This Standard Operating Procedure (SOP) establishes mandatory requirements for the safe operation of pendant-controlled overhead cranes in heavy engineering environments. It covers pre-use inspection protocols, load slinging techniques, centre-of-gravity verification testing, and operational controls in accordance with the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), Provision and Use of Work Equipment Regulations 1998 (PUWER), and BS 7121 Safe Use of Cranes. This procedure applies to all appointed persons, crane operators, slingers, and banksmen involved in lifting operations. Only competent persons who have completed accredited training and hold valid certification may operate overhead cranes or perform slinging duties. All lifting equipment must have valid thorough examination certificates (6-monthly for lifting accessories, 12-monthly for cranes). This SOP mandates a systematic approach including daily pre-use checks, load assessment, centre-of-gravity determination, exclusion zone establishment, and post-operation inspection. Compliance with this procedure is mandatory and subject to audit by the Health & Safety Executive.
| Identified Hazard & Harm | Initial Risk (L×S) | Mandatory Engineering, Isolation & Procedural Controls | Residual Risk |
|---|---|---|---|
| 1. Catastrophic load drop due to sling failure, incorrect slinging, or exceeding Safe Working Load (SWL) Harm: Multiple fatalities, crush injuries, traumatic amputations, or permanent disability to personnel below or adjacent to suspended loads | 4 × 5 = 20 | Pre-use inspection of all lifting accessories per LOLER Schedule 1. Verify current thorough examination certificates (6-month). Check sling identification tags, SWL markings, and reject criteria (10% wire breaks, cuts, burns, distortion). Calculate load weight and select slings with adequate SWL and mode factor (basket, choke, vertical). Establish and enforce 5-metre exclusion zones. Appoint competent banksman. Implement LOTO during maintenance. | 2 × 4 = 8 |
| 2. Crane structural failure or mechanical malfunction (brake failure, wire rope parting, hook latch defect) Harm: Fatal crushing injuries, multiple casualties, catastrophic equipment damage, and facility structural collapse | 3 × 5 = 15 | Daily pre-use checks per manufacturer's manual covering brakes, limit switches, wire ropes, hook safety latches, pendant controls, and emergency stop. Verify valid 12-month LOLER thorough examination by competent person. Immediate withdrawal from service if defects identified. Implement planned preventive maintenance schedule. Display SWL prominently on crane. Never exceed rated capacity. Isolation and LOTO for all maintenance activities. | 1 × 5 = 5 |
| 3. Load instability or uncontrolled swing due to incorrect centre-of-gravity assessment or unbalanced slinging Harm: Striking personnel causing fatal head injuries, crushing against structures, load spillage, or secondary impact injuries | 4 × 4 = 16 | Conduct centre-of-gravity test by lifting load 100-150mm and observing balance before full lift. Adjust sling positions to achieve level suspension. Use spreader beams or equalising beams for unbalanced loads. Secure loose components before lifting. Lift slowly and smoothly avoiding sudden movements. Maintain minimum 2-metre clearance from structures. Tag lines mandatory for loads >1 tonne or where swing risk exists. Banksman to monitor throughout travel path. | 2 × 3 = 6 |
| 4. Electrocution or arc flash from crane contact with overhead electrical services or live conductors Harm: Fatal electrocution, severe burns, cardiac arrest, or permanent neurological damage to crane operator and ground personnel | 3 × 5 = 15 | Conduct site survey to identify and map all overhead electrical services. Maintain minimum 3-metre clearance from 415V supplies, greater for HV. Install physical barriers or goal-post height restrictors where required. Isolation and permit-to-work for lifts near electrical equipment. Operator training on electrical hazards. Emergency rescue procedures and CPR training for all lifting teams. Insulated rescue hooks available at crane location. | 1 × 5 = 5 |
| 5. Entanglement, crushing, or shearing injuries during slinging operations or at pinch points Harm: Traumatic amputations of fingers/hands, crush injuries to limbs, or fatal entrapment between load and structure | 4 × 4 = 16 | Never place hands/fingers between sling and load or in bight of sling under tension. Use tag lines to guide loads - never hands on load. Maintain minimum 0.5-metre clearance from pinch points. Coordinate all movements via banksman using standard signals per BS 7121-5. Implement 'hands-free' load landing using packing/dunnage. Stop work if personnel enter exclusion zone. Toolbox talks on hand safety and body positioning during slinging. | 2 × 3 = 6 |
Complete daily pre-use inspection using Form F91 or site-specific checklist. Verify crane has valid 12-month LOLER thorough examination certificate displayed. Inspect wire ropes for broken wires, kinking, bird-caging, or corrosion. Check hook for cracks, deformation, and verify safety latch operates correctly. Test all pendant controls including emergency stop, hoist up/down, and traverse functions. Inspect limit switches and audible warning devices. Examine all lifting slings, shackles, and accessories for current 6-month thorough examination tags, visible SWL markings, and absence of damage (cuts, burns, excessive wear, distortion). Reject any equipment not meeting acceptance criteria per LOLER. Record inspection findings and sign logbook. Report defects immediately to supervisor and tag equipment 'DO NOT USE'.
