This Risk Assessment and Method Statement (RAMS) provides comprehensive safety controls for hyper-chlorination disinfection of cold water storage tanks and cooling towers to control Legionella bacteria. The procedure addresses critical hazards including exposure to high-concentration chlorine solutions (50-100 mg/l), confined space entry, chemical burns, respiratory hazards, and biological contamination. All works must comply with HSE ACOP L8 (Legionnaires' Disease: The control of legionella bacteria in water systems), HSG274 Parts 1-3, COSHH Regulations 2002, and Confined Spaces Regulations 1997. Only competent water hygiene operatives holding relevant qualifications (City & Guilds Legionella Control, WMSoc certification) may undertake this work. A Permit to Work system must be implemented for all confined space entries. Pre-disinfection microbiological sampling, dosing calculations, contact time monitoring (minimum 1 hour at 50mg/l free chlorine), neutralisation, and post-disinfection validation testing are mandatory. Emergency decontamination facilities and rescue equipment must be immediately available throughout the operation.
| Identified Hazard & Harm | Initial Risk (L×S) | Mandatory Engineering, Isolation & Procedural Controls | Residual Risk |
|---|---|---|---|
| 1. Exposure to high-concentration chlorine solution (50-100 mg/l) and chlorine gas release Harm: Fatal respiratory injury, chemical pneumonitis, severe eye/skin burns, pulmonary oedema. Chlorine gas WEL exceedance (>1 ppm STEL). | 4 × 5 = 20 | Continuous atmospheric monitoring (intrinsically safe multi-gas detector, 0.5 ppm alarm). Full-face ABEK-P3 respirator (face-fit tested). Dosing in well-ventilated areas/outdoors. Closed dosing system with anti-siphon valve. Emergency eyewash/drench shower within 10m. Buddy system. Permit to Work. SDS on-site. Neutralisation agent (sodium thiosulphate) immediately available. | 2 × 3 = 6 |
| 2. Confined space entry into water storage tanks (oxygen deficiency, toxic gas accumulation, engulfment) Harm: Asphyxiation, unconsciousness, drowning, toxic gas poisoning. 50% of confined space fatalities involve would-be rescuers. | 4 × 5 = 20 | Confined Spaces Regulations 1997 compliance. Permit to Work with atmospheric testing (O₂ 19.5-23%, chlorine <0.5 ppm, H₂S <5 ppm). Forced mechanical ventilation (min 6 air changes/hour). Continuous gas monitoring. Trained confined space rescue team with tripod/winch. Harness with retrieval line. Communication system (radio/line signals). Emergency rescue plan rehearsed. No lone working. Tank isolated and drained where practicable. | 2 × 4 = 8 |
| 3. Legionella bacteria exposure during tank cleaning and sampling (pre/post disinfection) Harm: Legionnaires' disease (pneumonia, 10% fatality rate), Pontiac fever. Immunocompromised persons at higher risk. | 3 × 4 = 12 | Minimise aerosol generation (no high-pressure jetting during sampling). FFP3 respirator during pre-disinfection work. Avoid working directly over open water. Microbiological sampling by trained operatives using aseptic technique. Hyper-chlorination to 50 mg/l free chlorine for minimum 1-hour contact time (HSG274 Part 2). Post-disinfection validation: total viable count <1000 cfu/ml, Legionella <100 cfu/L. Health surveillance for operatives (L8 para 242). | 2 × 3 = 6 |
| 4. Working at height during tank access (ladders, platforms, open tank edges) Harm: Falls from height >2m causing major injury or fatality, drowning if fall into water-filled tank. | 3 × 5 = 15 | Work at Height Regulations 2005 compliance. Collective protection prioritised: fixed guardrails, edge protection, secured tank lids. Where not practicable: fall arrest harness with twin-lanyard system anchored to certified points (load-tested). Ladder inspection (Class 1 Industrial, 3-point contact). Non-slip surfaces. Adequate lighting (min 200 lux). Exclusion zone below work area. Rescue plan for person suspended in harness (<15 min suspension trauma risk). | 2 × 4 = 8 |
| 5. Incompatible chemical mixing (hypochlorite with acids/ammonia) causing toxic gas release Harm: Chlorine gas or chloramine gas generation causing severe respiratory injury, chemical burns, potential fatality. | 3 × 5 = 15 | COSHH assessment and chemical compatibility check before dosing. Segregated chemical storage (>3m separation). Dedicated dosing equipment (no shared pipework). System flushed and drained of incompatible chemicals before hypochlorite addition. pH monitoring (maintain 7-8 during dosing). Only use approved biocides per HSG274. Operatives trained in chemical hazards (COSHH training certificate). Emergency procedures for gas release (evacuate, ventilate, emergency services 999). | 1 × 4 = 4 |
Conduct pre-work site survey: identify tank/cooling tower location, capacity (litres), access points, ventilation, emergency routes. Review schematic drawings and previous microbiological test results. Issue Permit to Work (confined space/chemical work). Notify building occupants and display warning signs ('WATER SYSTEM DISINFECTION IN PROGRESS - DO NOT USE'). Isolate system: close inlet valves, tag and lock out (LOTO). De-energise pumps and electrical equipment (LOTO). Drain system to working level if required (retain sufficient water for dosing calculations). Take pre-disinfection microbiological samples (Legionella, TVC, temperature) using aseptic technique. Establish exclusion zone (3m minimum) with barriers.
