Ardex Arditex NA & A45 Rapid-Drying Floor Levelling Screed & Latex (COSHH Template & 5x5 Risk Assessment)

Under COSHH 2002 and EH40/2005 Workplace Exposure Limits, Ardex Arditex NA and A45 rapid-drying floor levelling screeds containing respirable crystalline silica (RCS) and Portland cement alkali (H318 serious eye damage, H315 skin irritation) require mandatory exposure control through local exhaust ventilation (LEV), wet methods, and respiratory protective equipment (RPE) to reduce inhalation and dermal contact risks below the WEL of 0.1 mg/m³ (RCS 8-hour TWA). This COSHH assessment establishes hierarchy of controls, emergency procedures, health surveillance requirements, and safe work sequences for mixing, application, and cleanup operations involving these alkaline cementitious products on UK commercial and industrial flooring projects, targeting residual risk reduction to tolerable levels (≤8 on 5×5 matrix) through engineering controls and strict PPE enforcement.

Statutory FrameworkCOSHH 2002, EH40/2005 (Respirable Crystalline Silica & Portland Cement Alkali H318/H315)
ClassificationGHS/CLP Classification: Skin Corrosion/Irritation Category 2 (H315), Serious Eye Damage Category 1 (H318), Skin Sensitisation Category 1 (H317), STOT SE Category 3 - Respiratory Irritation (H335). Contains Portland cement (CAS 65997-15-1), respirable crystalline silica/quartz (CAS 14808-60-7). EH40/2005 WEL: Respirable Crystalline Silica 0.1 mg/m³ 8-hr TWA. Cement dust (total inhalable) 10 mg/m³, respirable 4 mg/m³. Pictograms: GHS05 (Corrosion), GHS07 (Exclamation Mark). Signal Word: DANGER. P-Statements: P280 (Wear protective gloves/eye protection/face protection), P305+P351+P338 (IF IN EYES: Rinse cautiously with water for several minutes, remove contact lenses if present and easy to do, continue rinsing), P310 (Immediately call POISON CENTRE/doctor), P261 (Avoid breathing dust), P271 (Use only outdoors or in well-ventilated area), P302+P352 (IF ON SKIN: Wash with plenty of water), P333+P313 (If skin irritation or rash occurs: Get medical advice/attention).
Required Plant / KitForced-air paddle mixer (variable speed 400-600 rpm) with dust-suppression shroud compliant with HSG258 LEV guidance • Class M-certified vacuum extractor (BS 8520-3:2009) with HEPA filtration for dry dust collection and cleanup • Calibrated digital hygrometer and moisture meter for substrate assessment (BS 8204 compliance) • Stainless steel gauge rake and smoothing trowel set for screed application and levelling • Portable local exhaust ventilation (LEV) unit with flexible ducting and face velocity ≥1 m/s at capture point (HSE COSHH essentials Sheet S1)
Site Sign-Off StatusRequires Competent Person Verification
Instant AI Customization or Free Blank Word (.doc) Download

Need this COSHH customized with your Company Name, Site Postcode & Nearest A&E Hospital?

Dictate your site specifics on your phone in 45 seconds to auto-compile a signed PDF—or download our free blank Word (.doc) shell below.

Auto-Fill via Voice / CLP (45s)