Determine load weight using documentation, markings, or weighing equipment. Identify load centre-of-gravity location and any unbalanced mass distribution. Select appropriate lifting accessories based on load weight, configuration, and attachment points. Calculate sling angles and apply mode factors (vertical=1.0, basket=2.0, choke=0.8). Ensure total sling capacity exceeds load weight with minimum 25% safety margin. Identify lift path and check for overhead obstructions, electrical services, personnel access routes, and adequate clearances (minimum 0.5m all sides). Establish exclusion zones with barriers and signage. Confirm landing area is prepared with adequate support and clear of obstructions. Brief all personnel on lift plan, signals, and emergency procedures. Obtain authorization from Appointed Person for complex or critical lifts.
Position slings at identified lifting points ensuring equal load distribution. For multi-leg slings, maintain sling angles between 45-60 degrees from vertical for optimal capacity. Protect sling contact points using packing where sharp edges exist. Ensure slings are not twisted and sit correctly in hooks/shackles. Verify hook safety latches close fully. Secure any loose components, covers, or attachments that could shift during lift. Clear area beneath and around load. Position tag lines if required for load control. Assign banksman with clear line-of-sight to operator and load. Confirm all personnel outside exclusion zone. Operator to test hoist controls with minimal slack take-up before applying load.
On banksman signal, operator to take up slack slowly until slings are tensioned but load remains on ground. Pause and verify sling seating and load stability. On confirmation signal, lift load 100-150mm (6 inches) maximum and STOP. Hold position for 5 seconds minimum. Banksman to observe load orientation - load must hang level without tilting. If load tilts or rotates, lower immediately and reposition slings to correct centre-of-gravity. Repeat test lift until load hangs level and stable. Once balanced, lift additional 300mm and pause to verify continued stability and clearance from obstructions. Check for load component movement or shifting. Only proceed with full lift after successful centre-of-gravity verification.
Following successful test lift, raise load to minimum safe travel height (minimum 0.5m clearance above highest obstruction). Maintain smooth, controlled movements - avoid jerking, sudden stops, or rapid direction changes. Operator to maintain visual contact with load or follow banksman signals exclusively per BS 7121-5. Travel at walking pace maximum. Use tag lines to prevent load rotation or swing - never use hands directly on load. Maintain 2-metre minimum clearance from structures, stored materials, and personnel. Stop immediately if any person enters exclusion zone. Pause travel if visibility obscured or communication lost. Approach landing area slowly and position load accurately over prepared landing point using banksman guidance.
Lower load onto prepared landing area using packing/dunnage to maintain clearance for sling removal. Descend slowly with controlled deceleration. Once load fully supported and stable, slacken slings completely before removal. Never pull slings from under load - use lever or jack to lift edge if necessary. Remove slings using hands-free techniques keeping fingers clear of pinch points. Inspect slings and accessories for damage incurred during lift - report any defects. Return crane hook to park position at safe height. Complete lifting operation record including load details, equipment used, and any incidents. Store lifting accessories in designated area protected from weather and mechanical damage. Update crane logbook with operational hours and any observations requiring maintenance attention.
