mandatory within 10m. Eliminate ignition sources (no smoking, mobile phones, vehicles). Bonding and earthing of bulk tanks during refuelling. Emergency isolation valves tested monthly. Operations only in well-ventilated outdoor areas or approved LPG compounds. Gas detection interlocked to ventilation/alarm systems. Competent person supervision (UKLPG trained). 9kg ABC powder or CO2 fire extinguishers within 5m. | 2 × 5 = 10 |
| 2. Asphyxiation from LPG displacement of oxygen in confined or poorly ventilated spaces Harm: Unconsciousness, brain damage, death within minutes |
3 × 5 = 15 | Cylinder changeover prohibited in confined spaces, basements, or poorly ventilated areas. Continuous atmospheric monitoring with calibrated multi-gas detector (O2 >19.5%, LEL <10%). Forced ventilation systems operational and verified before work. Buddy system for all operations. Emergency rescue plan and equipment (BA sets) available. Operatives trained in confined space hazards and emergency response. Area evacuation at 10% LEL alarm threshold. | 1 × 5 = 5 |
| 3. Cryogenic burns and frostbite from contact with liquid LPG or rapid gas expansion Harm: Severe cold burns, tissue necrosis, permanent scarring, eye damage |
4 × 3 = 12 | Mandatory cold-insulation gloves (BS EN 511) and face protection during all connection/disconnection. Slow opening of valves to prevent rapid depressurisation. Cylinders warmed to ambient temperature before changeover (no artificial heating). Emergency eyewash station within 10m. First aid trained personnel on site. Defective valves/regulators isolated and tagged - no forced operation. Leak testing only with approved detection fluid, never with naked flame. | 2 × 3 = 6 |
| 4. Manual handling injuries from lifting/moving heavy LPG cylinders (19-47kg) Harm: Musculoskeletal injuries, back strain, crush injuries to feet/hands, hernias |
5 × 3 = 15 | Mechanical handling aids mandatory for cylinders >19kg (trolleys, sack trucks with non-sparking wheels). Team lift procedures for 47kg cylinders (minimum 2 persons). Manual handling training refreshed annually. Cylinder storage at waist height where practicable. Clear, level access routes maintained. Metatarsal protection footwear mandatory. Cylinders never rolled or dragged. Pre-use inspection of handling equipment. Operatives with musculoskeletal conditions risk-assessed individually. | 2 × 2 = 4 |
| 5. Uncontrolled release during bulk refuelling from road tanker connection failure or overfill Harm: Major LPG vapour cloud, mass evacuation, explosion risk, environmental incident |
3 × 5 = 15 | Only UKLPG-certified tanker drivers permitted. Pre-delivery site safety briefing mandatory. Earthing bond connected before hose coupling. Overfill prevention device (OPD) and contents gauge verified functional. Emergency shut-off valve (ESOV) tested before transfer. Delivery supervised by competent site person throughout. 10m exclusion zone enforced - no public access, ignition sources, or vehicles. Hose integrity inspected pre-connection. Maximum fill 85% tank capacity verified. Spill kit and emergency procedures displayed. Weather conditions assessed (no operations in electrical storms). | 1 × 5 = 5 |
Conduct visual inspection of work area ensuring adequate ventilation (outdoor or approved LPG compound). Verify no ignition sources within 10m (smoking materials, hot work, vehicles, electrical equipment). Calibrate and zero multi-gas detector in fresh air, then conduct atmospheric monitoring at ground level (LPG heavier than air). Confirm O2 >19.5% and LEL <10%. Inspect cylinder trolley/handling equipment for damage. Verify fire extinguishers in date and accessible. Confirm all operatives wearing mandatory PPE (fire-retardant coveralls, cold-insulation gloves, metatarsal footwear, eye protection). Review emergency procedures and muster point. Obtain hot work permit if any ignition risk activities planned nearby.
