SafeSequence › UK Safety Template Library › Hazardous Materials › Non-Licensed Asbestos Cement Downpipe & Flue Removal
Verified UK RAMS Standard • Hazardous Materials

Non-Licensed Asbestos Cement Downpipe & Flue Removal (RAMS Template & 5x5 Risk Assessment)

This Risk Assessment and Method Statement (RAMS) provides comprehensive safety procedures for the removal of non-licensed asbestos cement (AC) downpipes and flues in accordance with the Control of Asbestos Regulations 2012 (CAR 2012) and HSE Asbestos Essentials Task Sheet EM7. This document applies to work involving asbestos cement materials where exposure is sporadic and of low intensity, and the total time spent on work with asbestos materials does not exceed 2 hours in any 7-day period, or 1 hour in a single work session. All operatives must have completed appropriate asbestos awareness training (CAR 2012 Regulation 10). The work must be notified to the enforcing authority at least 14 days before commencement. This RAMS establishes control measures to prevent fibre release, protect workers and building occupants, and ensure compliant waste disposal. A competent person must supervise all activities and maintain a site-specific asbestos register.

Statutory FrameworkControl of Asbestos Regulations 2012 (CAR 2012), HSE Asbestos Essentials EM7
ClassificationAsbestos cement materials are classified under CLP Regulation (EC) No 1272/2008 as Carcinogen Category 1A (H350: May cause cancer by inhalation). Chrysotile asbestos (white asbestos) is the primary fibre type in AC products. Waste asbestos cement is classified as Hazardous Waste under List of Wastes (England) Regulations 2005, EWC Code 17 06 05* (construction materials containing asbestos). All asbestos waste must be double-bagged in UN-approved packaging marked with appropriate hazard labels and transported by a registered waste carrier to a licensed asbestos disposal facility. Consignment notes must be retained for 3 years. Control Limit: 0.1 fibres/cm³ (4-hour time-weighted average) as per CAR 2012 Schedule 2.
Required Plant / KitClass H vacuum cleaner (BS 8520-3 certified for asbestos dust) • Hand tools only (no power tools - spanners, screwdrivers, pliers for fixings removal) • Spray bottle with water and wetting agent (surfactant) for damping down • Asbestos waste bags (UN-approved double-bag system with hazard labels) • Barrier tape, warning signs (asbestos hazard signage to HSE guidance), and delineation equipment
Review Cycle12 Months / Post-Incident
Instant AI Customization or Free Blank Word (.doc) Download

Need this RAMS customized with your Company Name, Site Postcode & Nearest A&E Hospital?

Dictate your site specifics on your phone in 45 seconds to auto-compile a signed PDF—or download our free blank Word (.doc) shell below.

Auto-Fill via Voice / CLP (45s)

2. 5×5 Hazard Risk Assessment Matrix (HASAWA 1974 / MHSWR 1999)