**EMERGENCY PROCEDURES:** **Load Drop / Crushing Injury:** Activate emergency services 999 immediately. Do not move casualty unless in immediate danger. Control severe bleeding with direct pressure. Treat for shock. Isolate crane and preserve scene for HSE investigation. Implement major incident plan. **Suspended Load Emergency (Power Failure):** Activate emergency stop. Evacuate all personnel to 10-metre exclusion zone. Establish barriers and warning signage. Contact maintenance to implement manual lowering procedure per manufacturer's instructions. Do not attempt to restart crane or enter beneath suspended load. Notify Appointed Person and site management immediately. **Electrocution Incident:** DO NOT TOUCH CASUALTY if still in contact with electrical source. Isolate power supply immediately or contact emergency electrical isolation. Once safe, commence CPR if required. Call 999. Use insulated rescue hook if available. All electrocution incidents are RIDDOR reportable. **Sling/Equipment Failure:** If sling shows signs of failure during lift (unusual sounds, load tilting, visible damage), lower load immediately to nearest safe position. Evacuate area and establish exclusion zone. Withdraw equipment from service and tag 'DANGEROUS - DO NOT USE'. Notify Appointed Person and HSE if near-miss criteria met. **First Aid:** Qualified First Aiders available [INSERT LOCATION]. First Aid room located [INSERT LOCATION]. All injuries, however minor, must be recorded in accident book (BI 510) and reported to supervisor. RIDDOR reportable injuries (fractures, amputations, crushing injuries, 7+ day incapacitation) must be reported to HSE within required timeframes. **Emergency Contacts:** Site Emergency: [INSERT], HSE Incident Contact Centre: 0345 300 9923, Appointed Person: [INSERT], Crane Maintenance: [INSERT]
Under LOLER 1998 Regulation 9 and associated ACOP L113, overhead cranes used for lifting persons or loads must undergo thorough examination by a competent person at specified intervals: 12 months for the crane structure and mechanisms, and 6 months for lifting accessories (slings, shackles, hooks). Equipment must also be thoroughly examined after installation, before first use, and following any event that may affect integrity (e.g., overload, impact damage). The duty holder (employer/equipment owner) is legally responsible for arranging examinations, maintaining records, and ensuring equipment is not used if examination is overdue or defects are identified. Thorough examination reports must be retained for at least 2 years. Competent persons are typically from accredited inspection bodies (e.g., LEEA members, insurance engineering surveyors). Daily pre-use checks by operators supplement but do not replace statutory thorough examinations. Operating lifting equipment without valid examination certificates is a criminal offence with potential for prosecution, unlimited fines, and imprisonment.
Sling angle dramatically affects load distribution and effective capacity. The SWL of multi-leg slings must account for: (1) the sling angle from vertical, (2) the mode of use (basket, choke, or vertical hitch), and (3) the number of legs sharing the load. As sling angle increases from vertical, tension in each leg increases significantly - at 60° from vertical, each leg carries 100% of the load; at 45°, each leg carries 71%; at 30°, each leg carries 50%. The formula is: Load per leg = (Total Load ÷ Number of legs) ÷ cos(angle from vertical). For example, a 2-tonne load on a 2-leg sling at 60° from vertical means each leg carries 2000kg, requiring slings rated >2000kg each. Never exceed 60° from vertical as capacity reduces dangerously. Always apply a safety factor - select slings with SWL at least 25% above calculated load. Sling manufacturers provide capacity charts showing SWL at various angles. Incorrect angle calculation is a primary cause of sling failure and fatal accidents. When in doubt, consult the Appointed Person or use spreader beams to maintain vertical sling orientation.
Under PUWER Regulation 9 and LOLER Regulation 8, only competent persons may operate lifting equipment or supervise lifting operations. 'Competence' is defined in HSE guidance as possessing sufficient training, experience, knowledge, and other qualities to perform duties safely. For overhead crane operators, this typically requires: (1) Accredited training from a recognized body (e.g., CPCS, NPORS, ALLMI, or in-house training meeting HSE standards), (2) Successful theory and practical assessment, (3) Valid certification/card specific to crane type and capacity, (4) Familiarization training on specific equipment and site conditions, (5) Medical fitness assessment (vision, hearing, physical capability), and (6) Periodic refresher training (typically 3-5 years). Slingers and banksmen require separate accredited training covering load assessment, slinging techniques, signaling, and hazard recognition. Appointed Persons (required for complex lifts) need additional qualifications such as CPCS A61 or equivalent demonstrating advanced knowledge of BS 7121 and lift planning. Employers must maintain training records, competency assessments, and authorization documentation. Allowing untrained persons to operate cranes is a serious breach resulting in prosecution, prohibition notices, and potential manslaughter charges if fatalities occur. Competency is not just about certification - ongoing supervision, mentoring, and assessment of actual performance are equally important.
Competent Person & Operative Declaration: By signing below, the Site Supervisor confirms this assessment has been adapted and verified for actual site conditions, and operatives confirm they have attended the pre-start Toolbox Talk for Pendant-Controlled Overhead Crane Pre-Use Check, Load Slinging & Centre-of-Gravity Test and will follow the safe system of work.
| Operative / Supervisor Name | Trade / Role & CSCS No. | Signature | Date & Time |
|---|---|---|---|
| 1. (Site Supervisor): | |||
| 2. | |||
| 3. | |||
| 4. | |||
| 5. | |||
| 6. |