Under CDM 2015 Regulation 13, PUWER 1998 Regulation 4, and the Control of Vibration at Work Regulations 2005, all Makita DHR263 36V SDS-Plus rotary hammer drill operations require documented risk assessment, operator competency verification, HAVs exposure monitoring (2.5 m/s² A(8) daily exposure limit), mandatory isolation during bit changes, and engineering controls to reduce residual risk from HIGH (15-20) to MEDIUM (6-8) or lower through systematic pre-use inspection, dust suppression, and vibration management protocols per HSG150 and BS EN 60745 standards.

Statutory FrameworkCDM 2015, PUWER 1998, LOLER 1998, HSG150 Health & Safety in Construction, BS EN 60745 Power Tools, HAVs Control of Vibration at Work Regulations 2005
ClassificationNot applicable – Makita DHR263 is a battery-powered electrical tool. However, operations may generate respirable crystalline silica (RCS) dust when drilling concrete/masonry (classified as IARC Group 1 carcinogen). Ensure compliance with EH40/2005 Workplace Exposure Limits (WEL) for RCS: 0.1 mg/m³ 8-hour TWA. Implement dust suppression per HSG150 and use RPE where engineering controls are insufficient.
Required Plant / KitMakita DHR263 36V (2 x 18V) LXT SDS-Plus rotary hammer drill with anti-vibration technology • Makita BL1850B 18V 5.0Ah Li-ion batteries (minimum 2) with charge status indicators • Makita DC18RD dual-port rapid battery charger with cooling system • SDS-Plus drill bits and chisels (appropriate for substrate) with secure storage case • On-tool dust extraction attachment or Makita DX01 dust extraction system with H-class vacuum (BS 8520-2)
Site Sign-Off StatusRequires Competent Person Verification
Instant AI Customization or Free Blank Word (.doc) Download

Need this RAMS customized with your Company Name, Site Postcode & Nearest A&E Hospital?

Dictate your site specifics on your phone in 45 seconds to auto-compile a signed PDF—or download our free blank Word (.doc) shell below.

Auto-Fill via Voice / CLP (45s)

1. Mandatory Personal Protective Equipment (BS EN Standards)

BS EN ISO 10819:2013
Anti-vibration gloves (HAVs rated)
Mandatory to reduce hand-arm vibration transmission from 12 m/s² (tool vibration emission) and comply with Control of Vibration at Work Regulations 2005. Must not compromise grip or dexterity.
BS EN 166:2001 (minimum Grade F impact)
Safety spectacles or full-face shield
Protection against high-velocity concrete/masonry fragments, metal particles, and dust ejection during drilling and chiselling operations. Face shield required for overhead work.
BS EN 149:2001+A1:2009 (FFP3) or BS EN 140:1999 with P3 filters
Respiratory protective equipment (RPE) - FFP3 disposable or half-mask with P3 filters
Mandatory protection against respirable crystalline silica (RCS) dust when drilling concrete, brick, or masonry. Face-fit testing required per HSG53. APF minimum 20.
BS EN ISO 20345:2011 (S3 rating minimum)
Safety footwear with penetration-resistant midsole
Protection against falling tools, dropped drill bits, and penetration hazards from sharp debris on construction sites. Ankle support recommended for uneven surfaces.

2. 5×5 Hazard Risk Assessment Matrix (HASAWA 1974 / MHSWR 1999)