Identified Hazard & Harm Initial Risk (L×S) Mandatory Engineering, Isolation & Procedural Controls Residual Risk
1. Inhalation of asbestos fibres during removal of AC downpipes/flues
Harm: Asbestosis, mesothelioma, lung cancer (latency period 15-60 years). Irreversible respiratory disease and potential fatality.
4 × 5 = 20 Wet methods mandatory - continuously spray AC materials with water/surfactant to suppress fibre release. No cutting, grinding, or power tools permitted. FFP3 respiratory protection worn at all times. Work limited to max 1 hour per session, 2 hours per 7 days. Class H vacuum used for cleaning. Air monitoring if uncertainty exists. Operatives hold valid asbestos awareness training certificate (CAR 2012 Reg 10). Competent person supervises all work. 2 × 4 = 8
2. Working at height during removal of elevated downpipes/flues
Harm: Falls from height resulting in major injury or fatality. Fractures, head injuries, spinal damage.
4 × 5 = 20 Work at Height Regulations 2005 compliance. Tower scaffold or mobile elevated work platform (MEWP) used - inspected by competent person (SG4:15 inspection record). Collective fall protection (guardrails) preferred over personal fall arrest. Ladder use only for access, not work platform. Exclusion zone established below work area with barrier tape. Tools tethered to prevent dropped objects. Weather conditions assessed - work suspended in high winds (>20mph) or heavy rain. 2 × 4 = 8
3. Manual handling of asbestos cement sections and waste bags
Harm: Musculoskeletal disorders, back strain, soft tissue injuries. Breakage of AC materials increasing fibre release risk.
4 × 3 = 12 Manual Handling Operations Regulations 1992 compliance. AC materials kept intact and handled gently to prevent breakage. Two-person lift for sections >10kg or awkward shapes. Mechanical aids (trolleys, sack trucks) used where practicable. Waste double-bagged immediately at point of removal to reduce handling. Operatives trained in safe manual handling techniques. Kinetic lifting techniques employed - bend knees, straight back, load close to body. 2 × 2 = 4
4. Contamination of surrounding areas and building occupants
Harm: Secondary exposure to asbestos fibres for building occupants, public, or other trades. Environmental contamination.
4 × 4 = 16 Work area isolated with physical barriers and warning signage (minimum 3 metres exclusion zone). Building occupants notified minimum 24 hours in advance. Work scheduled outside peak occupancy hours where possible. Controlled work area established - no eating, drinking, or smoking. Decontamination procedures: damp-wipe all tools and equipment before removal from work area. Personnel decontamination: vacuum Type 5 coveralls with Class H vacuum before removal, dispose as asbestos waste. Boot wash station provided. Transit routes kept clean using damp methods. 2 × 3 = 6
5. Inadequate waste containment and illegal disposal
Harm: Environmental pollution, prosecution under Environmental Protection Act 1990, unlimited fines, and imprisonment. Public health risk.
3 × 4 = 12 Hazardous Waste (England and Wales) Regulations 2005 compliance. Double-bagging system: inner bag (minimum 500 gauge polythene) sealed, placed in outer UN-approved asbestos waste bag, both clearly labelled with asbestos warning labels. Waste consignment note (WCN) completed for all movements. Registered waste carrier used (Environment Agency registration verified). Waste transported directly to licensed asbestos disposal site (site licence verified). Consignment notes retained for 3 years. Waste stored securely in locked skip/container if not immediately removed. Site waste management plan maintained. 1 × 3 = 3

3. Step-by-Step Safe Sequence of Operations & Hold-Points

1

Site Survey, Notification, and Asbestos Confirmation

Pre-Work Preparation

Conduct pre-work site survey to confirm asbestos cement material type, condition, and location. Verify material is non-licensed asbestos cement (not AIB, lagging, or sprayed coatings). Check asbestos register and obtain laboratory analysis if material uncertain. Complete CAR 2012 notification to enforcing authority (HSE or Local Authority) minimum 14 days before start - include site address, work description, start date, duration, and operative details. Verify all operatives hold valid asbestos awareness training certificates (within 12 months). Appoint competent supervisor. Obtain permits to work and coordinate with building management. Establish welfare facilities including washing facilities and separate clean eating area.

Critical Hold-Point: HOLD POINT: Do NOT proceed until written confirmation of non-licensed status is obtained and enforcing authority notification is submitted. Work on licensed asbestos materials without proper licensing is a criminal offence under CAR 2012 Regulation 8.
2

Isolation, Signage, and Exclusion Zone Setup

Work Area Establishment

Establish minimum 3-metre exclusion zone around work area using barrier tape and stanchions. Erect asbestos warning signs at all access points stating 'DANGER: ASBESTOS REMOVAL IN PROGRESS - AUTHORISED PERSONNEL ONLY - RESPIRATORS MUST BE WORN'. Notify building occupants and adjacent properties minimum 24 hours in advance. Isolate work area from occupied spaces - close doors, seal vents if necessary. Erect tower scaffold or MEWP for elevated work (inspected by competent person with SG4:15 record). Cover ground beneath work area with 500-gauge polythene sheeting secured with tape. Position waste bags and Class H vacuum within work zone. Verify weather conditions suitable (no high winds or heavy rain forecast).