Close cylinder valve fully (clockwise) on empty/depleted cylinder. Close downstream isolation valve on appliance/manifold. Allow system to depressurise naturally - do not force venting. Disconnect regulator or flexible hose using correct LPG spanners (two-wrench technique to prevent stress on cylinder valve). Inspect connection threads and sealing washer for damage. Cap cylinder outlet immediately with dust cap. Check for residual gas smell - if present, move cylinder to outdoor storage area for full venting. Label empty cylinder clearly and segregate from full cylinders. Record cylinder serial number and date of changeover in logbook.
Inspect new cylinder for damage (dents, corrosion, valve damage, out-of-date test certification). Verify cylinder test date is within 10 years (stamped on collar). Check cylinder valve is closed (turn clockwise until hand-tight). Remove dust cap and inspect outlet thread and valve seat for damage or contamination. Fit new sealing washer (never reuse old washers). Position cylinder securely upright on firm, level surface or in approved cylinder cage. Connect regulator or flexible hose hand-tight, then tighten with correct spanner (typically 1-1.5 turns). Do not over-tighten. Ensure hose is not kinked, abraded, or in contact with sharp edges.
Slowly open cylinder valve one full turn (anti-clockwise). Apply approved leak detection fluid (soapy water solution or proprietary detector) to all connections: cylinder valve outlet, regulator connection, hose connections, and appliance inlet. Observe for 30 seconds - any bubble formation indicates leak. If leak detected, close cylinder valve immediately, depressurise system, and re-make connection with new sealing washer. Re-test until no leaks present. Alternatively, use electronic leak detector (BS EN 14624) scanning all connections. Once leak-free, open downstream isolation valve. Purge air from system at appliance pilot or purge point until consistent gas flow (typically 30-60 seconds). Test appliance ignition and operation.
Verify tanker driver holds valid UKLPG certification and ADR licence. Conduct pre-delivery briefing covering emergency procedures, ESOV location, and exclusion zone. Establish 10m exclusion zone with barriers/cones - no public access or vehicles. Connect earthing bond between tanker and bulk tank. Verify tank contents gauge and overfill prevention device (OPD) operational. Inspect delivery hose for damage. Connect hose to tank inlet using correct couplings - ensure dry-break coupling fully engaged. Open tank inlet valve, then tanker outlet valve slowly. Monitor delivery continuously - never leave unattended. Verify maximum 85% fill level not exceeded. On completion, close tanker valve first, then tank valve. Depressurise hose into tanker. Disconnect hose and replace dust caps. Remove earthing bond. Conduct final leak test of tank connections.
Conduct final atmospheric monitoring at ground level to confirm LEL <10% and no residual gas present. Inspect all connections visually for signs of frost (indicating leak). Verify all cylinder valves closed on stored cylinders. Ensure empty cylinders segregated and clearly labelled. Return all tools and equipment to designated storage. Remove exclusion zone barriers if bulk refuelling conducted. Complete LPG operations logbook recording: date, time, operative names, cylinder serial numbers, atmospheric monitoring results, and any defects/incidents. Report any near-miss events or equipment defects to supervisor immediately. Ensure fire extinguishers remain accessible. Confirm emergency contact numbers displayed. Decontaminate and inspect PPE - replace if damaged.
EMERGENCY RESPONSE: In the event of LPG release: Evacuate area immediately to upwind location minimum 50m. Activate fire alarm if applicable. Call 999 (Fire & Rescue) and inform of LPG incident. Contact LPG supplier emergency line (number on cylinder/tank). Eliminate all ignition sources - do not operate electrical switches. Do not attempt to stop major leak unless safe to do so (close remote isolation valve only). Establish exclusion zone and prevent public access. If fire occurs: Evacuate immediately, call 999, do not attempt firefighting unless trained and fire is small (incipient stage). Use CO2 or dry powder extinguisher only - never water. If cylinder involved in fire, cool with water from safe distance if possible, but evacuate if cylinder shows signs of distortion or flame impingement on cylinder body (BLEVE risk). FIRST AID: Inhalation - Move casualty to fresh air immediately, keep warm and at rest, administer oxygen if trained and available, call 999 if unconscious or breathing difficulty. Skin contact with liquid LPG (cold burns) - Remove contaminated clothing, irrigate affected area with lukewarm water (not hot) for minimum 20 minutes, cover with sterile dressing, seek immediate medical attention - do not apply creams. Eye contact - Irrigate with eyewash or clean water for minimum 15 minutes, seek immediate medical attention. All LPG exposure incidents require medical assessment even if symptoms appear minor. Report all incidents via RIDDOR if 7-day injury or dangerous occurrence (uncontrolled LPG release).
