SafeSequence › UK Safety Template Library › Commercial Brand COSHH › Mapei Ultraplan Renovation Screed & Keraquick Rapid-Set Cementitious Adhesive
Reference UK COSHH Example • Commercial Brand COSHH

Mapei Ultraplan Renovation Screed & Keraquick Rapid-Set Cementitious Adhesive (COSHH Template & 5x5 Risk Assessment)

Under COSHH Regulations 2002, Mapei Ultraplan Renovation Screed and Keraquick Rapid-Set Cementitious Adhesive containing respirable crystalline silica (RCS) must not exceed the EH40/2005 Workplace Exposure Limit of 0.1 mg/m³ (8-hour TWA). Products are classified under CLP as GHS05 (Serious Eye Damage H318) and GHS07 (Skin Sensitisation H317), mandating engineering controls, local exhaust ventilation (LEV), wet methods, and isolation procedures to reduce residual risk to tolerable levels (≤8 on 5×5 matrix). This COSHH assessment provides statutory control measures, PPE specifications to BS EN standards, and emergency protocols for commercial flooring and tiling operations involving these rapid-set cementitious materials.

Statutory FrameworkCOSHH Regulations 2002, EH40/2005 RCS WEL (0.1 mg/m3), CLP (GHS05 Serious Eye Damage H318, GHS07 H317)
ClassificationGHS05 (Corrosion) - Causes serious eye damage (H318). GHS07 (Exclamation Mark) - May cause an allergic skin reaction (H317). Contains cement and respirable crystalline silica (RCS). EH40/2005 Workplace Exposure Limit for RCS: 0.1 mg/m³ (8-hour time-weighted average). CLP Regulation (EC) No 1272/2008 classification applies. Not classified as dangerous goods for transport under ADR/RID. Chromium (VI) content reduced below sensitising threshold in accordance with REACH Annex XVII Entry 47.
Required Plant / KitClass H (HEPA-filtered) vacuum cleaner compliant with BS EN 60335-2-69 for dust extraction • On-tool LEV (Local Exhaust Ventilation) system with minimum air velocity 20 m/s at capture point • Forced-action paddle mixer with variable speed control (300-600 rpm) and dead-man switch • Calibrated digital hygrometer for substrate moisture measurement (±2% accuracy) • Stainless steel notched trowel (A1, A2, B1, or C1 notch profile per BS EN 12004) with ergonomic handle
Site Sign-Off StatusRequires Competent Person Verification
Instant AI Customization or Free Blank Word (.doc) Download

Need this COSHH customized with your Company Name, Site Postcode & Nearest A&E Hospital?

Dictate your site specifics on your phone in 45 seconds to auto-compile a signed PDF—or download our free blank Word (.doc) shell below.

Auto-Fill via Voice / CLP (45s)

1. Mandatory Personal Protective Equipment (BS EN Standards)

BS EN ISO 374-1:2016 Type B (KPT), BS EN 420:2003+A1:2009
Nitrile chemical-resistant gloves (minimum 0.38mm thickness)
Protection against alkaline cement exposure (pH 12-13) and prevention of allergic contact dermatitis from chromium and sensitising agents (H317). Minimum breakthrough time 30 minutes.
BS EN 140:1999, BS EN 143:2000 (P3 filter), BS EN 149:2001+A1:2009 (FFP3)
Full-face respirator with P3 particulate filter or half-mask FFP3 respirator
Mandatory respiratory protection against respirable crystalline silica (RCS) to maintain exposure below EH40/2005 WEL of 0.1 mg/m³. Assigned Protection Factor (APF) minimum 20 for half-mask, 40 for full-face.
BS EN 166:2001 (Optical Class 1, marking 3 or 4 for liquid splash)
Safety goggles with indirect ventilation or full-face shield
Essential protection against serious eye damage (H318) from alkaline cement slurry and dust. Must provide sealed protection against liquid splashes and airborne particulates during mixing and application.
BS EN ISO 20345:2011 S3 (SRC slip resistance, penetration resistant midsole, water-resistant upper)
Safety footwear with chemical-resistant sole and penetration resistance
Protection against wet cement contact causing chemical burns, slip hazards on contaminated surfaces, and penetration injuries from substrate preparation debris.

