This Risk Assessment and Method Statement (RAMS) provides a systematic approach to the safe alteration of tube and fitting scaffold loading bay structures and the completion of mandatory 7-day statutory inspections in accordance with Work at Height Regulations 2005 (Regulation 12), NASC TG20:21 technical guidance, and CDM 2015 requirements. The document addresses all significant hazards associated with scaffold modification works including working at height, structural instability during alteration, manual handling of scaffold components, dropped objects, and adverse weather conditions. All operatives must hold valid CISRS cards (minimum Advanced Scaffolder for alterations), and works must be supervised by a CISRS Supervisor. The scaffold must be inspected by a competent person before handover, after alteration, and at intervals not exceeding 7 days. A TG20:21 compliant design must be in place, and all alterations must be recorded in the scaffold register with updated handover certificates issued. This RAMS ensures compliance with HSE guidance (HSG150, HSG33) and industry best practice for temporary works management.
| Identified Hazard & Harm | Initial Risk (L×S) | Mandatory Engineering, Isolation & Procedural Controls | Residual Risk |
|---|---|---|---|
| 1. Falls from height during scaffold alteration or inspection Harm: Fatal or life-changing injuries including spinal damage, head trauma, multiple fractures from falls exceeding 2 metres | 4 × 5 = 20 | Collective edge protection (guardrails, toe boards, brick guards) maintained at all times per TG20:21. Where temporary removal necessary, implement permit-to-work system with exclusion zones below. CISRS Advanced Scaffolder minimum competency. Personal fall arrest (EN 361/355 harness system) with secure anchor points when edge protection removed. Pre-use platform inspection. Maximum platform gap 25mm. Weather monitoring - cease work in wind speeds >17mph (Force 5) or during ice/snow. Rescue plan in place with trained personnel. | 2 × 5 = 10 |
| 2. Structural collapse or instability during loading bay alteration Harm: Multiple fatalities, crushing injuries, traumatic amputations from scaffold structure failure under load or during modification | 3 × 5 = 15 | TG20:21 compliant design by competent person (CISRS Advanced Scaffold Inspection Training Scheme or Chartered Engineer). Temporary propping/bracing installed before removing load-bearing components. Maximum bay lengths and lift heights per TG20:21 tables. Foundations inspected for settlement/deterioration. Ties maintained at maximum 4m horizontal × 4m vertical spacing. Load class clearly marked (Class 3 minimum for loading bay - 2.0kN/m²). Phased alteration sequence with hold points. LOLER inspection before, during, and after alteration. Scaffold register updated with each change. | 1 × 5 = 5 |
| 3. Struck by falling scaffold components or tools Harm: Severe head injuries, fractures, lacerations from dropped tubes (up to 4kg), fittings, or tools falling from height | 4 × 4 = 16 | Exclusion zone (minimum 3m radius) established and barriered below works with signage. Toe boards (minimum 150mm) and debris netting installed on all working platforms. Tool tethering mandatory - all hand tools attached via lanyards rated >5kg. Materials hoisted using gin wheel or hoist with secure containers - no throwing/dropping. Brick guards on external lifts. Hard hat mandatory for all within loading bay area. Segregated material storage zones. Pre-shift tool checks and inventory. Banksman controls ground-level access during lifting operations. | 2 × 4 = 8 |
| 4. Manual handling injuries from scaffold tubes and fittings Harm: Musculoskeletal disorders, back injuries, trapped fingers, hernias from repetitive lifting of tubes (3.9kg/m for 48.3mm tube) | 5 × 3 = 15 | Two-person lift for tubes >3.5m length or fittings bundles >15kg. Mechanical aids (gin wheel, material hoist) for vertical transfer - no manual passing up scaffold. Kinetic lifting techniques training (HSE INDG143). Task rotation to reduce repetitive strain. Anti-vibration gloves (EN ISO 10819) for podger/spanner use. Pre-shift stretching routine. Maximum carry distance 10m before rest. Tube racks at waist height to minimise bending. Competent person to assess manual handling risks per Manual Handling Operations Regulations 1992. | 3 × 3 = 9 |
| 5. Adverse weather conditions affecting scaffold stability and operative safety Harm: Hypothermia, slips on iced platforms, wind-blown scaffold collapse, lightning strike during inspection activities | 4 × 4 = 16 | Weather monitoring via Met Office or site weather station - cease work if wind >17mph (Beaufort Force 5), ice/snow on platforms, or thunderstorms within 10 miles. Sheeting secured or removed if wind forecast >30mph. Morning platform inspections for ice/water accumulation - treat with grit/salt or delay start. Thermal workwear provided for sub-5°C conditions. Lightning risk assessment - evacuate scaffold if storm approaches. Post-adverse weather inspection (SG4:15 checklist) before re-occupation. Ties and bracing checked after high winds. Inspection frequency increased to daily during winter months per Regulation 12(3). | 2 × 4 = 8 |
Conduct site-specific induction covering loading bay hazards, vehicle movements, and emergency procedures. Obtain Permit to Work from Principal Contractor including isolation of loading bay operations and exclusion zone establishment. Erect physical barriers (Heras fencing with signage) minimum 3m from scaffold base. Review existing scaffold handover certificate, design drawings (TG20:21), and scaffold register. Complete pre-alteration inspection using SG4:15 checklist: verify tie patterns, foundation condition, platform integrity, guardrail security, load class markings, and previous inspection records. Photograph existing configuration. Confirm all operatives hold valid CISRS cards (Advanced Scaffolder minimum) and site access permits. Establish tool-tethering station and material storage zone. Conduct weather check - confirm wind speed <17mph and no adverse weather forecast for work duration.
