Under COSHH 2002 and EH40/2005 Workplace Exposure Limits, Ardex Arditex NA and A45 rapid-drying floor levelling screeds containing respirable crystalline silica (RCS) and Portland cement alkali (H318 serious eye damage, H315 skin irritation) require mandatory exposure control through local exhaust ventilation (LEV), wet methods, and respiratory protective equipment (RPE) to reduce inhalation and dermal contact risks below the WEL of 0.1 mg/m³ (RCS 8-hour TWA). This COSHH assessment establishes hierarchy of controls, emergency procedures, health surveillance requirements, and safe work sequences for mixing, application, and cleanup operations involving these alkaline cementitious products on UK commercial and industrial flooring projects, targeting residual risk reduction to tolerable levels (≤8 on 5×5 matrix) through engineering controls and strict PPE enforcement.
| Identified Hazard & Harm | Initial Risk (L×S) | Mandatory Engineering, Isolation & Procedural Controls | Residual Risk |
|---|---|---|---|
| 1. Inhalation exposure to respirable crystalline silica (RCS) and cement dust during mixing, pouring, and surface finishing operations Harm: Chronic silicosis, lung fibrosis, COPD, and increased lung cancer risk from prolonged RCS exposure above EH40/2005 WEL (0.1 mg/m³ 8-hr TWA). Acute respiratory irritation (H335), coughing, and bronchial inflammation from cement dust inhalation. | 4 × 4 = 16 | Engineering: Install portable LEV with flexible extraction hood positioned ≤300mm from mixing point, achieving face velocity ≥1 m/s (HSG258). Use wet mixing methods with pre-measured water to minimise dust generation. Administrative: Implement COSHH assessment review every 12 months or when process changes. Provide health surveillance (respiratory questionnaire, spirometry) for workers with regular exposure per HSE COSHH guidance. Restrict access to mixing area (3m exclusion zone). PPE: Mandatory FFP3 respirators (APF 20) for all mixing and application tasks. Fit testing required annually per HSE INDG479. RPE maintenance and filter replacement per manufacturer schedule. | 3 × 2 = 6 |
| 2. Skin contact with alkaline wet screed (pH 12-13) causing chemical burns, irritation (H315), and allergic contact dermatitis/sensitisation (H317) Harm: Severe skin burns, dermatitis, and irreversible skin sensitisation to hexavalent chromium in cement. Prolonged contact causes deep tissue damage requiring medical treatment. Sensitised workers may require permanent role change. | 5 × 3 = 15 | Engineering: Use long-handled application tools (minimum 1.2m) to maintain distance from wet screed. Install wash stations with pH-neutral skin cleanser within 10m of work area. Provide barrier cream dispensers (pre-work protection). Administrative: Implement 'no skin contact' policy with disciplinary enforcement. Rotate workers to limit exposure duration (<4 hours continuous contact per shift). Provide skin surveillance (visual inspection, symptom reporting) every 6 months. Training on early dermatitis recognition. PPE: Nitrile gloves (BS EN ISO 374-1 Type B, >0.38mm, >480 min breakthrough) changed every 2 hours or immediately if contaminated. Long-sleeved coveralls (Type 5/6) with elasticated cuffs. Barrier cream applied to exposed skin before work. | 3 × 2 = 6 |
| 3. Eye contact with alkaline cement splash or dust causing serious eye damage (H318) including corneal burns and permanent vision impairment Harm: Irreversible corneal scarring, chemical conjunctivitis, and potential blindness from pH 12-13 alkaline burns. Requires immediate emergency irrigation and urgent ophthalmological assessment. Reportable under RIDDOR 2013 as specified injury. | 3 × 5 = 15 | Engineering: Install emergency eyewash station (BS EN 15154-2:2006) within 10 seconds travel time of mixing/application area. Test weekly and record. Use dust-suppression mixing shrouds and controlled pouring techniques to minimise splash generation. Administrative: Enforce 'no rubbing eyes' policy. Provide pre-task briefing on eye protection and emergency response. Display emergency eyewash procedure signage at stations. Appoint first aiders trained in chemical eye injury management (minimum 1 per 10 workers). PPE: Mandatory safety spectacles with side shields (BS EN 166 Class 1, Mechanical F, Splash 3) or full-face visor for mixing operations. Anti-fog coating required. Daily inspection for scratches/damage. | 2 × 4 = 8 |