2. 5×5 Hazard Risk Assessment Matrix (HASAWA 1974 / MHSWR 1999)

Identified Hazard & HarmInitial Risk (L×S)Mandatory Engineering, Isolation & Procedural ControlsResidual Risk
1. Inhalation of respirable crystalline silica (RCS) dust during mixing, pouring, and surface preparation
Harm: Silicosis (irreversible lung fibrosis), chronic obstructive pulmonary disease (COPD), lung cancer (IARC Group 1 carcinogen), and acute respiratory irritation
4 × 5 = 20Implement on-tool LEV extraction with minimum 20 m/s capture velocity. Use wet mixing methods and pre-mixed slurries where practicable. Conduct air monitoring to verify exposure <0.1 mg/m³ (EH40/2005 WEL). Enforce RPE (FFP3 minimum APF 20) during all dusty operations. Isolate work area with physical barriers and warning signage. Provide thorough examination and testing (TExT) of LEV every 14 months per HSG258. Implement health surveillance (respiratory questionnaire and spirometry) for workers with regular RCS exposure per COSHH Regulation 11.2 × 3 = 6
2. Serious eye damage from alkaline cement contact (pH 12-13) during mixing and application
Harm: Chemical burns to cornea and conjunctiva, permanent vision impairment, serious eye damage (H318 classification), and potential blindness
3 × 5 = 15Mandatory use of BS EN 166 sealed safety goggles or full-face shield during all mixing and application activities. Install emergency eyewash station within 10 metres of work area, tested weekly. Use closed mixing systems or add powder to water slowly to minimise splashing. Provide face shields for pouring operations. Enforce strict no-contact policy with eyes/face before handwashing. Train operatives in immediate irrigation protocol (15 minutes continuous flushing). Isolate mixing area from other trades to prevent inadvertent exposure.2 × 3 = 6
3. Allergic contact dermatitis and skin sensitisation from chromium (VI) and cement alkalinity (H317)
Harm: Chronic dermatitis, skin sensitisation requiring permanent exclusion from cement work, painful skin fissures, and occupational skin disease reportable under RIDDOR
4 × 3 = 12Enforce mandatory use of BS EN ISO 374-1 Type B nitrile gloves (minimum 0.38mm) with 30-minute breakthrough time. Implement pre-work skin protection (barrier creams to BS EN 1499) and post-work emollient use. Provide washing facilities with pH-neutral soap within immediate work area. Conduct skin surveillance (visual inspection) monthly per HSG264. Use low-chromium cement products (<2 ppm Cr(VI)) compliant with REACH Annex XVII Entry 47. Prohibit dry wiping of cement residue. Enforce immediate washing protocol for any skin contact. Rotate tasks to minimise prolonged exposure.2 × 2 = 4
4. Manual handling injuries during transport and pouring of 25kg bags and mixed material
Harm: Musculoskeletal disorders (MSDs) including lower back strain, shoulder injuries, and chronic spinal damage requiring medical treatment
5 × 3 = 15Conduct task-specific manual handling risk assessment per Manual Handling Operations Regulations 1992. Limit individual bag handling to maximum 25kg. Use mechanical aids (sack trolleys, pallet trucks) for transport over 5 metres. Implement two-person lift protocol for bags above waist height. Position materials at waist height (750-1050mm) to eliminate bending. Use pump systems for large-area screed application to eliminate manual carrying. Provide manual handling training emphasising neutral spine posture and kinetic lifting technique. Rotate operatives every 2 hours for repetitive pouring tasks.3 × 2 = 6
5. Slips, trips, and falls on wet cement surfaces and contaminated access routes
Harm: Fractures, head injuries, lacerations, and potential major injury reportable under RIDDOR Regulation 4
4 × 3 = 12Establish designated clean access routes with physical barriers (Heras fencing or equivalent). Implement continuous housekeeping protocol with immediate spillage cleanup using wet methods (never dry sweeping). Use anti-slip walkway boards (minimum 600mm width) across wet work areas. Enforce SRC-rated safety footwear (BS EN ISO 20345 S3). Provide adequate task lighting (minimum 200 lux for general work, 500 lux for detailed application). Segregate pedestrian routes from material transport paths. Conduct pre-shift workplace inspection with documented checklist. Remove tripping hazards (cables, hoses) using cable ramps or overhead routing.2 × 2 = 4

