This Standard Operating Procedure (SOP) provides comprehensive safety controls for the replacement of PTFE conveyor belts on guillotine heat sealers and shrink tunnel systems within packaging and end-of-line operations. The procedure addresses critical hazards including thermal burns from heated platens and tunnel elements (operating at 150-250°C), electrical shock from 400V three-phase supplies, mechanical entrapment from guillotine blade mechanisms, and manual handling risks. Compliance with the Provision and Use of Work Equipment Regulations 1998 (PUWER), Electricity at Work Regulations 1989, and Health and Safety at Work etc. Act 1974 is mandatory. All work must be conducted under a formal Lock-Out/Tag-Out (LOTO) regime with verified isolation of electrical and thermal energy sources. Only competent, trained personnel holding valid Authorised Person (Mechanical/Electrical) status may perform this task. Thermal cool-down periods of minimum 60 minutes post-isolation are mandatory before physical contact with heated components. This SOP forms part of the site's Safe System of Work and must be read in conjunction with equipment-specific risk assessments and manufacturer's maintenance manuals.
| Identified Hazard & Harm | Initial Risk (L×S) | Mandatory Engineering, Isolation & Procedural Controls | Residual Risk |
|---|---|---|---|
| 1. Thermal burns from heated sealing platens and shrink tunnel elements (150-250°C) Harm: Deep tissue burns (second/third degree), permanent scarring, shock, incapacitation requiring emergency medical treatment and potential RIDDOR reportable injury | 4 × 5 = 20 | Implement formal thermal LOTO: isolate electrical supply at main isolator, apply personal padlock and danger tag. Verify zero energy state with calibrated IR thermometer. Enforce mandatory 60-minute cool-down period with temperature verification <40°C before contact. Use BS EN 407 heat-resistant gloves. Post thermal hazard warning signs during cool-down. Competent Person to authorize commencement only after documented temperature checks. | 2 × 3 = 6 |
| 2. Electrical shock from 400V three-phase supply and control circuits Harm: Electrocution, cardiac arrest, severe burns at contact points, fatal injury, arc flash burns to face and hands | 3 × 5 = 15 | Electrical LOTO per Electricity at Work Regulations 1989: isolate at main distribution board, lock-off with personal padlock, apply danger tags. Prove dead using approved voltage indicator at motor terminals and control panel. Short and earth if >400V. Only AP(E) qualified personnel to perform isolation. Use insulated VDE 1000V tools. Maintain minimum 110V reduced low voltage for task lighting via RCD-protected supply. | 1 × 4 = 4 |
| 3. Mechanical entrapment/amputation from guillotine blade mechanism and belt drive rollers Harm: Crush injuries to fingers/hands, traumatic amputation, fractures, permanent disability, RIDDOR major injury | 4 × 5 = 20 | Mechanical LOTO: isolate pneumatic/hydraulic supplies to guillotine actuator, bleed residual pressure, lock valve in closed position. Install blade safety blocks/pins to prevent closure. Isolate belt drive motor at local isolator with LOTO. Verify zero mechanical energy by manual test (no movement). Remove interlocked guards only after isolation verified. Use two-person working for belt threading through nip points. Competent Person supervision mandatory. | 2 × 4 = 8 |
| 4. Manual handling of PTFE belt assemblies (15-30kg, awkward dimensions up to 3m length) Harm: Musculoskeletal disorders (lower back strain, shoulder injury), acute soft tissue injury, long-term chronic pain, potential for dropped load causing foot/leg injury | 5 × 3 = 15 | Conduct task-specific manual handling assessment per HSE TILE principles. Use two-person lift for belts >15kg or >2m length. Employ mechanical aids (roller stands, adjustable trestles) to support belt during threading. Maintain clear egress routes, remove trip hazards. Use kinetic lifting technique: bend knees, straight back, load close to body. Provide manual handling training refresher annually. Consider use of overhead hoist or jib crane for belts >25kg. | 3 × 2 = 6 |
| 5. Stored energy release from belt tensioning springs and pneumatic accumulators Harm: Impact injuries from sudden component movement, lacerations, eye injuries from ejected parts, bruising, potential loss of sight | 3 × 4 = 12 | Identify all stored energy sources on equipment schematic before work. Systematically release belt tension using manufacturer's procedure: loosen tensioner bolts incrementally in cross-pattern. Bleed pneumatic accumulators via dedicated bleed valve, verify zero pressure with gauge. Use spring compression tools where fitted. Wear BS EN 166 eye protection and cut-resistant gloves. Stand clear of potential trajectory paths. Document energy isolation on LOTO checklist. | 2 × 3 = 6 |
Obtain signed Permit to Work from Duty Manager/Shift Engineer. Notify production control of equipment downtime. Assemble LOTO kit, IR thermometer, and isolation keys. At main electrical distribution board, switch off and lock-out 400V three-phase supply using personal padlock and apply danger tag with name, date, and task description. At equipment local isolator, apply secondary LOTO. Isolate pneumatic supply to guillotine actuator at zone valve, bleed system pressure, and lock valve closed. Apply LOTO to belt drive motor isolator. Complete LOTO register entry.