Critical Hold-Point: HOLD POINT: Competent person must inspect and sign off all work at height equipment before use. Verify exclusion zone is secure and no unauthorised persons can enter work area.
3

Don PPE and Conduct Pre-Work Briefing

Personal Preparation

All operatives don full PPE in clean area before entering work zone: (1) Put on Type 5 disposable coveralls with hood, ensuring all fastenings secure and ankles/wrists sealed. (2) Fit FFP3 respirator - conduct positive and negative pressure fit checks. (3) Pull coverall hood over respirator straps. (4) Don disposable nitrile gloves, pulling cuffs over coverall sleeves. (5) Wear safety boots (S3 rated). Conduct toolbox talk covering: work sequence, emergency procedures, fibre release prevention, waste handling, decontamination procedures, and communication protocols. Confirm all operatives understand wet working methods and no power tools policy. Designate roles (e.g., removal operative, support/wetting operative). Establish emergency contact procedures.

Critical Hold-Point: HOLD POINT: Supervisor must verify each operative's FFP3 respirator fit check is satisfactory and all PPE is correctly worn. Face-fit test certificates must be valid (annual retest required).
4

Wet Removal of Asbestos Cement Downpipes and Flues

Removal Operations

Thoroughly wet all AC materials using spray bottle with water/surfactant solution - materials must remain visibly damp throughout. Remove fixings carefully using hand tools only (spanners, screwdrivers) - do NOT use power tools, grinders, or saws. Support AC sections to prevent sudden drops or breakage. Lower sections gently to ground level using rope if elevated - do NOT drop or throw. Keep materials intact wherever possible - if breakage occurs, immediately wet broken edges and vacuum loose debris with Class H vacuum. Place removed AC sections directly into first waste bag, maintaining wet condition. Continuously monitor for fibre release (visible dust) - if observed, stop work, increase wetting, and reassess method. Work in maximum 1-hour sessions with breaks in clean area. Maximum 2 hours asbestos work per operative per 7-day period.

Critical Hold-Point: CRITICAL: NO cutting, drilling, grinding, or use of power tools permitted. Any breakage of AC materials must trigger immediate stop, additional wetting, and Class H vacuuming before proceeding.
5

Double-Bagging, Labelling, and Secure Storage

Waste Management

Place all AC waste and contaminated materials (including broken pieces, debris, polythene sheeting) into first waste bag (minimum 500 gauge). Remove excess air and seal with swan neck and tape. Damp-wipe exterior of first bag with wet cloth. Place sealed first bag into second UN-approved asbestos waste bag. Seal second bag with swan neck and tape. Affix asbestos warning labels to outer bag stating 'DANGER: CONTAINS ASBESTOS - AVOID CREATING DUST - BREATHE DUST AND YOU COULD DIE'. Record waste bag details: date, site location, approximate weight, waste description. Place sealed bags in locked skip or secure storage area away from public access. Arrange collection by registered waste carrier (verify Environment Agency registration). Complete waste consignment note (WCN) with all required details - retain copy for 3 years.