3. Step-by-Step Safe Sequence of Operations & Hold-Points

1

Pre-Work Site Assessment, Ventilation Setup, and Material Isolation

Preparation and Isolation

Conduct documented pre-task risk assessment and toolbox talk covering RCS hazards, H318 eye damage, and H317 skin sensitisation. Verify substrate moisture content <2.5% for Ultraplan or as per technical datasheet. Establish physical barriers (Heras fencing minimum 2m perimeter) and display COSHH warning signage (GHS05, GHS07 pictograms). Set up on-tool LEV system and verify airflow at capture point (minimum 20 m/s using anemometer). Position emergency eyewash station within 10m and verify functionality. Stage materials in designated area at waist height (750-1050mm). Confirm all operatives have completed face-fit testing for RPE (FFP3) within last 12 months and hold valid training certificates.

Critical Hold-Point: STOP: Do not proceed until LEV system is operational and verified. Confirm all operatives wearing FFP3 respirators (APF ≥20), sealed goggles (BS EN 166), and nitrile gloves (BS EN ISO 374-1). Ensure emergency eyewash is functional and accessible.
2

Controlled Mixing of Cementitious Material with Dust Suppression

Mixing and Preparation

Don full PPE ensemble: FFP3 respirator, sealed goggles, nitrile gloves, and protective coveralls. Position mixing bucket within LEV capture zone or use on-tool extraction. Add measured clean water to mixing vessel FIRST (never add powder to empty bucket). Slowly pour powder into water to minimise dust generation. Use forced-action paddle mixer at low speed (300-400 rpm) for initial 30 seconds, then increase to 500-600 rpm. Mix for duration specified in product datasheet (typically 2-3 minutes for Ultraplan, 1-2 minutes for Keraquick). Scrape sides of bucket to ensure homogeneous consistency. Allow material to stand for 1 minute (slaking period), then re-mix briefly. Verify pot life and working time per technical datasheet.

Critical Hold-Point: HOLD POINT: Inspect mixed material for lumps or dry pockets indicating inadequate mixing. Never add additional powder to mixed material as this increases dust exposure. If splashing occurs, stop immediately and irrigate affected skin/eyes for 15 minutes before continuing.
3

Controlled Pouring and Spreading with Exposure Minimisation

Application

Maintain FFP3 respiratory protection throughout application phase. For Ultraplan screed: pour mixed material onto prepared substrate starting from furthest point, working backwards towards exit. Use gauge rake or levelling frame to achieve specified thickness (typically 3-50mm). For Keraquick adhesive: apply using notched trowel (A1, A2, B1, or C1 profile per BS EN 12004) at 45° angle with continuous sweeping motion. Avoid excessive trowel pressure that generates dust from substrate. Work in manageable sections (2-3m²) within pot life (typically 20-30 minutes for Keraquick, 30-40 minutes for Ultraplan at 20°C). Use wet methods for any corrections or removal. Maintain ventilation throughout application.

Critical Hold-Point: CRITICAL: Monitor for signs of material setting (loss of workability). Do not attempt to re-temper with water as this compromises performance and generates additional dust. If skin contact occurs, wash immediately with pH-neutral soap and water—do not allow cement to dry on skin.
4

Surface Finishing and Environmental Control During Initial Set

Finishing and Curing

For Ultraplan screed: use spiked roller or smoothing trowel within 20 minutes of pouring to release entrapped air and achieve smooth finish. For Keraquick: bed tiles firmly within open time (typically 20 minutes) using twisting motion to achieve >95% coverage. Protect freshly applied material from draughts, direct sunlight, and rapid drying which can cause surface crazing. Maintain ambient temperature between 5-30°C during curing. Prohibit foot traffic during initial set period (typically 3-4 hours for Ultraplan, 3 hours for Keraquick). Continue ventilation but avoid direct airflow onto surface. Maintain RPE until all dusty activities cease.