Post 'HOT SURFACE - COOLING IN PROGRESS' warning signs at equipment access points. Establish 60-minute minimum cool-down period from time of isolation. After 60 minutes, don heat-resistant gloves (BS EN 407) and use calibrated IR thermometer to measure surface temperatures of: (a) upper and lower sealing platens, (b) shrink tunnel heating elements (top/bottom/side), (c) PTFE belt surface at entry/exit points. Record all readings on Permit to Work. Verify all surfaces <40°C before proceeding. If any surface >40°C, extend cool-down by 30-minute increments and re-measure.
Don cut-resistant gloves (BS EN 388 Level D) and safety spectacles. Remove interlocked access panels (retain fixings in labeled container). Visually inspect guillotine blade position - if not in fully raised position, do NOT proceed and consult manufacturer. Insert manufacturer-supplied blade safety blocks/pins into designated holes to mechanically prevent blade closure. Verify blocks are fully engaged. Systematically release belt tensioning mechanism: loosen tensioner adjustment bolts in 1/4-turn increments in cross-pattern sequence to prevent uneven spring release. Bleed any pneumatic accumulators via bleed valve, confirm zero pressure on gauge.
Position roller stands or trestles at belt exit point to support removed belt. Working with second person, manually rotate drive roller (confirm no resistance - motor must be isolated) to advance belt. Release belt tracking guides by loosening clamping screws. At belt splice/join point, disconnect fasteners (note orientation and fastener type for reassembly). Carefully withdraw belt from shrink tunnel, supporting weight continuously to prevent snagging on heating elements. Thread belt backwards through sealing head, maintaining control to avoid contact with guillotine blade. Once free, place worn belt on trestle for inspection/disposal. Inspect belt path for debris, damaged rollers, or misaligned guides - rectify before new belt installation.
Verify new belt is correct specification (width, length, temperature rating) per equipment manual. Inspect new belt for damage or defects before installation. With second person, thread new belt through sealing head, passing under guillotine blade (blade blocks still in place), ensuring correct orientation (coated side as per manual). Feed belt through shrink tunnel, using roller stands to support free end. Route belt around drive and return rollers per manufacturer's routing diagram. Join belt ends using specified fasteners/splice method, ensuring join is square and aligned. Hand-rotate drive roller to position splice away from sealing area. Apply initial belt tension per manufacturer's specification using tensioner adjustment bolts - tighten evenly in cross-pattern. Use torque wrench for final tensioner bolt tightening (typically 40-60 Nm - verify in manual).
Conduct final visual inspection: remove blade safety blocks and store correctly, verify all panels are in position (not yet fixed), confirm work area is clear of tools and materials. Remove all personal LOTO devices in reverse order of application - only the person who applied each lock may remove it. Restore pneumatic supply and verify system pressure. At main isolator, restore electrical supply (remove LOTO, close isolator). Establish 3-meter exclusion zone around equipment. Conduct supervised test run: Authorised Person to energize equipment in 'inch/jog' mode, observe belt tracking and tension. Run for 2 minutes, then stop and check belt temperature with IR thermometer (should not exceed 60°C). Check belt alignment at all guide points. If satisfactory, run at normal speed for 5 minutes under no-load. Re-check all parameters. If all checks pass, secure all guards with fixings, torque to specification. Complete Permit to Work closure section, obtain AP signature, and return equipment to production control. Update maintenance log.
**EMERGENCY CONTACTS:** Site Emergency: 2222 (internal) | Emergency Services: 999 | HSE Duty Officer: [site-specific] **THERMAL BURNS:** Immediately cool affected area under running cold water for minimum 20 minutes. Do NOT apply creams, oils, or ice. Remove jewelry/watches before swelling occurs. Cover with sterile non-adhesive dressing. All burns >5cm² or involving face/hands/joints are RIDDOR reportable - summon First Aider and arrange immediate hospital attendance via ambulance. Treat for shock (lie down, elevate legs, keep warm). Do NOT burst blisters. **ELECTRICAL SHOCK:** Do NOT touch casualty if still in contact with live conductor. Isolate supply immediately using emergency stop or local isolator. If not possible, use non-conductive material (dry wood) to separate casualty from source. Check responsiveness and breathing. If unresponsive and not breathing normally, commence CPR (30 compressions: 2 breaths) and summon ambulance immediately. Use site AED if available. All electrical shock incidents are RIDDOR reportable - preserve scene for investigation. **CRUSH/ENTRAPMENT INJURIES:** Do NOT move casualty if spinal injury suspected. Activate emergency stop to halt machinery. Summon First Aider and ambulance immediately. Control bleeding with direct pressure using sterile dressing. Immobilize injured limb. Monitor for shock. If amputation has occurred, preserve severed part in clean plastic bag, place bag in container of ice-water (not direct ice contact), and send with casualty to hospital. All amputations/fractures are RIDDOR major injuries. **INCIDENT REPORTING:** All injuries, near-misses, and dangerous occurrences must be reported to Line Manager and HSE Department within 24 hours. Complete site accident report form (F-HSE-001). RIDDOR reportable injuries must be notified to HSE within 10 days (fatalities/major injuries within 24 hours). Preserve equipment in as-found condition pending investigation. Withdraw Permit to Work and suspend similar activities until investigation complete. **FIRST AID PROVISION:** Nearest First Aid station: [site-specific location]. Nearest First Aider: [check site board]. Nearest eye-wash station: [site-specific]. All personnel must know location of nearest emergency stop buttons and fire exits before commencing work.