Critical Hold-Point: HOLD POINT: Supervisor must verify all waste bags are correctly double-bagged, sealed, and labelled before removal from work area. Waste must NEVER be placed in general waste skips.
6

Personnel and Equipment Decontamination, Visual Inspection

Decontamination and Close-Out

Decontaminate work area: vacuum all surfaces, tools, and equipment with Class H vacuum using slow, overlapping strokes. Damp-wipe all tools and equipment with wet cloths (dispose as asbestos waste). Remove polythene ground sheeting carefully - fold inwards to contain any debris, place in waste bag. Personnel decontamination: whilst still wearing respirator, vacuum entire surface of Type 5 coveralls using Class H vacuum (pay attention to seams, pockets, boots). Carefully remove coveralls by rolling inside-out, place in asbestos waste bag. Remove gloves inside-out, dispose in waste bag. Remove respirator last, dispose in waste bag. Wash hands and face thoroughly. Clean boots at wash station. Conduct visual inspection of work area - no visible debris or dust should remain. Remove warning signs and barriers only after supervisor confirms area is clean. Complete work record: operative names, hours worked, waste quantities, any incidents. File documentation with asbestos register.

Critical Hold-Point: HOLD POINT: Competent supervisor must conduct and sign off final visual inspection before work area is reopened. All PPE and cleaning materials must be disposed of as asbestos waste - NEVER reuse disposable PPE.

Emergency Rescue, First Aid & Spill Protocol

In the event of uncontrolled fibre release (visible dust cloud, material breakage, or spillage): STOP WORK IMMEDIATELY. All personnel evacuate work area maintaining respiratory protection. Establish extended exclusion zone (minimum 5 metres). Do not remove PPE until in clean area. Contact site supervisor and HSE if significant release occurs. Re-wet affected area using coarse spray (avoid creating aerosols). Allow fibres to settle (minimum 20 minutes). Use Class H vacuum to clean affected area using damp methods only. Conduct visual inspection before resuming work - consider air monitoring if uncertainty exists. For respiratory distress: move casualty to fresh air while maintaining their respiratory protection until clear of contaminated area. Administer oxygen if trained and available. Call 999 immediately - inform paramedics of asbestos exposure. For skin/eye contact: irrigate affected area with copious clean water for minimum 15 minutes. Seek medical attention. For injuries involving contaminated wounds: control bleeding, irrigate wound, cover with sterile dressing, seek immediate medical attention and inform medical staff of potential asbestos contamination. First aiders must wear appropriate PPE when treating casualties in contaminated areas. Maintain emergency contact list on site: Site Supervisor, HSE Emergency Line (0300 790 6787), Emergency Services (999), Occupational Health Provider. All incidents must be recorded in accident book and reported under RIDDOR if applicable (asbestos exposure incidents reportable to HSE). Maintain emergency shower/eyewash facilities within 10 metres of work area.

4. UK HSE Compliance FAQs: Non-Licensed Asbestos Cement Downpipe & Flue Removal

What is the legal difference between licensed and non-licensed asbestos work, and how do I confirm my downpipe removal falls under non-licensed work under CAR 2012?

Under the Control of Asbestos Regulations 2012, licensed asbestos work (requiring an HSE licence under Regulation 8) includes work with asbestos insulation, asbestos coating, or asbestos insulating board (AIB), except for certain short-duration maintenance activities. Non-licensed work (NNLW) covers work with other asbestos-containing materials (ACMs) such as asbestos cement, floor tiles, textured coatings, and gaskets, where exposure is sporadic, of low intensity, and the work does not exceed 2 hours in any 7-day period or 1 hour in a single session. To confirm your downpipe removal qualifies as NNLW: (1) Verify the material is asbestos cement (typically chrysotile/white asbestos in cement matrix) through the asbestos register or laboratory analysis - NOT AIB, lagging, or sprayed coatings. (2) Ensure the material is in good condition (not severely damaged or friable). (3) Confirm the work duration will not exceed the time limits. (4) You must still notify the enforcing authority (HSE or Local Authority) at least 14 days before starting work, even though a licence is not required. (5) All operatives must complete asbestos awareness training (CAR 2012 Regulation 10). If there is ANY doubt about material type or work classification, you must obtain professional advice from a UKAS-accredited asbestos surveyor or analyst. Working on licensed materials without a licence is a criminal offence carrying unlimited fines and imprisonment.

Why are power tools absolutely prohibited for asbestos cement removal, and what are the legal and health consequences of using them?