1. Mandatory Personal Protective Equipment (BS EN Standards)

BS EN ISO 374-1:2016/A1:2018 Type B (KPT), BS EN 420:2003+A1:2009
Nitrile chemical-resistant gloves (minimum 0.38mm thickness, breakthrough time >480 minutes for alkaline exposure)
Mandatory protection against Portland cement alkali causing skin irritation (H315) and sensitisation (H317). Prevents dermal contact with wet screed pH 12-13, reducing risk of chemical burns and allergic contact dermatitis per COSHH 2002 Regulation 7.
BS EN 149:2001+A1:2009 (FFP3) or BS EN 140:1999 with BS EN 143:2021 Class P3 filters
FFP3 NR disposable filtering facepiece respirator (Assigned Protection Factor 20) or reusable half-mask with P3 filters
Essential respiratory protection against respirable crystalline silica (RCS) and cement dust during mixing, pouring, and sanding operations. Reduces exposure below EH40/2005 WEL of 0.1 mg/m³ (RCS 8-hr TWA) and prevents STOT SE respiratory irritation (H335) per COSHH hierarchy of control.
BS EN 166:2001 (Optical Class 1, Mechanical Strength F, Liquid Droplet/Splash protection 3)
Safety spectacles with side shields or full-face visor providing splash protection
Critical eye protection against serious eye damage (H318) from alkaline cement splashes during mixing and application. Prevents corneal burns and chemical conjunctivitis from pH 12-13 wet screed contact, mandatory under COSHH 2002 Regulation 7 and PPE at Work Regulations 1992.
BS EN ISO 20345:2011 S3 (SRC slip resistance, penetration resistance, water resistance, cleated outsole)
Safety footwear with penetration-resistant midsole and chemical-resistant outsole
Protects against foot injuries from heavy bags (25kg), penetration hazards from substrate preparation debris, and slip hazards on wet alkaline screed. SRC slip resistance essential on contaminated surfaces per Construction (Design and Management) Regulations 2015.

2. 5×5 Hazard Risk Assessment Matrix (HASAWA 1974 / MHSWR 1999)

Identified Hazard & HarmInitial Risk (L×S)Mandatory Engineering, Isolation & Procedural ControlsResidual Risk
1. Inhalation exposure to respirable crystalline silica (RCS) and cement dust during mixing, pouring, and surface finishing operations
Harm: Chronic silicosis, lung fibrosis, COPD, and increased lung cancer risk from prolonged RCS exposure above EH40/2005 WEL (0.1 mg/m³ 8-hr TWA). Acute respiratory irritation (H335), coughing, and bronchial inflammation from cement dust inhalation.
4 × 4 = 16Engineering: Install portable LEV with flexible extraction hood positioned ≤300mm from mixing point, achieving face velocity ≥1 m/s (HSG258). Use wet mixing methods with pre-measured water to minimise dust generation. Administrative: Implement COSHH assessment review every 12 months or when process changes. Provide health surveillance (respiratory questionnaire, spirometry) for workers with regular exposure per HSE COSHH guidance. Restrict access to mixing area (3m exclusion zone). PPE: Mandatory FFP3 respirators (APF 20) for all mixing and application tasks. Fit testing required annually per HSE INDG479. RPE maintenance and filter replacement per manufacturer schedule.3 × 2 = 6
2. Skin contact with alkaline wet screed (pH 12-13) causing chemical burns, irritation (H315), and allergic contact dermatitis/sensitisation (H317)
Harm: Severe skin burns, dermatitis, and irreversible skin sensitisation to hexavalent chromium in cement. Prolonged contact causes deep tissue damage requiring medical treatment. Sensitised workers may require permanent role change.
5 × 3 = 15Engineering: Use long-handled application tools (minimum 1.2m) to maintain distance from wet screed. Install wash stations with pH-neutral skin cleanser within 10m of work area. Provide barrier cream dispensers (pre-work protection). Administrative: Implement 'no skin contact' policy with disciplinary enforcement. Rotate workers to limit exposure duration (<4 hours continuous contact per shift). Provide skin surveillance (visual inspection, symptom reporting) every 6 months. Training on early dermatitis recognition. PPE: Nitrile gloves (BS EN ISO 374-1 Type B, >0.38mm, >480 min breakthrough) changed every 2 hours or immediately if contaminated. Long-sleeved coveralls (Type 5/6) with elasticated cuffs. Barrier cream applied to exposed skin before work.3 × 2 = 6
