Under COSHH Regulations 2002, Mapei Ultraplan Renovation Screed and Keraquick Rapid-Set Cementitious Adhesive containing respirable crystalline silica (RCS) must not exceed the EH40/2005 Workplace Exposure Limit of 0.1 mg/m³ (8-hour TWA). Products are classified under CLP as GHS05 (Serious Eye Damage H318) and GHS07 (Skin Sensitisation H317), mandating engineering controls, local exhaust ventilation (LEV), wet methods, and isolation procedures to reduce residual risk to tolerable levels (≤8 on 5×5 matrix). This COSHH assessment provides statutory control measures, PPE specifications to BS EN standards, and emergency protocols for commercial flooring and tiling operations involving these rapid-set cementitious materials.
| Identified Hazard & Harm | Initial Risk (L×S) | Mandatory Engineering, Isolation & Procedural Controls | Residual Risk |
|---|---|---|---|
| 1. Inhalation of respirable crystalline silica (RCS) dust during mixing, pouring, and surface preparation Harm: Silicosis (irreversible lung fibrosis), chronic obstructive pulmonary disease (COPD), lung cancer (IARC Group 1 carcinogen), and acute respiratory irritation | 4 × 5 = 20 | Implement on-tool LEV extraction with minimum 20 m/s capture velocity. Use wet mixing methods and pre-mixed slurries where practicable. Conduct air monitoring to verify exposure <0.1 mg/m³ (EH40/2005 WEL). Enforce RPE (FFP3 minimum APF 20) during all dusty operations. Isolate work area with physical barriers and warning signage. Provide thorough examination and testing (TExT) of LEV every 14 months per HSG258. Implement health surveillance (respiratory questionnaire and spirometry) for workers with regular RCS exposure per COSHH Regulation 11. | 2 × 3 = 6 |
| 2. Serious eye damage from alkaline cement contact (pH 12-13) during mixing and application Harm: Chemical burns to cornea and conjunctiva, permanent vision impairment, serious eye damage (H318 classification), and potential blindness | 3 × 5 = 15 | Mandatory use of BS EN 166 sealed safety goggles or full-face shield during all mixing and application activities. Install emergency eyewash station within 10 metres of work area, tested weekly. Use closed mixing systems or add powder to water slowly to minimise splashing. Provide face shields for pouring operations. Enforce strict no-contact policy with eyes/face before handwashing. Train operatives in immediate irrigation protocol (15 minutes continuous flushing). Isolate mixing area from other trades to prevent inadvertent exposure. | 2 × 3 = 6 |
| 3. Allergic contact dermatitis and skin sensitisation from chromium (VI) and cement alkalinity (H317) Harm: Chronic dermatitis, skin sensitisation requiring permanent exclusion from cement work, painful skin fissures, and occupational skin disease reportable under RIDDOR | 4 × 3 = 12 | Enforce mandatory use of BS EN ISO 374-1 Type B nitrile gloves (minimum 0.38mm) with 30-minute breakthrough time. Implement pre-work skin protection (barrier creams to BS EN 1499) and post-work emollient use. Provide washing facilities with pH-neutral soap within immediate work area. Conduct skin surveillance (visual inspection) monthly per HSG264. Use low-chromium cement products (<2 ppm Cr(VI)) compliant with REACH Annex XVII Entry 47. Prohibit dry wiping of cement residue. Enforce immediate washing protocol for any skin contact. Rotate tasks to minimise prolonged exposure. | 2 × 2 = 4 |
| 4. Manual handling injuries during transport and pouring of 25kg bags and mixed material Harm: Musculoskeletal disorders (MSDs) including lower back strain, shoulder injuries, and chronic spinal damage requiring medical treatment | 5 × 3 = 15 | Conduct task-specific manual handling risk assessment per Manual Handling Operations Regulations 1992. Limit individual bag handling to maximum 25kg. Use mechanical aids (sack trolleys, pallet trucks) for transport over 5 metres. Implement two-person lift protocol for bags above waist height. Position materials at waist height (750-1050mm) to eliminate bending. Use pump systems for large-area screed application to eliminate manual carrying. Provide manual handling training emphasising neutral spine posture and kinetic lifting technique. Rotate operatives every 2 hours for repetitive pouring tasks. | 3 × 2 = 6 |
| 5. Slips, trips, and falls on wet cement surfaces and contaminated access routes Harm: Fractures, head injuries, lacerations, and potential major injury reportable under RIDDOR Regulation 4 | 4 × 3 = 12 | Establish designated clean access routes with physical barriers (Heras fencing or equivalent). Implement continuous housekeeping protocol with immediate spillage cleanup using wet methods (never dry sweeping). Use anti-slip walkway boards (minimum 600mm width) across wet work areas. Enforce SRC-rated safety footwear (BS EN ISO 20345 S3). Provide adequate task lighting (minimum 200 lux for general work, 500 lux for detailed application). Segregate pedestrian routes from material transport paths. Conduct pre-shift workplace inspection with documented checklist. Remove tripping hazards (cables, hoses) using cable ramps or overhead routing. | 2 × 2 = 4 |
Conduct documented pre-task risk assessment and toolbox talk covering RCS hazards, H318 eye damage, and H317 skin sensitisation. Verify substrate moisture content <2.5% for Ultraplan or as per technical datasheet. Establish physical barriers (Heras fencing minimum 2m perimeter) and display COSHH warning signage (GHS05, GHS07 pictograms). Set up on-tool LEV system and verify airflow at capture point (minimum 20 m/s using anemometer). Position emergency eyewash station within 10m and verify functionality. Stage materials in designated area at waist height (750-1050mm). Confirm all operatives have completed face-fit testing for RPE (FFP3) within last 12 months and hold valid training certificates.