Power tools (angle grinders, drills, saws, sanders) are strictly prohibited for non-licensed asbestos cement work because they generate high levels of respirable asbestos fibres through mechanical action, creating an uncontrolled high-risk exposure scenario that exceeds the scope of non-licensed work controls. HSE Asbestos Essentials Task Sheet EM7 explicitly states that AC materials must be removed intact using hand tools only, with continuous wetting to suppress fibre release. Using power tools on asbestos cement: (1) Generates fibre concentrations that may exceed the Control Limit (0.1 fibres/cm³) by orders of magnitude, requiring licensed work controls including full enclosures, negative pressure units, and transit airlocks. (2) Transforms the work from 'sporadic and low intensity' to high-intensity exposure, automatically reclassifying it as work requiring an HSE licence under CAR 2012 Regulation 8. (3) Constitutes a breach of CAR 2012 Regulations 11 (prevention/reduction of exposure) and 16 (duty to prevent spread of asbestos). Legal consequences include: prosecution by HSE with unlimited fines, imprisonment up to 2 years, prohibition notices halting all work, and potential corporate manslaughter charges if fatalities result. Health consequences: significantly increased asbestos fibre inhalation for operatives and bystanders, dramatically elevating lifetime risk of mesothelioma, lung cancer, and asbestosis. The HSE has prosecuted numerous cases where contractors used power tools on asbestos cement, resulting in fines exceeding £500,000. The correct method is always: wet working, hand tools only, keep materials intact, and use Class H vacuuming for any dust.

What are the specific legal requirements for asbestos waste disposal under UK regulations, and what documentation must I retain to demonstrate compliance during an HSE inspection?

Asbestos waste disposal is strictly regulated under the Hazardous Waste (England and Wales) Regulations 2005 and Environmental Protection Act 1990. Legal requirements include: (1) Classification: All asbestos cement waste is classified as hazardous waste under EWC Code 17 06 05* (construction materials containing asbestos). (2) Packaging: Double-bag system mandatory - inner bag (minimum 500 gauge polythene) sealed and placed inside outer UN-approved asbestos waste bag (marked with UN2590 for chrysotile or UN2212 for other types), both clearly labelled with asbestos warning labels stating 'DANGER: CONTAINS ASBESTOS'. (3) Storage: Waste must be stored securely in locked containers preventing unauthorised access and weather damage, segregated from other waste streams. (4) Transportation: Waste must be transported ONLY by a registered waste carrier (verify current Environment Agency registration on public register). (5) Disposal: Waste must go to a licensed asbestos disposal facility (verify site Environmental Permit authorises asbestos acceptance). (6) Documentation: Complete a Waste Consignment Note (WCN) for every waste movement, containing: waste producer details, waste carrier details, disposal site details, waste description and EWC code, quantity, and signatures from all parties. You must retain copies of all WCNs for 3 YEARS - this is a legal requirement. During HSE inspections, you must produce: asbestos awareness training certificates for all operatives, enforcing authority notification confirmation, waste consignment notes, waste carrier registration verification, disposal site licence verification, and site waste management plan. Failure to comply with waste regulations can result in prosecution with unlimited fines and imprisonment. NEVER place asbestos waste in general waste skips or attempt to dispose of it yourself - this is fly-tipping and carries severe penalties including imprisonment.

5. Operative Toolbox Talk & Competent Person Sign-Off Register

Competent Person & Operative Declaration: By signing below, the Site Supervisor confirms this assessment has been adapted and verified for actual site conditions, and operatives confirm they have attended the pre-start Toolbox Talk for Non-Licensed Asbestos Cement Downpipe & Flue Removal and will follow the safe system of work.

Operative / Supervisor Name Trade / Role & CSCS No. Signature Date & Time
1. (Site Supervisor):     
2.     
3.     
4.     
5.     
6.     

Related UK Safety Templates & Risk Assessments