3. Eye contact with alkaline cement splash or dust causing serious eye damage (H318) including corneal burns and permanent vision impairment
Harm: Irreversible corneal scarring, chemical conjunctivitis, and potential blindness from pH 12-13 alkaline burns. Requires immediate emergency irrigation and urgent ophthalmological assessment. Reportable under RIDDOR 2013 as specified injury.
3 × 5 = 15Engineering: Install emergency eyewash station (BS EN 15154-2:2006) within 10 seconds travel time of mixing/application area. Test weekly and record. Use dust-suppression mixing shrouds and controlled pouring techniques to minimise splash generation. Administrative: Enforce 'no rubbing eyes' policy. Provide pre-task briefing on eye protection and emergency response. Display emergency eyewash procedure signage at stations. Appoint first aiders trained in chemical eye injury management (minimum 1 per 10 workers). PPE: Mandatory safety spectacles with side shields (BS EN 166 Class 1, Mechanical F, Splash 3) or full-face visor for mixing operations. Anti-fog coating required. Daily inspection for scratches/damage.2 × 4 = 8
4. Manual handling injuries from lifting 25kg bags of powder screed, repetitive bending, and awkward postures during application
Harm: Acute back strain, chronic lower back pain, musculoskeletal disorders (MSDs) affecting spine, shoulders, and knees. Potential for herniated discs requiring surgery and long-term absence. Cumulative trauma from repetitive tasks.
5 × 3 = 15Engineering: Provide mechanical lifting aids (sack trolleys, pallet trucks) for bag transport. Install bag splitters at waist height (900-1100mm) to eliminate lifting. Use bulk delivery systems with pneumatic transfer where volume justifies (>500kg per day). Provide anti-fatigue matting in mixing area. Administrative: Conduct Manual Handling Operations Regulations 1992 assessment. Implement two-person lift policy for bags >20kg. Rotate tasks every 2 hours to vary posture. Provide manual handling training covering kinetic lifting techniques. Limit continuous application work to 45-minute periods with 15-minute breaks. PPE: Knee pads (BS EN 14404:2004+A1:2010 Type 2 Level 1) for kneeling tasks. Lumbar support belts available on request (not substitute for controls).3 × 2 = 6
5. Slips, trips, and falls on wet alkaline screed surfaces, contaminated walkways, and uneven substrates during application and curing
Harm: Fractures, head injuries, lacerations, and chemical burns from falling onto wet alkaline screed (pH 12-13). Potential for major injury reportable under RIDDOR 2013. Increased risk in confined spaces or near edges/openings.
4 × 3 = 12Engineering: Establish designated clean walkways with barrier segregation (minimum 1m width) using Heras fencing or equivalent. Install non-slip temporary walkway boards (plywood with anti-slip coating). Provide adequate task lighting (minimum 200 lux per BS EN 12464-1). Install edge protection (toe boards, guardrails to 1.1m height) per Work at Height Regulations 2005 where floor openings exist. Administrative: Implement permit-to-work system for work near edges or in confined areas. Conduct pre-start site inspection for trip hazards (cables, hoses, substrate defects). Maintain housekeeping standards with immediate spill cleanup using Class M vacuum (no dry sweeping). Erect warning signage ('Wet Floor - Alkaline Hazard - No Entry') at access points. Restrict access until screed achieves initial set (typically 3-4 hours). PPE: Safety footwear BS EN ISO 20345 S3 with SRC slip resistance (tested on ceramic/steel with detergent). High-visibility clothing (Class 2 per BS EN ISO 20471) in multi-trade environments.2 × 3 = 6