Don full PPE ensemble: FFP3 respirator, sealed goggles, nitrile gloves, and protective coveralls. Position mixing bucket within LEV capture zone or use on-tool extraction. Add measured clean water to mixing vessel FIRST (never add powder to empty bucket). Slowly pour powder into water to minimise dust generation. Use forced-action paddle mixer at low speed (300-400 rpm) for initial 30 seconds, then increase to 500-600 rpm. Mix for duration specified in product datasheet (typically 2-3 minutes for Ultraplan, 1-2 minutes for Keraquick). Scrape sides of bucket to ensure homogeneous consistency. Allow material to stand for 1 minute (slaking period), then re-mix briefly. Verify pot life and working time per technical datasheet.
Maintain FFP3 respiratory protection throughout application phase. For Ultraplan screed: pour mixed material onto prepared substrate starting from furthest point, working backwards towards exit. Use gauge rake or levelling frame to achieve specified thickness (typically 3-50mm). For Keraquick adhesive: apply using notched trowel (A1, A2, B1, or C1 profile per BS EN 12004) at 45° angle with continuous sweeping motion. Avoid excessive trowel pressure that generates dust from substrate. Work in manageable sections (2-3m²) within pot life (typically 20-30 minutes for Keraquick, 30-40 minutes for Ultraplan at 20°C). Use wet methods for any corrections or removal. Maintain ventilation throughout application.
For Ultraplan screed: use spiked roller or smoothing trowel within 20 minutes of pouring to release entrapped air and achieve smooth finish. For Keraquick: bed tiles firmly within open time (typically 20 minutes) using twisting motion to achieve >95% coverage. Protect freshly applied material from draughts, direct sunlight, and rapid drying which can cause surface crazing. Maintain ambient temperature between 5-30°C during curing. Prohibit foot traffic during initial set period (typically 3-4 hours for Ultraplan, 3 hours for Keraquick). Continue ventilation but avoid direct airflow onto surface. Maintain RPE until all dusty activities cease.
Use wet cleaning methods exclusively—never dry sweep cement residues. Clean tools immediately using water and stiff brush before material hardens. Collect washings and waste slurry in designated containers (do not discharge to drains without pH neutralisation). Use Class H HEPA vacuum (BS EN 60335-2-69) for any dry residues—never use compressed air. Wipe down all surfaces with damp cloths, working from clean to contaminated areas. Double-bag cement-contaminated waste in heavy-duty polythene sacks, label as 'Cement Waste—Alkaline', and dispose via licensed waste carrier (EWC code 17 01 01 for concrete/cement waste). Decontaminate LEV filters per manufacturer's instructions. Clean or dispose of single-use PPE appropriately.
Conduct post-task workplace inspection to verify complete cleanup and absence of residual dust. Review air monitoring data (if collected) to confirm RCS exposure remained <0.1 mg/m³ WEL. Document any incidents, near-misses, or PPE failures in site diary. Update COSHH assessment if control measures proved inadequate. Record operative exposure hours for health surveillance purposes. Inspect skin for signs of irritation or sensitisation—report any adverse reactions to occupational health provider. Schedule next LEV thorough examination and testing (TExT) per HSG258 (14-month intervals). File all records per COSHH Regulation 12 (minimum 5 years, 40 years for carcinogen exposure records). Conduct debrief with operatives to identify improvement opportunities.