| 4. Manual handling injuries from lifting 25kg bags of powder screed, repetitive bending, and awkward postures during application Harm: Acute back strain, chronic lower back pain, musculoskeletal disorders (MSDs) affecting spine, shoulders, and knees. Potential for herniated discs requiring surgery and long-term absence. Cumulative trauma from repetitive tasks. | 5 × 3 = 15 | Engineering: Provide mechanical lifting aids (sack trolleys, pallet trucks) for bag transport. Install bag splitters at waist height (900-1100mm) to eliminate lifting. Use bulk delivery systems with pneumatic transfer where volume justifies (>500kg per day). Provide anti-fatigue matting in mixing area. Administrative: Conduct Manual Handling Operations Regulations 1992 assessment. Implement two-person lift policy for bags >20kg. Rotate tasks every 2 hours to vary posture. Provide manual handling training covering kinetic lifting techniques. Limit continuous application work to 45-minute periods with 15-minute breaks. PPE: Knee pads (BS EN 14404:2004+A1:2010 Type 2 Level 1) for kneeling tasks. Lumbar support belts available on request (not substitute for controls). | 3 × 2 = 6 |
| 5. Slips, trips, and falls on wet alkaline screed surfaces, contaminated walkways, and uneven substrates during application and curing Harm: Fractures, head injuries, lacerations, and chemical burns from falling onto wet alkaline screed (pH 12-13). Potential for major injury reportable under RIDDOR 2013. Increased risk in confined spaces or near edges/openings. | 4 × 3 = 12 | Engineering: Establish designated clean walkways with barrier segregation (minimum 1m width) using Heras fencing or equivalent. Install non-slip temporary walkway boards (plywood with anti-slip coating). Provide adequate task lighting (minimum 200 lux per BS EN 12464-1). Install edge protection (toe boards, guardrails to 1.1m height) per Work at Height Regulations 2005 where floor openings exist. Administrative: Implement permit-to-work system for work near edges or in confined areas. Conduct pre-start site inspection for trip hazards (cables, hoses, substrate defects). Maintain housekeeping standards with immediate spill cleanup using Class M vacuum (no dry sweeping). Erect warning signage ('Wet Floor - Alkaline Hazard - No Entry') at access points. Restrict access until screed achieves initial set (typically 3-4 hours). PPE: Safety footwear BS EN ISO 20345 S3 with SRC slip resistance (tested on ceramic/steel with detergent). High-visibility clothing (Class 2 per BS EN ISO 20471) in multi-trade environments. | 2 × 3 = 6 |
Obtain signed permit-to-work from site supervisor confirming COSHH assessment review, LEV availability, and emergency eyewash station functionality (tested within last 7 days). Verify substrate moisture content ≤75% RH per Ardex technical data sheet using calibrated hygrometer. Establish 3m exclusion zone around mixing area with barrier fencing and hazard signage ('Respiratory Hazard - RCS - RPE Mandatory', 'Alkaline Material - H318 Eye Damage'). Position Class M vacuum extractor and LEV unit with extraction hood. Confirm emergency eyewash station within 10 seconds travel time and test flow for 3 minutes. Conduct toolbox talk covering RCS/alkali hazards, PPE requirements (FFP3, nitrile gloves, eye protection), emergency procedures, and manual handling techniques. Inspect all PPE for damage/expiry dates. Ensure minimum 2 workers present (buddy system). Record pre-start checks on permit.
Put on Type 5/6 disposable coveralls with elasticated cuffs and ankles. Don FFP3 respirator (BS EN 149 FFP3 NR) and conduct user seal check per HSE INDG479: cover filter with hands, inhale sharply (mask should collapse against face), exhale (slight positive pressure, no leakage at seal). If seal fails, adjust straps and retry or select different size/model. Don nitrile chemical-resistant gloves (BS EN ISO 374-1 Type B, minimum 0.38mm) ensuring cuffs overlap coverall sleeves by minimum 100mm. Put on safety spectacles with side shields (BS EN 166 Class 1, Mechanical F, Splash 3) or full-face visor for mixing operations. Verify anti-fog coating is effective. Don S3 safety footwear with SRC slip resistance. Have colleague verify all PPE is correctly fitted with no gaps or exposed skin. Keep spare FFP3 respirators and gloves within exclusion zone for emergency replacement.