Critical Hold-Point: WARNING: Rapid drying increases airborne dust risk during subsequent operations. Do not use forced-air heaters or dehumidifiers during initial 24 hours. Material remains alkaline (pH 12-13) until fully cured—maintain skin and eye protection during any contact.
5

Wet Cleaning Methods and Waste Segregation

Cleanup and Decontamination

Use wet cleaning methods exclusively—never dry sweep cement residues. Clean tools immediately using water and stiff brush before material hardens. Collect washings and waste slurry in designated containers (do not discharge to drains without pH neutralisation). Use Class H HEPA vacuum (BS EN 60335-2-69) for any dry residues—never use compressed air. Wipe down all surfaces with damp cloths, working from clean to contaminated areas. Double-bag cement-contaminated waste in heavy-duty polythene sacks, label as 'Cement Waste—Alkaline', and dispose via licensed waste carrier (EWC code 17 01 01 for concrete/cement waste). Decontaminate LEV filters per manufacturer's instructions. Clean or dispose of single-use PPE appropriately.

Critical Hold-Point: STOP: Remove and clean PPE in controlled manner to avoid cross-contamination. Wash hands and forearms thoroughly with pH-neutral soap before eating, drinking, or smoking. Do not take contaminated clothing home—use on-site laundry facilities or commercial service.
6

Exposure Verification, Health Surveillance, and Record Keeping

Post-Work Monitoring

Conduct post-task workplace inspection to verify complete cleanup and absence of residual dust. Review air monitoring data (if collected) to confirm RCS exposure remained <0.1 mg/m³ WEL. Document any incidents, near-misses, or PPE failures in site diary. Update COSHH assessment if control measures proved inadequate. Record operative exposure hours for health surveillance purposes. Inspect skin for signs of irritation or sensitisation—report any adverse reactions to occupational health provider. Schedule next LEV thorough examination and testing (TExT) per HSG258 (14-month intervals). File all records per COSHH Regulation 12 (minimum 5 years, 40 years for carcinogen exposure records). Conduct debrief with operatives to identify improvement opportunities.

Critical Hold-Point: MANDATORY: Report any cases of occupational dermatitis, respiratory symptoms, or eye injuries to HSE under RIDDOR if resulting in >7 days absence or diagnosed occupational disease. Ensure health surveillance records are maintained confidentially and reviewed by occupational health professional.

Emergency Rescue, First Aid & Spill Protocol

**EMERGENCY CONTACTS:** Dial 999 for medical emergencies. Contact site first aider immediately. Mapei UK Technical Support: 0121 508 6970 (office hours). **EYE CONTACT (H318 SERIOUS EYE DAMAGE):** Immediately irrigate eyes with clean water or eyewash solution for minimum 15 minutes, holding eyelids open. Remove contact lenses if present and easy to do. Continue rinsing during transport to hospital. Seek immediate medical attention—inform A&E of alkaline chemical burn (pH 12-13) and provide SDS. **SKIN CONTACT (H317 SENSITISATION):** Remove contaminated clothing immediately. Wash affected area thoroughly with pH-neutral soap and copious water for minimum 10 minutes. Do not use solvents or abrasives. Apply emollient cream. If irritation, rash, or blistering develops, seek medical advice and provide SDS. Report to occupational health for surveillance. **INHALATION (RCS EXPOSURE):** Move casualty to fresh air immediately. Loosen tight clothing. If breathing is difficult, administer oxygen if trained and available. If breathing stops, commence CPR. Seek immediate medical attention. Inform medical personnel of potential RCS exposure and provide SDS. Monitor for delayed respiratory symptoms (cough, shortness of breath) over following 24 hours. **INGESTION (UNLIKELY):** Do not induce vomiting due to alkaline corrosive nature. Rinse mouth thoroughly with water. Give small amounts of water to drink if conscious. Seek immediate medical attention. Provide SDS to medical personnel. **SPILLAGE:** Isolate area and prevent access. Wear full PPE including RPE. Contain spillage with absorbent material or sand. Use wet methods to collect waste—never dry sweep. Dispose via licensed waste carrier (EWC 17 01 01). Ventilate area thoroughly. **FIRE:** Products are non-flammable but packaging may burn. Use water spray, foam, or CO₂ extinguisher. Wear SCBA if smoke present. Cement dust may form explosive atmosphere if suspended in confined space—eliminate ignition sources.