3. Step-by-Step Safe Sequence of Operations & Hold-Points

1

COSHH Assessment Review, Permit Authorisation, and Hazard Control Verification

Pre-Work Preparation & Site Setup

Obtain signed permit-to-work from site supervisor confirming COSHH assessment review, LEV availability, and emergency eyewash station functionality (tested within last 7 days). Verify substrate moisture content ≤75% RH per Ardex technical data sheet using calibrated hygrometer. Establish 3m exclusion zone around mixing area with barrier fencing and hazard signage ('Respiratory Hazard - RCS - RPE Mandatory', 'Alkaline Material - H318 Eye Damage'). Position Class M vacuum extractor and LEV unit with extraction hood. Confirm emergency eyewash station within 10 seconds travel time and test flow for 3 minutes. Conduct toolbox talk covering RCS/alkali hazards, PPE requirements (FFP3, nitrile gloves, eye protection), emergency procedures, and manual handling techniques. Inspect all PPE for damage/expiry dates. Ensure minimum 2 workers present (buddy system). Record pre-start checks on permit.

Critical Hold-Point: STOP: Do not proceed if LEV equipment is unavailable, not functioning (face velocity <1 m/s), or if FFP3 respirators are not fit-tested to operatives. RCS exposure without adequate RPE can cause irreversible lung damage. Emergency eyewash station MUST be functional before handling alkaline materials - H318 serious eye damage requires immediate irrigation.
2

Don Mandatory PPE and Conduct Fit Verification Before Material Handling

PPE Donning & Fit Check

Put on Type 5/6 disposable coveralls with elasticated cuffs and ankles. Don FFP3 respirator (BS EN 149 FFP3 NR) and conduct user seal check per HSE INDG479: cover filter with hands, inhale sharply (mask should collapse against face), exhale (slight positive pressure, no leakage at seal). If seal fails, adjust straps and retry or select different size/model. Don nitrile chemical-resistant gloves (BS EN ISO 374-1 Type B, minimum 0.38mm) ensuring cuffs overlap coverall sleeves by minimum 100mm. Put on safety spectacles with side shields (BS EN 166 Class 1, Mechanical F, Splash 3) or full-face visor for mixing operations. Verify anti-fog coating is effective. Don S3 safety footwear with SRC slip resistance. Have colleague verify all PPE is correctly fitted with no gaps or exposed skin. Keep spare FFP3 respirators and gloves within exclusion zone for emergency replacement.

Critical Hold-Point: CRITICAL: FFP3 respirator seal is life-critical protection against RCS (0.1 mg/m³ WEL). Facial hair (even stubble) prevents effective seal and invalidates protection - clean-shaven policy mandatory per HSE guidance. Replace respirator immediately if breathing resistance increases, indicating filter saturation. Nitrile gloves MUST overlap coveralls - any skin exposure to wet screed (pH 12-13) can cause chemical burns within minutes.
3

Controlled Mixing with LEV Extraction and Wet Method Dust Suppression

Material Mixing & Dust Control

Activate LEV unit and position extraction hood ≤300mm from mixing bucket opening, verifying face velocity ≥1 m/s using anemometer or smoke test. Place 25kg powder bag on bag splitter at waist height (900-1100mm) - use two-person lift if splitter unavailable. Using sharp knife, carefully cut bag top while LEV is extracting, keeping face turned away. Slowly pour powder into mixing bucket containing pre-measured water (per Ardex data sheet ratio, typically 6.25-6.5 litres per 25kg bag) to minimise dust generation. Discard empty bag immediately into sealed waste container. Insert paddle mixer with dust-suppression shroud, starting at low speed (400 rpm) for 30 seconds, then increase to 600 rpm for 2-3 minutes until lump-free consistency achieved. Keep mixer submerged throughout to prevent splashing. Add water only at start - never add dry powder to mixed material. Clean mixer paddle immediately after use using wet cloth (no dry brushing). Maintain LEV extraction throughout mixing and for 2 minutes after completion.

Critical Hold-Point: HOLD POINT: Do NOT add dry powder to water after mixing has started - this creates uncontrollable dust clouds exceeding RCS WEL. Do NOT use compressed air or dry brushing to clean equipment - this re-suspends RCS dust. LEV MUST be operating before bag is opened. If LEV fails during mixing, stop immediately, evacuate exclusion zone, and do not resume until LEV is repaired and verified. Mixed material has 30-minute pot life (A45) or 40 minutes (NA) - discard if thickening occurs.
4

Pour and Spread Screed Using Long-Handled Tools to Minimise Contact

Screed Application & Levelling

Carry mixed screed bucket using two-person lift technique (bend knees, straight back, load close to body). Pour screed onto prepared substrate starting at furthest point from exit, working backwards to avoid walking on wet material. Use long-handled gauge rake (minimum 1.2m handle) to spread screed to required thickness (typically 3-50mm per technical data). Maintain upright posture to reduce back strain. Use stainless steel smoothing trowel for final levelling, keeping hands above waist height where possible. Avoid kneeling directly on wet screed - use knee pads (BS EN 14404 Type 2) on clean boards if necessary. Work in 45-minute periods with 15-minute breaks to prevent MSD accumulation. Maintain awareness of wet floor slip hazards - use SRC-rated footwear and avoid rapid direction changes. Keep emergency eyewash location in mind at all times. If screed contacts skin, immediately rinse with copious water for minimum 15 minutes and change gloves. Do not rub eyes - if splash occurs, proceed immediately to eyewash station.