Activate LEV unit and position extraction hood ≤300mm from mixing bucket opening, verifying face velocity ≥1 m/s using anemometer or smoke test. Place 25kg powder bag on bag splitter at waist height (900-1100mm) - use two-person lift if splitter unavailable. Using sharp knife, carefully cut bag top while LEV is extracting, keeping face turned away. Slowly pour powder into mixing bucket containing pre-measured water (per Ardex data sheet ratio, typically 6.25-6.5 litres per 25kg bag) to minimise dust generation. Discard empty bag immediately into sealed waste container. Insert paddle mixer with dust-suppression shroud, starting at low speed (400 rpm) for 30 seconds, then increase to 600 rpm for 2-3 minutes until lump-free consistency achieved. Keep mixer submerged throughout to prevent splashing. Add water only at start - never add dry powder to mixed material. Clean mixer paddle immediately after use using wet cloth (no dry brushing). Maintain LEV extraction throughout mixing and for 2 minutes after completion.
Carry mixed screed bucket using two-person lift technique (bend knees, straight back, load close to body). Pour screed onto prepared substrate starting at furthest point from exit, working backwards to avoid walking on wet material. Use long-handled gauge rake (minimum 1.2m handle) to spread screed to required thickness (typically 3-50mm per technical data). Maintain upright posture to reduce back strain. Use stainless steel smoothing trowel for final levelling, keeping hands above waist height where possible. Avoid kneeling directly on wet screed - use knee pads (BS EN 14404 Type 2) on clean boards if necessary. Work in 45-minute periods with 15-minute breaks to prevent MSD accumulation. Maintain awareness of wet floor slip hazards - use SRC-rated footwear and avoid rapid direction changes. Keep emergency eyewash location in mind at all times. If screed contacts skin, immediately rinse with copious water for minimum 15 minutes and change gloves. Do not rub eyes - if splash occurs, proceed immediately to eyewash station.
While screed is curing and area remains restricted, clean all tools and equipment using wet methods only. Wipe tools with damp cloths, rinsing frequently in water bucket. Use Class M vacuum extractor (BS 8520-3 with HEPA filter) to collect any dry dust or spillages - never use standard vacuum or dry sweeping (re-suspends RCS). Dispose of wet cleaning cloths and empty bags into sealed heavy-duty polythene bags (minimum 500 gauge) labelled 'Hazardous Waste - Alkaline Cement - RCS'. Seal bags and place in designated waste skip (EWC code 17 01 01 - concrete waste). Clean mixing bucket while material is still wet using scraper and water - do not allow to dry and harden. Decontaminate LEV extraction hood and hoses using damp cloth. Remove PPE in correct sequence: gloves (inside-out), coveralls (roll inwards), respirator (by straps only, not touching filter), eye protection. Dispose of single-use PPE in sealed bag with waste. Wash hands and face thoroughly with pH-neutral cleanser and water before eating, drinking, or smoking. Report any skin irritation or respiratory symptoms to supervisor immediately.
Maintain exclusion zone and warning signage for minimum initial set period (3-4 hours for A45, 4-5 hours for NA at 20°C - longer in cold conditions). Ensure adequate ventilation (natural or mechanical) to dissipate any residual dust and maintain air quality. If required by COSHH assessment (e.g., confined space, poor ventilation), conduct air monitoring using personal sampling pump with IOM sampler or similar, analysing for RCS per MDHS101/2 (target <0.1 mg/m³ 8-hr TWA). Record results in COSHH assessment file. Inspect cured screed surface for defects, ponding, or incomplete coverage. Check that walkways and access routes are clear of contamination and slip hazards. Remove barrier fencing and signage only when screed has achieved sufficient hardness to prevent damage (typically 24 hours for light foot traffic per technical data). Complete permit-to-work closure section, recording any incidents, near-misses, or PPE failures. File COSHH records including air monitoring results, health surveillance notes, and operative exposure hours for 40-year retention per HSE guidance. Conduct debrief with team covering lessons learned and control effectiveness.
Competent Person & Operative Declaration: By signing below, the Site Supervisor confirms this assessment has been adapted and verified for actual site conditions, and operatives confirm they have attended the pre-start Toolbox Talk for Ardex Arditex NA & A45 Rapid-Drying Floor Levelling Screed & Latex and will follow the safe system of work.
| Operative / Supervisor Name | Trade / Role & CSCS No. | Signature | Date & Time |
|---|---|---|---|
| 1. (Site Supervisor): | |||
| 2. | |||
| 3. | |||
| 4. | |||
| 5. | |||