This Standard Operating Procedure (SOP) provides comprehensive guidance for the safe isolation of Clean-in-Place (CIP) skid systems using double-block-and-bleed valve configurations, followed by chemical titration verification procedures. The document is designed for food and beverage manufacturing operations and ensures compliance with the Control of Substances Hazardous to Health Regulations 2002 (COSHH), Pressure Systems Safety Regulations 2000 (PSSR), and Provision and Use of Work Equipment Regulations 1998 (PUWER). This procedure addresses critical safety risks including chemical exposure to caustic and acidic cleaning agents, pressurised system hazards, and Lock-Out/Tag-Out (LOTO) requirements. The double-block-and-bleed isolation method provides positive isolation to prevent cross-contamination and protect personnel during maintenance, sampling, and verification activities. All personnel must be competent and trained in CIP operations, chemical handling, and isolation procedures before undertaking this work.
| Identified Hazard & Harm | Initial Risk (L×S) | Mandatory Engineering, Isolation & Procedural Controls | Residual Risk |
|---|---|---|---|
| 1. Exposure to corrosive CIP chemicals (caustic soda NaOH pH 13-14, nitric acid pH 1-2) during valve isolation, sampling and titration Harm: Severe chemical burns to skin and eyes, respiratory irritation, permanent scarring or blindness if splashed. Inhalation of vapours causing respiratory distress | 4 × 5 = 20 | COSHH assessment completed and reviewed annually. Mandatory chemical-resistant PPE (BS EN ISO 374-1 gloves, BS EN 166 face protection, BS EN ISO 13034 apron). Engineered sample points with drip trays. Emergency eyewash station within 10m (BS EN 15154). Neutralisation agents available. Closed sampling system to minimise exposure. Ventilation adequate (minimum 10 air changes/hour). SDS available at point of use. | 2 × 3 = 6 |
| 2. Pressurised system failure or uncontrolled release during isolation (CIP systems typically operate 2-6 bar) Harm: High-pressure chemical spray causing severe burns, eye injuries, or inhalation injuries. Potential for scalding if hot CIP solutions present (up to 85°C) | 3 × 5 = 15 | Double-block-and-bleed isolation procedure (positive isolation per PSSR 2000). Written scheme of examination for pressure systems current and valid. Pressure verification using calibrated gauge before breaking containment. Bleed valve opened to atmosphere to confirm zero pressure. Isolation valves locked in closed position with LOTO padlocks. Permit-to-Work system for invasive work. Pressure relief devices tested and certified. Operators trained to competent person standard (City & Guilds or equivalent). | 1 × 3 = 3 |
| 3. Inadequate isolation leading to cross-contamination or inadvertent system re-energisation during maintenance Harm: Chemical exposure to maintenance personnel, product contamination requiring batch rejection, potential allergen cross-contact in food production | 4 × 4 = 16 | Formal LOTO procedure per BS EN ISO 14118:2018. Unique personal padlocks (one person one lock one key principle). Group lockout box for multi-person tasks. Isolation verification checklist signed by Authorised Person. Visual confirmation of valve position indicators. Bleed valve discharge observed and sampled. Try-to-start verification after isolation. Isolation log maintained with date, time, operative name, and equipment ID. Isolation points clearly identified with P&ID reference tags. | 1 × 3 = 3 |
| 4. Manual handling of chemical containers, sampling equipment, and titration apparatus Harm: Musculoskeletal disorders (back strain, shoulder injury), dropped containers causing chemical spills and secondary exposure risks | 4 × 2 = 8 | Manual handling risk assessment completed per HSE guidance (MAC guidelines applied). Chemical containers limited to maximum 25kg or mechanical handling aids provided (trolleys, drum handlers). Two-person lift policy for containers >15kg. Ergonomic workstation design for titration bench (adjustable height 850-1050mm). Storage at appropriate height (waist to shoulder level). Training in safe manual handling techniques (refreshed every 3 years). Mechanical aids (pump dispensers) for decanting chemicals. | 2 × 2 = 4 |
| 5. Slips, trips and falls on wet surfaces from chemical spills, condensation, or CIP system leaks Harm: Fractures, head injuries, lacerations, secondary chemical exposure if falling into spilled chemicals | 4 × 3 = 12 | Anti-slip flooring installed (minimum R11 slip resistance rating per DIN 51130). Spill containment trays under all sample points and chemical storage. Immediate spill response procedure with absorbent materials and neutralising agents available. Housekeeping inspections daily with documented checklist. Adequate lighting (minimum 500 lux at task level per CIBSE guidelines). Designated walkways marked with yellow hatching. Drainage adequate to prevent pooling. Mandatory S5 SRC safety footwear (BS EN ISO 20345:2011). Wet floor signage deployed during CIP operations. | 2 × 2 = 4 |
Obtain valid Permit-to-Work from Production Supervisor or Authorised Person. Review CIP cycle schedule and confirm system is in standby or idle state (not mid-cycle). Check CIP control panel status indicators - all pumps stopped, no active alarms. Verify P&ID drawing reference number matches the physical equipment tags. Gather all required tools, equipment, and PPE listed in this SOP. Conduct pre-task toolbox talk with all personnel involved, discussing hazards and emergency procedures. Confirm emergency eyewash station is functional (weekly test record checked). Ensure mobile phone or radio communication available for emergency contact.