Identified Hazard & HarmInitial Risk (L×S)Mandatory Engineering, Isolation & Procedural ControlsResidual Risk
1. Hand-Arm Vibration Syndrome (HAVs) from prolonged exposure to 12 m/s² vibration emission
Harm: Permanent vascular and neurological damage to fingers, hands, and arms (vibration white finger), loss of manual dexterity, chronic pain, reduced grip strength
4 × 4 = 16Implement HAVs control hierarchy per L140 guidance: (1) Limit continuous operation to 30-minute intervals with 10-minute breaks; (2) Maintain tool per manufacturer schedule to minimise vibration; (3) Use anti-vibration handles and BS EN ISO 10819 gloves; (4) Monitor daily A(8) exposure using HSE calculator - trigger action at 2.5 m/s² EAV; (5) Health surveillance for operators exceeding 100 exposure points annually; (6) Rotate operators to reduce individual exposure; (7) Pre-drill pilot holes to reduce drilling time.3 × 2 = 6
2. Respirable Crystalline Silica (RCS) dust inhalation during concrete/masonry drilling
Harm: Silicosis (irreversible lung scarring), chronic obstructive pulmonary disease (COPD), lung cancer, increased tuberculosis risk
5 × 4 = 20Engineering controls mandatory per HSG150: (1) Use on-tool dust extraction (Makita DX01 or equivalent) connected to H-class vacuum (BS 8520-2) with >99.995% filtration efficiency; (2) Wet drilling methods where feasible; (3) RPE (FFP3 minimum, APF 20) mandatory when WEL may be exceeded; (4) Face-fit testing per HSG53; (5) Atmospheric monitoring in enclosed spaces; (6) Exclude non-essential personnel from 3m radius; (7) Dampen work area before cleanup; (8) Never use compressed air or dry sweeping; (9) Health surveillance including spirometry for regular users.3 × 2 = 6
3. Struck-by injuries from rotating drill bit or ejected fragments during operation
Harm: Lacerations, puncture wounds, eye injuries including corneal abrasion or penetration, facial trauma, broken bones from tool kickback
4 × 3 = 12Implement PUWER 1998 Reg 11 guarding requirements: (1) Maintain 3m exclusion zone marked with barriers/signage; (2) Secure workpiece with clamps - never hand-hold; (3) Inspect drill bits for damage/wear before each use - replace if cracked or blunt; (4) Ensure correct SDS-Plus bit engagement (audible click and pull-test); (5) Position body to side of tool rotation plane; (6) Use two-handed grip at all times; (7) Anticipate and brace for kickback when bit binds; (8) BS EN 166 eye protection mandatory; (9) Disconnect battery during bit changes; (10) Never bypass safety clutch.2 × 3 = 6
4. Electrical hazards from contact with concealed live cables or services
Harm: Electric shock, cardiac arrest, severe burns, arc flash injuries, secondary falls from shock reaction
3 × 5 = 15CDM 2015 Reg 13 pre-construction information mandatory: (1) Obtain and review service drawings/as-builts before drilling; (2) Use CAT & Genny cable avoidance tools to scan drilling locations - mark safe zones; (3) Implement safe digging practices per HSG47; (4) Limit drilling depth with depth stop until services confirmed clear; (5) Assume cables present if no drawings available; (6) Use battery-powered tools to eliminate trailing leads; (7) Establish permit-to-work for drilling near known services; (8) Emergency procedures displayed - know location of isolation points; (9) First aider present for high-risk areas; (10) RCD protection (30mA) if mains power used for ancillary equipment.2 × 4 = 8
5. Manual handling injuries and musculoskeletal disorders from tool weight (4.2kg) and awkward postures
Harm: Lower back strain, shoulder impingement, rotator cuff injuries, neck strain, cumulative trauma disorders, acute muscle tears
5 × 3 = 15Manual Handling Operations Regulations 1992 compliance: (1) Conduct task-specific risk assessment per HSE LITE tool; (2) Use mechanical aids (mobile platforms, scaffolding) to achieve ergonomic working height - avoid overhead drilling where possible; (3) Two-person lift for equipment transport if combined weight >15kg; (4) Maintain neutral wrist position using side handle; (5) Take micro-breaks every 15 minutes for overhead work; (6) Pre-shift stretching and warm-up exercises; (7) Rotate tasks to vary muscle groups; (8) Use counterbalance support arms for extended overhead operations; (9) Training in correct posture and grip techniques; (10) Report early symptoms of discomfort.3 × 2 = 6

3. Step-by-Step Safe Sequence of Operations & Hold-Points

1

Site Assessment, Service Location, and Tool Pre-Use Check

Pre-Operation Inspection & Planning

Review CDM 2015 pre-construction information and obtain service drawings. Use CAT & Genny to scan drilling locations and mark safe zones with spray paint. Establish 3m exclusion zone with barriers and signage. Inspect Makita DHR263: check battery charge status (minimum 50%), examine SDS-Plus chuck for wear/damage, verify anti-vibration mounts intact, test forward/reverse selector and mode switches, confirm side handle secure. Inspect drill bits for cracks, blunt edges, or bent shanks - reject defective items. Verify dust extraction system functional with adequate suction. Check all mandatory PPE available and in serviceable condition. Confirm operator holds valid competency certificate (CSCS/NPORS or equivalent) and HAVs awareness training current. Review emergency procedures and location of first aid/eyewash station.

Critical Hold-Point: STOP WORK if service drawings unavailable or CAT scan indicates buried services within drilling zone. DO NOT proceed without permit-to-work. Verify battery fully seated with audible click - loose batteries can disconnect during operation causing loss of control.
2

Workpiece Securing, Bit Installation, and Control Verification

Setup & Isolation

Don all mandatory PPE including FFP3 respirator (conduct seal check per HSG53), anti-vibration gloves, and BS EN 166 eye protection. Secure workpiece with mechanical clamps or bracing - never hand-hold material. Remove battery from Makita DHR263 before bit installation (LOTO principle). Select appropriate SDS-Plus bit for substrate and drilling depth. Clean bit shank and chuck with dry cloth. Insert bit into chuck with twisting motion until audible click - perform pull-test to verify engagement (bit should not withdraw). Set depth gauge if required using adjustment knob. Reinsert battery and verify charge indicator illuminates. Set mode selector (rotation only, rotation with hammer, or hammer only) appropriate for task. Attach dust extraction nozzle and connect to running H-class vacuum. Position body to side of drilling plane with stable footing. Adopt two-handed grip: main handle and side handle.