**EMERGENCY CONTACTS:** Dial 999 for medical emergencies. Contact site first aider immediately. Mapei UK Technical Support: 0121 508 6970 (office hours). **EYE CONTACT (H318 SERIOUS EYE DAMAGE):** Immediately irrigate eyes with clean water or eyewash solution for minimum 15 minutes, holding eyelids open. Remove contact lenses if present and easy to do. Continue rinsing during transport to hospital. Seek immediate medical attention—inform A&E of alkaline chemical burn (pH 12-13) and provide SDS. **SKIN CONTACT (H317 SENSITISATION):** Remove contaminated clothing immediately. Wash affected area thoroughly with pH-neutral soap and copious water for minimum 10 minutes. Do not use solvents or abrasives. Apply emollient cream. If irritation, rash, or blistering develops, seek medical advice and provide SDS. Report to occupational health for surveillance. **INHALATION (RCS EXPOSURE):** Move casualty to fresh air immediately. Loosen tight clothing. If breathing is difficult, administer oxygen if trained and available. If breathing stops, commence CPR. Seek immediate medical attention. Inform medical personnel of potential RCS exposure and provide SDS. Monitor for delayed respiratory symptoms (cough, shortness of breath) over following 24 hours. **INGESTION (UNLIKELY):** Do not induce vomiting due to alkaline corrosive nature. Rinse mouth thoroughly with water. Give small amounts of water to drink if conscious. Seek immediate medical attention. Provide SDS to medical personnel. **SPILLAGE:** Isolate area and prevent access. Wear full PPE including RPE. Contain spillage with absorbent material or sand. Use wet methods to collect waste—never dry sweep. Dispose via licensed waste carrier (EWC 17 01 01). Ventilate area thoroughly. **FIRE:** Products are non-flammable but packaging may burn. Use water spray, foam, or CO₂ extinguisher. Wear SCBA if smoke present. Cement dust may form explosive atmosphere if suspended in confined space—eliminate ignition sources.
The EH40/2005 Workplace Exposure Limit (WEL) for respirable crystalline silica (RCS) is 0.1 mg/m³ measured as an 8-hour time-weighted average (TWA). To demonstrate compliance, you must conduct personal air monitoring using a sampling pump worn by operatives, with samples analysed by UKAS-accredited laboratory using X-ray diffraction (XRD) per MDHS101/2. Monitoring should be conducted during initial use, when processes change, and periodically (typically annually) thereafter. If exposure approaches 50% of the WEL (0.05 mg/m³), you must enhance controls. Engineering controls (LEV, wet methods) combined with FFP3 respirators (APF 20) typically achieve compliance, but monitoring is the only way to verify. Records must be kept for 40 years due to RCS carcinogen classification. Many contractors use occupational hygiene consultants for monitoring—expect costs of £500-1,200 per survey depending on number of samples.
You must irrigate eyes continuously for a minimum of 15 minutes with clean water or sterile eyewash solution, holding eyelids open to ensure thorough flushing. This is critical because Mapei products have pH 12-13 (strongly alkaline) and are classified H318 (serious eye damage)—alkaline burns continue to penetrate tissue even after initial contact. After 15 minutes of irrigation, the casualty MUST be transported to A&E for professional assessment, continuing irrigation during transport if possible. Never rely on the casualty's self-assessment that they're 'fine'—alkaline eye burns can cause delayed damage that isn't immediately apparent, potentially leading to permanent vision loss. Provide the Safety Data Sheet to medical personnel. This is a potential RIDDOR-reportable injury if it results in serious eye damage. Document the incident thoroughly and review your emergency eyewash provision—stations must be within 10 metres of mixing/application areas and tested weekly.
FFP3 respirators (or equivalent P3 half-mask with Assigned Protection Factor of 20) are mandatory for all activities involving potential RCS exposure when using Mapei cementitious products—this is non-negotiable under COSHH Regulations 2002. FFP2 masks provide insufficient protection (APF of only 10) against respirable crystalline silica, which is an IARC Group 1 carcinogen causing irreversible silicosis and lung cancer. The 'dusty bits' you mention are precisely when RCS exposure is highest, but even apparently low-dust activities like pouring mixed material can generate respirable particles <10 microns that penetrate deep into lungs. Using inadequate RPE exposes you to HSE enforcement action, potential prosecution, and civil liability for occupational disease claims that can emerge decades later. FFP3 masks cost £3-8 each (reusable half-masks £25-80)—a trivial cost compared to potential fines (£20,000+), compensation claims (£50,000-200,000+ for silicosis), and reputational damage. Additionally, all wearers must be face-fit tested annually (cost £50-100 per person) and clean-shaven where the mask seals. This isn't optional—it's a legal requirement with serious health and legal consequences.
Competent Person & Operative Declaration: By signing below, the Site Supervisor confirms this assessment has been adapted and verified for actual site conditions, and operatives confirm they have attended the pre-start Toolbox Talk for Mapei Ultraplan Renovation Screed & Keraquick Rapid-Set Cementitious Adhesive and will follow the safe system of work.
| Operative / Supervisor Name | Trade / Role & CSCS No. | Signature | Date & Time |
|---|---|---|---|
| 1. (Site Supervisor): | |||
| 2. | |||
| 3. | |||
| 4. | |||
| 5. | |||
| 6. |