4. UK HSE Compliance FAQs: Mapei Ultraplan Renovation Screed & Keraquick Rapid-Set Cementitious Adhesive

What's the actual workplace exposure limit for the silica dust in these Mapei products and how do I prove I'm staying under it on site?

The EH40/2005 Workplace Exposure Limit (WEL) for respirable crystalline silica (RCS) is 0.1 mg/m³ measured as an 8-hour time-weighted average (TWA). To demonstrate compliance, you must conduct personal air monitoring using a sampling pump worn by operatives, with samples analysed by UKAS-accredited laboratory using X-ray diffraction (XRD) per MDHS101/2. Monitoring should be conducted during initial use, when processes change, and periodically (typically annually) thereafter. If exposure approaches 50% of the WEL (0.05 mg/m³), you must enhance controls. Engineering controls (LEV, wet methods) combined with FFP3 respirators (APF 20) typically achieve compliance, but monitoring is the only way to verify. Records must be kept for 40 years due to RCS carcinogen classification. Many contractors use occupational hygiene consultants for monitoring—expect costs of £500-1,200 per survey depending on number of samples.

If someone gets Mapei cement in their eyes, how long do we actually need to rinse for and should we still send them to hospital even if they say they're fine?

You must irrigate eyes continuously for a minimum of 15 minutes with clean water or sterile eyewash solution, holding eyelids open to ensure thorough flushing. This is critical because Mapei products have pH 12-13 (strongly alkaline) and are classified H318 (serious eye damage)—alkaline burns continue to penetrate tissue even after initial contact. After 15 minutes of irrigation, the casualty MUST be transported to A&E for professional assessment, continuing irrigation during transport if possible. Never rely on the casualty's self-assessment that they're 'fine'—alkaline eye burns can cause delayed damage that isn't immediately apparent, potentially leading to permanent vision loss. Provide the Safety Data Sheet to medical personnel. This is a potential RIDDOR-reportable injury if it results in serious eye damage. Document the incident thoroughly and review your emergency eyewash provision—stations must be within 10 metres of mixing/application areas and tested weekly.

Do my lads really need those expensive FFP3 masks for the whole job or can they just use the cheaper FFP2 ones we've got in the stores for the dusty bits?

FFP3 respirators (or equivalent P3 half-mask with Assigned Protection Factor of 20) are mandatory for all activities involving potential RCS exposure when using Mapei cementitious products—this is non-negotiable under COSHH Regulations 2002. FFP2 masks provide insufficient protection (APF of only 10) against respirable crystalline silica, which is an IARC Group 1 carcinogen causing irreversible silicosis and lung cancer. The 'dusty bits' you mention are precisely when RCS exposure is highest, but even apparently low-dust activities like pouring mixed material can generate respirable particles <10 microns that penetrate deep into lungs. Using inadequate RPE exposes you to HSE enforcement action, potential prosecution, and civil liability for occupational disease claims that can emerge decades later. FFP3 masks cost £3-8 each (reusable half-masks £25-80)—a trivial cost compared to potential fines (£20,000+), compensation claims (£50,000-200,000+ for silicosis), and reputational damage. Additionally, all wearers must be face-fit tested annually (cost £50-100 per person) and clean-shaven where the mask seals. This isn't optional—it's a legal requirement with serious health and legal consequences.

5. Operative Toolbox Talk & Competent Person Sign-Off Register

Competent Person & Operative Declaration: By signing below, the Site Supervisor confirms this assessment has been adapted and verified for actual site conditions, and operatives confirm they have attended the pre-start Toolbox Talk for Mapei Ultraplan Renovation Screed & Keraquick Rapid-Set Cementitious Adhesive and will follow the safe system of work.

Operative / Supervisor Name Trade / Role & CSCS No. Signature Date & Time
1. (Site Supervisor):     
2.     
3.     
4.     
5.     
6.     

Related UK Safety Templates & Risk Assessments