Critical Hold-Point: MANDATORY HOLD POINT: Supervisor or competent person must verify correct bit installation, dust extraction operational, and exclusion zone established before energising tool. Never install/remove bits with battery connected - rotating chuck can cause severe hand injuries.
3

Controlled Start, Penetration, and Vibration Monitoring

Initial Drilling Operation

Position drill bit perpendicular to work surface at marked location. Apply light forward pressure and squeeze trigger progressively to start rotation - do not force. Allow tool to reach full speed before applying drilling pressure. Use steady, moderate pressure - excessive force increases vibration, reduces bit life, and risks kickback. Monitor bit alignment continuously - withdraw and restart if drilling off-angle. For deep holes, withdraw bit periodically to clear debris and prevent binding. Watch for sudden changes in resistance indicating rebar, voids, or services - stop immediately if unexpected. Monitor vibration exposure time using stopwatch or HAVs timer app. Limit continuous operation to 30-minute maximum before mandatory 10-minute break. Observe dust extraction performance - stop if suction inadequate and investigate blockage. Maintain awareness of exclusion zone - halt if personnel approach.

Critical Hold-Point: STOP IMMEDIATELY if: (1) Bit binds or jams - release trigger and allow rotation to stop before reversing; (2) Unusual vibration, noise, or smell detected; (3) Sparks observed (indicates electrical cable strike); (4) Tool overheats (battery indicator flashes red). Brace for kickback when bit breaks through to void or exits material.
4

Continuous Monitoring, Break Intervals, and Adaptive Control

Ongoing Operation

Continue drilling operation with constant vigilance for changing conditions. Record cumulative vibration exposure time on HAVs monitoring sheet - calculate A(8) exposure using HSE points system (12 m/s² = 960 points per hour). Enforce mandatory 10-minute break after each 30-minute operating period - remove gloves and perform hand exercises to restore circulation. During breaks, inspect tool for damage, overheating, or loose components. Check battery charge status - swap to fresh battery if below 30% to maintain consistent power and reduce vibration. Clean dust extraction nozzle if accumulation observed. Reassess exclusion zone if work area changes. For overhead drilling, limit continuous work to 15 minutes and use mechanical support where possible. Rotate operators if multiple personnel available to distribute vibration exposure. Maintain hydration - dehydration increases HAVs susceptibility. Report any hand tingling, numbness, or blanching immediately to supervisor.

Critical Hold-Point: DO NOT EXCEED 2.5 m/s² A(8) Exposure Action Value (EAV) - approximately 2 hours total trigger time for DHR263. Exceeding 5.0 m/s² Exposure Limit Value (ELV) is a legal breach. Supervisor must halt work if exposure limits approached. Never continue working through hand numbness or pain.
5

Safe Withdrawal, Decontamination, and Isolation

Completion & Tool Shutdown

Upon completing drilling operations, release trigger and allow drill bit to stop rotating completely before withdrawing from hole. Maintain two-handed grip during withdrawal to control tool weight. Set tool on stable surface - never place on edges where it may roll. Remove battery immediately and store separately (LOTO principle). Switch off and disconnect dust extraction system. Allow tool to cool for minimum 5 minutes before handling hot components. Remove drill bit: pull back chuck collar and withdraw bit with twisting motion. Inspect bit for damage and clean with wire brush - store in designated case. Clean tool exterior using damp cloth - never use compressed air (disperses RCS dust). Inspect ventilation slots for dust accumulation and clean with soft brush. Wipe anti-vibration handles with disinfectant. Remove PPE in correct sequence: gloves (inside-out), respirator (by straps only), eye protection. Dispose of single-use FFP3 respirators as hazardous waste. Wash hands and face thoroughly before eating/drinking.