Don all mandatory PPE (chemical gloves, face shield, apron, safety footwear) before approaching valves. Identify the two isolation valves (upstream and downstream) and the central bleed valve on the P&ID and physically on the skid. Close the FIRST (upstream) block valve fully - turn clockwise until firm resistance (do not over-torque). Close the SECOND (downstream) block valve fully using same method. Apply personal LOTO padlock to BOTH block valves using lockout hasp if necessary. Attach completed danger tag with your name, date, time, and reason for isolation. Open the central BLEED valve slowly (quarter-turn initially) to depressurise the isolated section. Observe discharge from bleed valve - note colour, odour, and approximate volume. Allow minimum 2 minutes for complete pressure relief.
Connect calibrated pressure gauge to test point on isolated section (between the two block valves). Record pressure reading - must read ZERO bar gauge pressure. If pressure reading is above zero, do NOT proceed - investigate valve seating or leakage. Leave pressure gauge connected for continuous monitoring during sampling. Attempt to operate CIP pump from control panel (if accessible and safe to do so) to verify isolation effectiveness - pump should not pressurise isolated section. Document isolation verification on Isolation Certificate including: equipment ID, valve positions, pressure reading, date, time, and your signature. Place physical barrier (chain or tape) around isolated area with 'DO NOT OPERATE - ISOLATION IN PROGRESS' signage.
Position drip tray or chemical-resistant container under sample point on bleed valve. Slowly open bleed valve further to obtain flowing sample (approximately 100-200ml required). Collect sample in clean, dry, chemically-resistant sample bottle (HDPE or glass). Avoid splashing - control flow rate with valve position. If sampling caustic (NaOH), use plastic bottle; if sampling acid (HNO₃), glass is acceptable. Label sample bottle immediately with: chemical type, date, time, CIP skid ID, and your initials. Close bleed valve securely after sampling. Wipe external surfaces of sample bottle with damp cloth to remove any residual chemical. Place sample bottle in secondary containment tray for transport to titration area.
Transport sample to designated titration area with adequate ventilation and lighting. Set up burette stand with appropriate titrant (0.1M HCl for caustic samples, 0.1M NaOH for acid samples). Pipette 10ml of sample into clean conical flask using calibrated pipette. Add 2-3 drops of appropriate indicator (phenolphthalein for caustic, methyl orange for acid). Fill burette with standardised titrant solution, ensuring no air bubbles in tip. Record initial burette reading to nearest 0.05ml. Titrate slowly, swirling flask continuously, until permanent colour change observed (pink to colourless for caustic, red to yellow for acid). Record final burette reading. Calculate titre volume (final - initial reading). Repeat titration for duplicate sample to confirm result (results should agree within 0.2ml). Calculate chemical concentration using formula: Concentration (%) = (Titre volume × Titrant molarity × Molecular weight × 100) / (Sample volume × 1000). Compare result against CIP specification (typically 1.5-2.5% NaOH or 0.5-1.5% HNO₃).
Verify all sampling and titration activities are complete and results are satisfactory. Remove pressure gauge from test point and replace blanking cap or plug. Close bleed valve fully (clockwise until firm resistance). Remove physical barriers and signage from isolated area. Remove personal LOTO padlocks from both block valves - only the person who applied the lock may remove it. Open SECOND (downstream) block valve fully (anti-clockwise). Open FIRST (upstream) block valve fully (anti-clockwise). Verify system pressure returns to normal operating range on CIP control panel (typically 2-4 bar). Check for leaks at valve glands and sample points - tighten if necessary. Complete Permit-to-Work closure section with time of de-isolation and signature. Return Permit to issuer (Production Supervisor). Record all activities in CIP system log including isolation duration, titration results, and any observations. Clean and store all tools and equipment. Dispose of chemical samples and contaminated materials per site waste procedure (segregated hazardous waste stream).