Don full PPE (full-face respirator, chemical coveralls, gloves, boots). Calibrate multi-gas monitor (O₂, chlorine, H₂S, LEL) using span gas. Conduct initial atmospheric test at tank access point, mid-level, and bottom (gases stratify). Acceptable parameters: O₂ 19.5-23%, chlorine <0.5 ppm, H₂S <5 ppm, LEL <10%. If unacceptable, establish forced mechanical ventilation (portable blower, min 6 air changes/hour). Re-test after 15 minutes ventilation. Set up continuous atmospheric monitoring with audible alarms. Position emergency rescue equipment: tripod over access point, winch, rescue harness, communication system. Assign trained standby person (never enter to rescue without BA).
Calculate sodium hypochlorite dose required to achieve 50 mg/l free chlorine (HSG274 Part 2 minimum). Formula: Dose (litres) = [Tank volume (litres) × Target concentration (mg/l)] ÷ [Hypochlorite strength (%) × 10,000]. Use closed dosing system (pump or venturi injector) with backflow prevention. Add hypochlorite slowly to avoid localised high concentrations and gas release. Continuously monitor chlorine gas levels during dosing. Mix thoroughly using system pumps (if safe to re-energise under controlled conditions) or portable mixer. Measure free chlorine residual at multiple points (top, middle, bottom) using calibrated DPD test kit or photometer. Adjust dose if required to achieve uniform 50-100 mg/l throughout system. Record dosing time, volume added, and chlorine concentrations.
Maintain minimum 1-hour contact time at 50 mg/l free chlorine (HSG274 requirement). For heavily contaminated systems or cooling towers, extend to 2-4 hours or overnight. Monitor and record free chlorine residual every 15 minutes. If residual drops below 50 mg/l, add supplementary dose. Monitor pH (maintain 7-8 for optimal disinfection). Monitor water temperature (disinfection more effective at >20°C). Ensure system remains isolated with warning signs in place. Maintain exclusion zone. Continue atmospheric monitoring if personnel present. Record all readings on disinfection log sheet. Do not allow contact time to be interrupted or system to be used during this phase.
After contact time completion, neutralise chlorine if required for safe discharge. Add sodium thiosulphate solution (1g neutralises ~1.4g chlorine) or allow natural dissipation if time permits. Drain hyper-chlorinated water to foul sewer (with water company consent) or designated discharge point - never to surface water (H400 aquatic toxicity). Flush system thoroughly with mains water until chlorine residual at all outlets is <0.5 mg/l (safe for consumption per Water Supply Regulations). Measure chlorine at sentinel taps (furthest points). Dispose of contaminated PPE and cleaning materials as hazardous waste (EWC code 18-01-06*). Decontaminate reusable equipment. Ventilate tank/system for minimum 30 minutes after flushing.
Allow minimum 48 hours after flushing before post-disinfection microbiological sampling (allows bacterial regrowth detection). Take samples from same locations as pre-disinfection samples plus sentinel outlets. Submit to UKAS-accredited laboratory for Legionella culture (ISO 11731), total viable count at 22°C and 37°C, and temperature measurement. Acceptable results: Legionella <100 cfu/L (ideally not detected), TVC <1000 cfu/ml. If unsatisfactory, repeat disinfection. Once validated, remove LOTO devices, restore system to normal operation, remove warning signs, update log book and schematic drawings. Brief building occupants on return to service. Schedule next routine monitoring per L8 Written Scheme. Close out Permit to Work. File all records (disinfection log, test results, Permit) for minimum 5 years (L8 requirement).