Under DSEAR 2002 Regulation 7, employers must ensure a suitable and sufficient risk assessment is conducted for all work involving dangerous substances (LPG classified as extremely flammable). Regulation 11 requires elimination or reduction of risks through substitution, engineering controls, and safe systems of work. Only competent persons may conduct LPG operations - competence is demonstrated through UKLPG-approved training (typically Code of Practice 1 awareness as minimum), understanding of LPG hazards, and practical experience. For commercial installations, operatives should hold Gas Safe registration (formerly CORGI) or equivalent LPG-specific certification. Employers must provide adequate information, instruction, and training (Regulation 9), and ensure equipment is suitable for ATEX zoning requirements. Annual refresher training is industry best practice. The responsible person must be identified in writing and have authority to stop unsafe work.
DSEAR 2002 Schedule 1 requires classification of areas where explosive atmospheres may occur into zones (Zone 0, 1, or 2 for gases). For LPG cylinder storage and changeover, zoning depends on release likelihood and ventilation. Outdoor storage with good natural ventilation typically requires Zone 2 classification (explosive atmosphere unlikely or brief duration) extending 1.5-3m from cylinder valves. Indoor storage or poorly ventilated areas may require Zone 1 (explosive atmosphere likely during normal operation). A competent person (often a specialist consultant) must conduct the zoning assessment considering release scenarios, ventilation rates, and LPG properties (heavier than air, accumulates at low levels). Once zones are established, all electrical equipment within zones must be ATEX-certified to appropriate category (e.g., Category 2G for Zone 1, Category 3G for Zone 2). This includes lighting, gas detectors, mobile phones, and tools. Non-electrical equipment should be non-sparking (bronze/brass tools). Zoning must be reviewed if layout, ventilation, or operations change, and zones must be marked with EX signage at entry points.
UKLPG Code of Practice 1 (Part 1) establishes industry standards for LPG cylinder storage that support compliance with DSEAR 2002 and Regulatory Reform (Fire Safety) Order 2005. Key requirements include: cylinders must be stored outdoors or in well-ventilated fire-resistant enclosures; minimum 3m separation from buildings, boundaries, and ignition sources; segregation of full and empty cylinders with clear labelling; cylinders stored upright and secured to prevent falling; maximum storage quantities determined by risk assessment and local authority licensing (typically 1 tonne for unlicensed storage); no storage in basements, confined spaces, or near drains/gullies where gas can accumulate; storage areas must have appropriate signage (LPG hazard warnings, no smoking, emergency contact numbers); fire extinguishers (minimum 9kg powder or CO2) located within 5m but outside potential fire zone; and emergency access maintained at all times. Under the Fire Safety Order, the responsible person must conduct a fire risk assessment specifically addressing LPG storage, ensure means of escape are not compromised, and provide staff training. Local Fire & Rescue Services should be consulted for large storage quantities, and some premises may require licensing under the Petroleum (Consolidation) Regulations 2014 if storage exceeds specified thresholds.
Competent Person & Operative Declaration: By signing below, the Site Supervisor confirms this assessment has been adapted and verified for actual site conditions, and operatives confirm they have attended the pre-start Toolbox Talk for Commercial LPG Propane Cylinder Changeover & Bulk Refuelling and will follow the safe system of work.
| Operative / Supervisor Name | Trade / Role & CSCS No. | Signature | Date & Time |
|---|---|---|---|
| 1. (Site Supervisor): | |||
| 2. | |||
| 3. | |||
| 4. | |||
| 5. | |||
| 6. |