Under the Provision and Use of Work Equipment Regulations 1998 (PUWER), Regulation 19 requires that equipment is isolated from all energy sources and made safe before maintenance work commences. For this task, this means electrical isolation (400V three-phase supply), pneumatic isolation (guillotine actuator), and thermal energy dissipation (cool-down to <40°C). Regulation 22 requires that maintenance work is only carried out by competent persons with adequate training, information, and instruction. Competence for this task requires: (1) Authorised Person (Electrical) status for electrical isolation under Electricity at Work Regulations 1989, (2) completion of site LOTO training (refreshed annually), (3) equipment-specific training on the guillotine heat sealer and shrink tunnel, and (4) understanding of thermal hazards and cool-down requirements. Only a Duty Manager, Shift Engineer, or designated Competent Person may authorize commencement of work by signing the Permit to Work after verifying all isolation steps are complete and documented. The person performing the work must hold valid AP(M) or AP(E) status as appropriate to the isolation tasks they perform.
The mandatory minimum cool-down period is 60 minutes from the point of electrical isolation, regardless of operating temperature. However, this is a minimum baseline for equipment operating at normal temperatures (typically 180-200°C). If the equipment was operating at maximum temperature (250°C) or had been running continuously for extended periods, thermal mass in the heating elements, insulation, and surrounding metalwork will retain heat significantly longer. In such cases: (1) Extend the initial cool-down period to 90 minutes before first temperature check, (2) Use the calibrated IR thermometer to measure surface temperatures at multiple points (top, bottom, and side heating elements, plus platen surfaces), (3) If any reading is >40°C, extend cool-down by 30-minute increments and re-measure, (4) Do NOT rely on touch or visual assessment - always use the IR thermometer, (5) Document all temperature readings with timestamps on the Permit to Work. Remember that internal heating element cores may be hotter than surface readings suggest - the 40°C threshold provides a safety margin. If in doubt, extend the cool-down period. Never compromise on thermal safety to meet production deadlines - thermal burns are among the most severe and painful occupational injuries.
Under the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013 (RIDDOR), several injury types associated with this task are reportable to the HSE: (1) Any amputation (e.g., from guillotine blade or belt drive rollers) must be reported within 10 days via online form F2508 or telephone 0345 300 9923, (2) Any fracture (other than fingers, thumbs, or toes) from crush injuries or dropped components is a 'major injury' reportable within 10 days, (3) Any injury resulting in over 7 consecutive days' absence from work (not counting the day of injury) must be reported within 15 days, (4) Electrical shock resulting in unconsciousness or requiring resuscitation is reportable as a major injury, (5) Any dangerous occurrence such as electrical short circuit causing explosion or fire is reportable even if no injury occurred. Immediate site actions: (a) Provide emergency first aid and arrange hospital treatment as required, (b) Preserve the scene and equipment in as-found condition - do not disturb evidence, (c) Withdraw the Permit to Work and suspend all similar activities, (d) Notify HSE Department and senior management immediately, (e) Commence internal investigation using root cause analysis (5-Whys, Fishbone, or similar), (f) Review and update risk assessments and SOPs based on findings, (g) Provide HSE inspector with full cooperation if site visit occurs, (h) Implement corrective actions before resuming similar work. Failure to report RIDDOR incidents can result in HSE prosecution under Section 33 of HASAWA 1974, with unlimited fines. Accurate, timely reporting demonstrates regulatory compliance and organizational safety maturity.
Competent Person & Operative Declaration: By signing below, the Site Supervisor confirms this assessment has been adapted and verified for actual site conditions, and operatives confirm they have attended the pre-start Toolbox Talk for Guillotine Heat Sealer & Shrink Tunnel PTFE Belt Replacement & Thermal LOTO and will follow the safe system of work.
| Operative / Supervisor Name | Trade / Role & CSCS No. | Signature | Date & Time |
|---|---|---|---|
| 1. (Site Supervisor): | |||
| 2. | |||
| 3. | |||
| 4. | |||
| 5. | |||