EMERGENCY RESPONSE PROCEDURES: In the event of chemical splash to eyes: Immediately irrigate eyes at emergency eyewash station for minimum 15 minutes (hold eyelids open). Seek immediate medical attention - inform medical personnel of specific chemical involved (provide SDS). For chemical splash to skin: Remove contaminated clothing immediately. Rinse affected area with copious running water for minimum 15 minutes. For caustic burns, do NOT attempt to neutralise - water rinse only. Seek medical attention for all but minor exposures. For chemical ingestion: Do NOT induce vomiting. Rinse mouth with water (do not swallow). Seek immediate medical attention. For inhalation of chemical vapours: Move casualty to fresh air immediately. If breathing difficulties persist, administer oxygen if trained and available. Seek medical attention. For pressurised chemical release: Evacuate immediate area. Activate emergency alarm if major release. Approach from upwind if safe to isolate source. Use emergency shutdown button on CIP control panel if accessible. FIRST AID FACILITIES: Ensure first aid kit (BS 8599-1 compliant) is available within 50m. Emergency eyewash station must be within 10m of CIP area (BS EN 15154 compliant, weekly flush test documented). Emergency shower available within 25m for major body contamination. Trained first aiders available on each shift (minimum HSE Emergency First Aid at Work certificate). SPILL RESPONSE: For minor spills (<1 litre): Cordon area, don appropriate PPE, use spill kit absorbent materials and neutralising agents. For major spills (>1 litre): Evacuate area, activate emergency response team, notify Environmental Health & Safety department. Emergency contact numbers displayed prominently: Site Emergency: [Internal Extension], External Emergency Services: 999, Environmental Incident Hotline: [Site-specific number], Poison Information: NHS 111.
Under the Pressure Systems Safety Regulations 2000, all pressure systems (including CIP skids operating above 0.5 bar) must have a written scheme of examination prepared or certified by a competent person. The competent person is typically an engineering insurance company inspector, or an in-house engineer with appropriate qualifications (e.g., pressure systems engineering degree or equivalent) and experience. The written scheme specifies the nature and frequency of examinations (typically annually for CIP systems, but risk-based intervals may be shorter). Examinations must be carried out within the intervals specified in the scheme, and a report of examination must be provided within 28 days. The duty holder (employer) must not operate the system if the examination is overdue or if the report identifies imminent danger. Records of examination must be retained until the next examination is completed, plus two years. Failure to comply with PSSR 2000 is a criminal offence prosecutable by HSE, with potential for unlimited fines and imprisonment for serious breaches.
Double-block-and-bleed isolation is considered positive isolation when both block valves are fully closed and the bleed valve between them is open to atmosphere, with zero pressure confirmed by gauge. To verify effectiveness: (1) Close both block valves, (2) Open bleed valve and observe discharge until flow stops, (3) Connect calibrated pressure gauge to test point - reading must be zero, (4) Leave bleed valve open during work to provide visible indication of any leakage (if fluid discharges from bleed valve, isolation has failed). If you discover a block valve is leaking (indicated by continued discharge from bleed valve or positive pressure reading): STOP work immediately, do NOT break containment, maintain LOTO, notify supervisor and maintenance immediately. The leaking valve requires maintenance (re-seating, seal replacement, or valve replacement). A single block valve with a leaking seat does NOT provide adequate isolation. Alternative isolation methods must be used: install a blank/spade flange, use a different isolation point, or drain and depressurise the entire system. Never rely on a single valve for isolation when working on pressurised chemical systems - this violates the hierarchy of controls and exposes workers to unacceptable risk.
Under COSHH Regulation 11, health surveillance is required when: (1) exposure to a hazardous substance is such that an identifiable disease or adverse health effect may be related to the exposure, (2) there is a reasonable likelihood that the disease or effect may occur under the particular conditions of work, and (3) there are valid techniques for detecting indications of the disease or effect. For CIP chemicals (caustic soda, nitric acid, phosphoric acid), health surveillance is generally required if there is potential for significant or repeated exposure, particularly respiratory exposure to mists or vapours. The COSHH assessment must determine if exposure is adequately controlled below the Workplace Exposure Limit (WEL) - if controls are effective and exposure is minimal (as intended with this SOP's controls), health surveillance may not be necessary. However, for operatives performing CIP isolation and sampling daily or multiple times per week, health surveillance is recommended and typically includes: (1) Pre-placement health questionnaire and examination focusing on respiratory and skin conditions, (2) Periodic skin inspections (6-12 monthly) by occupational health professional to detect dermatitis or chemical burns, (3) Respiratory symptom questionnaire (annually) to detect occupational asthma or chronic bronchitis. Records must be kept for 40 years (or 5 years after last entry if exposure ceased). Operatives must be informed of health surveillance results and any health concerns identified. If health surveillance identifies work-related ill health, the COSHH assessment must be reviewed and additional controls implemented.
Competent Person & Operative Declaration: By signing below, the Site Supervisor confirms this assessment has been adapted and verified for actual site conditions, and operatives confirm they have attended the pre-start Toolbox Talk for Clean-in-Place (CIP) Skid Double-Block-and-Bleed Valve Isolation & Titration Check and will follow the safe system of work.
| Operative / Supervisor Name | Trade / Role & CSCS No. | Signature | Date & Time |
|---|---|---|---|
| 1. (Site Supervisor): | |||
| 2. | |||
| 3. | |||
| 4. | |||
| 5. | |||
| 6. |