Critical Hold-Point: DANGER: Wet screed is highly alkaline (pH 12-13) causing serious eye damage (H318) and skin burns (H315). Any eye contact requires immediate irrigation at eyewash station for minimum 15 minutes while removing contact lenses, then urgent medical attention (call 999 or attend A&E). Skin contact requires immediate water rinse - do not wait until break. Screed sets rapidly (initial set 3-4 hours) - plan work to avoid entrapment or working in confined areas without exit route.
5

Wet Cleaning Methods and Controlled Waste Handling to Prevent Secondary RCS Exposure

Cleanup & Waste Disposal

While screed is curing and area remains restricted, clean all tools and equipment using wet methods only. Wipe tools with damp cloths, rinsing frequently in water bucket. Use Class M vacuum extractor (BS 8520-3 with HEPA filter) to collect any dry dust or spillages - never use standard vacuum or dry sweeping (re-suspends RCS). Dispose of wet cleaning cloths and empty bags into sealed heavy-duty polythene bags (minimum 500 gauge) labelled 'Hazardous Waste - Alkaline Cement - RCS'. Seal bags and place in designated waste skip (EWC code 17 01 01 - concrete waste). Clean mixing bucket while material is still wet using scraper and water - do not allow to dry and harden. Decontaminate LEV extraction hood and hoses using damp cloth. Remove PPE in correct sequence: gloves (inside-out), coveralls (roll inwards), respirator (by straps only, not touching filter), eye protection. Dispose of single-use PPE in sealed bag with waste. Wash hands and face thoroughly with pH-neutral cleanser and water before eating, drinking, or smoking. Report any skin irritation or respiratory symptoms to supervisor immediately.

Critical Hold-Point: CRITICAL: NEVER dry sweep or use compressed air for cleanup - this creates RCS dust clouds far exceeding WEL and causes secondary exposure to all site workers. Class M vacuum is mandatory for dry dust. Contaminated PPE is hazardous waste - do not take home for washing (exposes family to RCS/alkali). Wash hands before removing respirator to avoid transferring alkaline dust to face. Any respiratory symptoms (coughing, shortness of breath) or skin reactions (redness, itching) must be reported for health surveillance recording per COSHH 2002 Regulation 11.
6

Curing Period Management, Air Monitoring, and Safe Re-Entry Authorisation

Post-Application Monitoring & Area Handover

Maintain exclusion zone and warning signage for minimum initial set period (3-4 hours for A45, 4-5 hours for NA at 20°C - longer in cold conditions). Ensure adequate ventilation (natural or mechanical) to dissipate any residual dust and maintain air quality. If required by COSHH assessment (e.g., confined space, poor ventilation), conduct air monitoring using personal sampling pump with IOM sampler or similar, analysing for RCS per MDHS101/2 (target <0.1 mg/m³ 8-hr TWA). Record results in COSHH assessment file. Inspect cured screed surface for defects, ponding, or incomplete coverage. Check that walkways and access routes are clear of contamination and slip hazards. Remove barrier fencing and signage only when screed has achieved sufficient hardness to prevent damage (typically 24 hours for light foot traffic per technical data). Complete permit-to-work closure section, recording any incidents, near-misses, or PPE failures. File COSHH records including air monitoring results, health surveillance notes, and operative exposure hours for 40-year retention per HSE guidance. Conduct debrief with team covering lessons learned and control effectiveness.

Critical Hold-Point: IMPORTANT: Do not allow premature access to curing screed - surface damage requires costly remediation and creates additional dust exposure during repair. Confined space work with Ardex products requires specific COSHH assessment addressing reduced ventilation and increased RCS accumulation - standard controls may be inadequate. Maintain all COSHH records for 40 years minimum (RCS is carcinogenic with long latency period - records essential for future health surveillance and compensation claims). Report any control failures (LEV breakdown, PPE damage) via site incident system for investigation and corrective action.

Emergency Rescue, First Aid & Spill Protocol

4. UK HSE Compliance FAQs: Ardex Arditex NA & A45 Rapid-Drying Floor Levelling Screed & Latex

5. Operative Toolbox Talk & Competent Person Sign-Off Register

Competent Person & Operative Declaration: By signing below, the Site Supervisor confirms this assessment has been adapted and verified for actual site conditions, and operatives confirm they have attended the pre-start Toolbox Talk for Ardex Arditex NA & A45 Rapid-Drying Floor Levelling Screed & Latex and will follow the safe system of work.