Critical Hold-Point: MANDATORY HOLD POINT: Do not remove respiratory protection until dust has settled (minimum 5 minutes) and area ventilated. Hot drill bits can cause severe burns - allow cooling before handling. Battery must be removed before any cleaning or maintenance.
6

Inspection Recording, HAVs Logging, and Secure Storage

Post-Operation Documentation & Storage

Complete tool inspection checklist noting any defects, damage, or performance issues. Record total operating time and cumulative HAVs exposure in operator's personal exposure logbook - supervisor to countersign. Calculate daily A(8) exposure and update individual's annual exposure points total. Flag any operator approaching 100 exposure points for health surveillance referral. Report any near-misses, tool malfunctions, or safety concerns via site reporting system. Clean work area: dampen dust with water spray, collect debris using H-class vacuum (never sweep), dispose of waste per site waste management plan. Remove exclusion zone barriers and signage. Inspect batteries: check for damage, swelling, or leakage - quarantine defective units. Charge depleted batteries using Makita DC18RD charger in designated area with fire extinguisher available. Store Makita DHR263 in lockable storage with battery removed and stored separately. Secure drill bits in case to prevent damage. Update plant register with usage hours for maintenance scheduling. File completed RAMS and inspection records per document control procedure.

Critical Hold-Point: Never store tool with battery installed - prevents unauthorised use and eliminates electrical fire risk. Damaged or swollen lithium-ion batteries are fire/explosion hazard - isolate immediately and follow battery incident procedure. Ensure HAVs records retained for minimum 5 years per Control of Vibration Regulations 2005.

Emergency Rescue, First Aid & Spill Protocol

**EMERGENCY CONTACTS:** Site First Aider: [Insert Name/Number] | Emergency Services: 999 | Site Manager: [Insert Number] | HSE Incident Hotline: [Insert Number] **ELECTRIC SHOCK:** DO NOT TOUCH casualty if still in contact with live conductor. Isolate power source immediately using nearest isolation point. If safe, use non-conductive material (dry wood/plastic) to separate casualty from source. Call 999 immediately. Check responsiveness and breathing - commence CPR if required (Resuscitation Council UK guidelines). Place unconscious breathing casualty in recovery position. Treat burns with cool running water for 20 minutes. All electric shock incidents are RIDDOR reportable - preserve scene and notify HSE within required timeframe. **EYE INJURIES (Foreign Body/Dust):** Do not rub eye. Irrigate with sterile eyewash for minimum 10 minutes - hold eyelids open. If particle embedded, do not attempt removal - cover both eyes with sterile pads and seek immediate medical attention. All eye injuries require professional assessment - transport to A&E or call 999 if severe. Report via RIDDOR if results in 7+ days incapacity. **HAND-ARM VIBRATION SYMPTOMS:** If operator experiences tingling, numbness, loss of sensation, blanching (white fingers), or pain during or after tool use, stop work immediately. Remove from vibration exposure and report to supervisor. Do not resume vibration work until assessed by occupational health physician. Document incident in accident book and HAVs surveillance records. May indicate early-stage HAVs requiring work modification or redeployment. **RESPIRATORY DISTRESS (Dust Inhalation):** Move casualty to fresh air immediately. Loosen tight clothing. Sit upright to ease breathing. If breathing difficulties persist, call 999. Administer oxygen if trained and available. Monitor consciousness and breathing continuously. Severe silica exposure may cause delayed symptoms - all significant inhalation incidents require medical assessment. Report via RIDDOR if results in hospital admission. **CRUSH/IMPACT INJURIES:** Control bleeding with direct pressure using sterile dressing. Immobilise injured limb. Apply cold compress to reduce swelling (not directly on skin). Do not remove embedded objects. Call 999 for severe injuries or suspected fractures. Elevate injured limb if no fracture suspected. Monitor for shock (pale, cold, rapid pulse). All injuries requiring hospital treatment are RIDDOR reportable if result in 7+ days incapacity or specified injury (fracture, amputation, etc.). **TOOL FIRE (Battery/Electrical):** Evacuate immediate area. If safe and fire small, use CO2 or dry powder extinguisher (never water on electrical/battery fires). Lithium-ion battery fires are extremely hazardous - call 999 immediately. Allow battery to burn out in controlled manner if extinguishing unsafe. Ventilate area due to toxic fumes. Quarantine damaged batteries in sand-filled metal container outdoors, away from combustibles. Report all fire incidents to HSE and battery manufacturer.

4. UK HSE Compliance FAQs: Makita DHR263 36V SDS-Plus Rotary Hammer Drill

5. Operative Toolbox Talk & Competent Person Sign-Off Register

Competent Person & Operative Declaration: By signing below, the Site Supervisor confirms this assessment has been adapted and verified for actual site conditions, and operatives confirm they have attended the pre-start Toolbox Talk for Makita DHR263 36V SDS-Plus Rotary Hammer Drill and will follow the safe system of work.

Operative / Supervisor Name Trade / Role & CSCS No. Signature Date & Time
1. (Site Supervisor):     
2.     
3.     
4.     
5.     
6.     

Related UK Safety Templates & Risk Assessments