EMERGENCY CONTACTS: Emergency services 999. Poison centre (NPIS) 0344 892 0111. HSE incident reporting (RIDDOR) 0345 300 9923. Company emergency contact: [Insert 24/7 number]. CHLORINE GAS RELEASE: Evacuate area immediately upwind. Activate fire alarm if building evacuation required. Call 999 (Fire & Rescue have gas-tight BA). Do not attempt rescue without BA. Ventilate area. CHEMICAL EXPOSURE - SKIN: Remove contaminated clothing. Drench affected area with water for minimum 15 minutes. Seek immediate medical attention (chemical burns worsen over time). EYES: Irrigate with eyewash or clean water for minimum 15 minutes, holding eyelids open. Remove contact lenses if present. Urgent medical attention required (risk of permanent damage). INHALATION: Move casualty to fresh air immediately. If breathing difficulties, administer oxygen if trained. Call 999. Monitor for delayed pulmonary oedema (can occur 24 hours post-exposure). INGESTION: Do NOT induce vomiting (corrosive). Rinse mouth with water. Give small amounts of water to drink. Call 999 immediately. CONFINED SPACE RESCUE: Do NOT enter without BA and rescue training (50% of fatalities are rescuers). Use tripod/winch to extract casualty. Call 999. Commence CPR if required. FIRST AID: First aiders must wear appropriate PPE before treating contaminated casualties. Decontaminate casualty before transport if safe to do so. Provide SDS to medical personnel. INCIDENT REPORTING: Report all exposures, near-misses, and RIDDOR injuries (>7 days incapacity, specified injuries, dangerous occurrences) to HSE within required timescales. Investigate root cause and update risk assessment.
HSG274 Part 2 (Cold Water Systems) specifies a minimum of 50 mg/l free chlorine for a contact time of at least 1 hour throughout the entire system. For heavily contaminated systems or where biofilm is present, higher concentrations (up to 100 mg/l) or extended contact times (2-4 hours or overnight) may be necessary. The chlorine residual must be maintained at the target concentration for the full duration - if it drops below 50 mg/l, supplementary dosing is required and the contact time restarts. Post-disinfection validation sampling must demonstrate Legionella <100 cfu/L (ideally not detected) and total viable count <1000 cfu/ml at 22°C. Temperature should be measured simultaneously. It is critical that the system remains isolated and out of service during the entire disinfection and flushing process to prevent user exposure to high chlorine concentrations.
The Confined Spaces Regulations 1997 apply to water storage tanks where there is a risk of serious injury from hazardous substances or conditions (oxygen deficiency, toxic gases, drowning). A Permit to Work system is mandatory. Before entry, a competent person must conduct atmospheric testing using a calibrated multi-gas monitor at multiple levels (top, middle, bottom) as gases stratify. Acceptable parameters are: oxygen 19.5-23%, chlorine <0.5 ppm (WEL 8-hr TWA), hydrogen sulphide <5 ppm, and lower explosive limit <10%. If unacceptable, forced mechanical ventilation (minimum 6 air changes per hour) must be established and the space re-tested. Continuous atmospheric monitoring with audible alarms is required throughout the work. A trained standby person must be present outside the space with emergency rescue equipment (tripod, winch, harness, communication system). The standby person must never enter to attempt rescue without breathing apparatus - 50% of confined space fatalities involve would-be rescuers. An emergency rescue plan must be in place and rehearsed. All personnel must be trained in confined space entry and rescue procedures.
Under the Health and Safety at Work Act 1974 and the Control of Substances Hazardous to Health (COSHH) Regulations 2002, the duty holder (employer, building owner, or person in control of the premises) is legally responsible for controlling Legionella risks. ACOP L8 paragraph 18 requires the duty holder to appoint a 'responsible person' with sufficient authority, competence, and resources to manage Legionella control. This person must ensure hyper-chlorination is carried out by competent operatives (typically holding City & Guilds Legionella Control qualification or Water Management Society certification) following the Written Scheme of Control. Records that must be retained for at least 5 years (L8 paragraph 232) include: pre- and post-disinfection microbiological test results, disinfection log sheets (date, time, chlorine concentrations, contact time, operative names), Permits to Work, COSHH assessments, training certificates, and any remedial actions taken. These records must be available for inspection by HSE or local authority enforcement officers. Failure to maintain adequate records or demonstrate competent management can result in prosecution under Section 37 of the Health and Safety at Work Act (personal liability for directors/managers) with unlimited fines and up to 2 years imprisonment.
Competent Person & Operative Declaration: By signing below, the Site Supervisor confirms this assessment has been adapted and verified for actual site conditions, and operatives confirm they have attended the pre-start Toolbox Talk for Cold Water Storage Tank & Cooling Tower Hyper-Chlorination Disinfection and will follow the safe system of work.
| Operative / Supervisor Name | Trade / Role & CSCS No. | Signature | Date & Time |
|---|---|---|---|
| 1. (Site Supervisor): | |||
| 2. | |||
| 3. | |||
| 4. | |||
| 5. | |||
| 6. |