Review alteration sequence against TG20:21 design - identify load-bearing members requiring temporary support. Install temporary props, rakers, or bracing to maintain structural integrity during modification. Use adjustable base plates on firm, level ground with sole boards if required. Verify temporary works capacity exceeds design loads. Mark components for removal with chalk/tape. Confirm tie integrity adjacent to alteration zone - install additional ties if spacing will exceed 4m×4m during works. Check platform loading - remove excess materials to maintain Class 3 limit (2.0kN/m²). Brief team on phased removal sequence. Ensure gin wheel or hoist positioned for material lowering. Confirm exclusion zone remains secure and banksman in position.
Working from top lift downwards (unless design specifies otherwise), systematically loosen fittings using scaffold spanners - never use podgers as levers on loaded components. Remove standards, ledgers, and transoms in sequence that maintains three points of support for remaining structure. Lower components using gin wheel with secure containers - no free-dropping. For installation of new/modified sections: erect from bottom up, ensuring each lift is fully braced and tied before proceeding to next level. Maintain right-angle couplers tight (65Nm torque). Check verticality with spirit level every two lifts (maximum 1:100 deviation). Install transoms at maximum 1.3m spacing for Class 3 loading. Ensure all platforms have four-board width minimum (600mm) with maximum 25mm gaps. Replace any damaged or corroded components - do not re-use bent tubes or cracked fittings. Update scaffold tagging system as each phase completes.
Install guardrails at 950mm (main) and 470mm (intermediate) above platform level using scaffold tubes and right-angle couplers. Ensure guardrails capable of withstanding 0.74kN horizontal force per HSE guidance. Fit toe boards minimum 150mm height with maximum 25mm gap to platform. Install brick guards (debris netting) on external faces and above public/operative access areas. Lay scaffold boards with minimum 50mm overhang at supports, maximum 4:1 span-to-thickness ratio. Secure boards with anti-lift devices (clips or ties) where wind exposure high. Ensure no tipping - minimum three supports per board or two if banded. Check platform level tolerance (maximum 1:60 slope). Install access ladder with 1:4 rake, secured top and bottom, extending 1.05m above platform. Fit ladder gates or self-closing gates at access points. Apply load class identification tags (Class 3 - 2.0kN/m²) at each access point.
Conduct thorough post-alteration inspection per Work at Height Regulations 2005 Schedule 7 and SG4:15 checklist. Inspect: foundation stability, standard verticality and spacing, ledger/transom connections, tie adequacy (type, spacing, security), platform integrity, guardrail security, access provisions, load class marking, and overall structural stability. Apply inspection hammer test to couplers (audible ring indicates tightness). Measure critical dimensions against TG20:21 design. Photograph completed alteration from multiple angles. Complete TG20:21 handover certificate (Form SG4:10) with unique scaffold ID, location, load class, inspection date, and competent person signature. Update scaffold register with alteration details, new inspection due date (7 days maximum), and any specific use restrictions. Brief end-users on load limits, access routes, and prohibited modifications. Attach green 'Inspected and Safe to Use' tag with next inspection due date clearly visible.
Establish inspection schedule: every 7 days maximum, after adverse weather (winds >Force 7, heavy snow/ice), after any accidental impact, and before handover after substantial addition/alteration per Regulation 12. Competent person (CISRS Advanced Inspection Training Scheme or equivalent) to conduct inspection using SG4:15 checklist covering: ties (security, spacing, type), foundations (settlement, deterioration), standards (verticality, corrosion, damage), ledgers/transoms (security, spacing), platforms (gaps, condition, securing), guardrails (height, security, completeness), access (ladder condition, gates), load class marking, and general stability. Record inspection in scaffold register with date, inspector name/qualification, findings, and remedial actions. Any defects categorized: Category 1 (immediate danger - red tag and quarantine), Category 2 (rectify within 48 hours), Category 3 (monitor). Issue revised handover certificate after remedial works. Maintain inspection records for CDM file and minimum 3 years post-project.
In the event of a fall from height: DO NOT move the casualty unless in immediate danger (fire, further collapse risk). Call 999 immediately and request ambulance with trauma capability. Administer first aid only if trained - prioritise airway, breathing, circulation (ABC). Assume spinal injury - maintain cervical spine alignment. Control bleeding with direct pressure. Keep casualty warm and reassured. Activate site emergency response plan and notify Principal Contractor. Preserve scene for HSE investigation - do not disturb unless safety-critical. For scaffold collapse: evacuate area immediately, establish 10m exclusion zone, account for all personnel, call emergency services. For minor injuries (cuts, bruises): administer first aid from site-appointed First Aider (minimum Emergency First Aid at Work certified). All injuries must be recorded in site accident book (BI 510) and reported per RIDDOR 2013 if: fatal, major injury, over-7-day injury, or dangerous occurrence (structural collapse). First aid kit (HSE-compliant) must be accessible at loading bay entrance. Emergency assembly point and rescue equipment (stretcher, spinal board if working >2m) location confirmed during site induction. Ensure mobile phone signal confirmed or radio communication established before commencing works at height.
Under Work at Height Regulations 2005 Regulation 12 and Schedule 7, scaffolds must be inspected by a competent person: (a) before first use; (b) after substantial addition, dismantling, or alteration; (c) after any event likely to affect stability (e.g., adverse weather, accidental impact); and (d) at suitable intervals - interpreted as maximum 7 days for scaffolds used for construction work. A competent person must have sufficient training, experience, and knowledge to identify defects and assess their significance. For tube and fitting scaffolds, this typically requires CISRS Advanced Scaffold Inspection Training Scheme (ASITS) qualification or equivalent (e.g., Chartered Engineer with scaffolding specialism). The inspection must be recorded in a register or report within 24 hours, including: date, location, scaffold identification, inspector details, defects found, and remedial actions. Failure to inspect is a criminal offence under Section 33 of the Health and Safety at Work Act 1974, with penalties including unlimited fines and imprisonment. HSE guidance SG4:15 provides the industry-standard inspection checklist and reporting format.
Loading bay scaffolds require enhanced design parameters under NASC TG20:21 due to dynamic loading, impact forces, and concentrated loads from materials handling. Key considerations: (1) Load Class - minimum Class 3 (2.0kN/m² uniformly distributed load) or Class 4/5 if heavy materials stored; clearly marked at all access points. (2) Bay lengths and lift heights - must not exceed TG20:21 compliant configuration tables for the specified load class and tie pattern. (3) Tie density - maximum 4m horizontal × 4m vertical spacing, with additional ties near loading points to resist horizontal forces from forklift impact or material sliding. (4) Platform width - minimum 600mm (four boards) to accommodate safe materials handling and operative movement. (5) Edge protection - enhanced brick guards and debris netting due to higher risk of materials displacement. (6) Foundation design - must account for point loads from material stacks and potential ground deterioration from vehicle traffic; concrete pads or spreader plates often required. (7) Buttress or raking shores may be needed if loading bay projects from building face. Any alteration must be assessed by the original designer or equally competent person, with revised calculations and drawings issued. Loading bays are 'temporary works' under BS 5975:2019 and require formal design, checking, and supervision regime.
Under CDM 2015, scaffold alterations trigger specific duties: Principal Designer (Regulation 11) must ensure the design manages foreseeable risks during alteration works, including temporary instability, and provide relevant information in the pre-construction information pack. This includes existing scaffold design, loading restrictions, tie locations, and any hazards (e.g., overhead services, fragile materials). Principal Contractor (Regulation 13) must plan, manage, and monitor the alteration to ensure it's carried out without risk, coordinating with the scaffolding contractor (appointed contractor under CDM). Specific requirements: (1) Permit to Work system for scaffold alterations affecting other trades or creating temporary hazards. (2) Coordination of loading bay isolation to prevent vehicle/operative interaction during works. (3) Verification that scaffolding contractor holds appropriate liability insurance and competence (CISRS cards, NASC membership). (4) Ensuring scaffold register is maintained and inspection regime continues throughout alteration. (5) Communication of altered scaffold configuration to all affected parties via toolbox talks, updated site plans, and handover certificates. (6) Inclusion of scaffold inspection records and design information in the Health and Safety File (Regulation 12(8)). Scaffolding contractor remains responsible for safe execution per their method statement, but Principal Contractor retains overall site safety coordination duty. Any design changes during alteration must be approved by competent person and communicated via formal change control process. Failure in coordination is a common HSE enforcement issue, particularly where alterations create temporary high-risk situations not covered by original design.
Competent Person & Operative Declaration: By signing below, the Site Supervisor confirms this assessment has been adapted and verified for actual site conditions, and operatives confirm they have attended the pre-start Toolbox Talk for Tube & Fitting Scaffold Loading Bay Alteration & 7-Day Statutory Inspection and will follow the safe system of work.
| Operative / Supervisor Name | Trade / Role & CSCS No. | Signature | Date & Time |
|---|---|---|---|
| 1. (Site Supervisor): | |||
| 2. | |||
| 3. | |||
| 4. | |||
| 5. | |||
| 6. |