SafeSequence › UK Safety Template Library › Roofing & Waterproofing › Flat Roof Torch-On Bitumen Membrane Installation & Hot Works Permit
Verified UK RAMS Standard • Roofing & Waterproofing

Flat Roof Torch-On Bitumen Membrane Installation & Hot Works Permit (RAMS Template & 5x5 Risk Assessment)

This Risk Assessment and Method Statement (RAMS) provides comprehensive safety controls for the installation of torch-on bitumen membrane systems on flat roofs, incorporating hot works permit requirements. The document addresses key UK legislation including the Work at Height Regulations 2005, Dangerous Substances and Explosive Atmospheres Regulations (DSEAR) 2002, and HSG33 Health and Safety in Roof Work. All operatives must hold valid CSCS cards, IPAF/PASMA certification where applicable, and have completed hot works training. A valid Hot Works Permit must be obtained before commencing any torch-on operations. This RAMS covers edge protection, fire prevention, LPG gas handling, working platform integrity, and emergency procedures. The Principal Contractor must ensure all control measures are implemented and monitored throughout the works.

Statutory FrameworkWork at Height Regulations 2005, DSEAR 2002, HSG33 Health and Safety in Roof Work
ClassificationLPG (Propane) cylinders used for torch application: UN 1978, Class 2.1 Flammable Gas. GHS02 Flame pictogram. H220: Extremely flammable gas. H280: Contains gas under pressure; may explode if heated. Store cylinders upright in well-ventilated external compound, minimum 3m from ignition sources and combustible materials. Maximum 2 cylinders on roof at any time. Bitumen products may emit hazardous fumes when heated (PAHs, hydrogen sulphide). Ensure adequate ventilation and respiratory protection as per COSHH assessment.
Required Plant / KitPropane gas torch with pressure regulator and flashback arrestor (BS EN ISO 9539 compliant) • Edge protection system - guardrails to BS EN 13374 Class A minimum 950mm height with toeboards • Mobile scaffold tower or MEWP (3.5kV rated) with outriggers and platform guardrails • Fire extinguishers: 2 x 9kg dry powder (Class A, B, C rated) and fire blanket positioned at access points • Gas leak detection spray/solution and calibrated LPG gas detector with audible alarm
Review Cycle12 Months / Post-Incident
Instant AI Customization or Free Blank Word (.doc) Download

Need this RAMS customized with your Company Name, Site Postcode & Nearest A&E Hospital?

Dictate your site specifics on your phone in 45 seconds to auto-compile a signed PDF—or download our free blank Word (.doc) shell below.

Auto-Fill via Voice / CLP (45s)

2. 5×5 Hazard Risk Assessment Matrix (HASAWA 1974 / MHSWR 1999)

Identified Hazard & HarmInitial Risk (L×S)Mandatory Engineering, Isolation & Procedural ControlsResidual Risk
1. Falls from height during membrane installation on flat roof (working at 6m above ground level)
Harm: Fatal or life-changing injuries including spinal fractures, traumatic brain injury, multiple fractures, permanent disability
4 × 5 = 20Install BS EN 13374 Class A collective edge protection (guardrails, mid-rails, toeboards) to all roof perimeters before any work commences. Minimum 950mm height guardrail. Scaffold inspection by competent person (CISRS) with handover certificate. Exclusion zone 3m from roof edge marked with barrier tape. Roof access via fixed scaffold stair tower only - ladders prohibited for material access. Harness and lanyard as secondary protection when within 2m of edges. Rescue plan in place with trained rescue team identified.2 × 5 = 10
2. Fire and explosion risk from LPG torch igniting combustible materials, gas leaks, or uncontrolled flame during bitumen application
Harm: Severe burns (full thickness), explosion causing multiple casualties, structural fire, smoke inhalation, death
4 × 5 = 20Hot Works Permit obtained and displayed - valid for single shift only. Pre-work inspection: remove all combustible materials within 10m radius, cover timber joists/decking with non-combustible mats. LPG cylinders stored upright in external compound, maximum 2 cylinders on roof, secured in purpose-built trolley. Flashback arrestor fitted to torch regulator (mandatory). Dedicated fire watch operative with extinguisher during works and 60-minute cool-down period post-work. Gas isolation valve accessible. Torch never left unattended when lit. Atmospheric monitoring for gas leaks before and during work.2 × 4 = 8
3. Inhalation of toxic fumes from heated bitumen (PAHs, hydrogen sulphide, volatile organic compounds)
Harm: Respiratory irritation, occupational asthma, long-term lung disease, carcinogenic exposure, acute poisoning, loss of consciousness
4 × 3 = 12COSHH assessment completed and communicated in toolbox talk. Work positioning to remain upwind of fumes where possible. Mandatory use of FFP3 respirators (BS EN 149:2001+A1:2009) when applying membrane in confined/poorly ventilated areas. Rotate operatives every 2 hours to limit exposure. Health surveillance programme for regular torch operatives (annual respiratory function tests). Ensure natural ventilation; mechanical extraction if working in enclosed areas. Welfare facilities with washing facilities available. No eating/drinking/smoking in work area.2 × 3 = 6
4. Manual handling injuries from lifting bitumen rolls (typically 25-40kg), LPG cylinders (19kg), and repetitive bending/kneeling during membrane laying
Harm: Musculoskeletal disorders, acute back injury (prolapsed disc), shoulder/knee injuries, long-term chronic pain, incapacity
5 × 3 = 15Mechanical lifting aids mandatory: use MEWP or goods hoist for material delivery to roof level - manual carrying up ladders/stairs prohibited. Team lifting (minimum 2 operatives) for bitumen rolls and cylinders with clear communication protocol. Trolleys provided for horizontal movement of materials on roof. Pre-work stretching routine and manual handling refresher training. Task rotation every 90 minutes to vary physical demands. Knee pads (BS EN 14404:2004+A1:2010 Type 2 Level 1) provided for kneeling tasks. Ergonomic torch handle design to reduce wrist strain.3 × 2 = 6
5. Contact burns from torch flame (1,800°C), molten bitumen (230°C+), hot membrane, or heated substrate surfaces
Harm: Full-thickness burns requiring skin grafts, permanent scarring, nerve damage, shock, infection, prolonged hospitalization
4 × 4 = 16Operatives must hold valid Hot Works Operative certification. Heat-resistant PPE mandatory: BS EN 407 Level 3 gloves, flame-retardant coveralls (BS EN ISO 11612:2015), HRO-rated footwear. Torch ignition procedure: open cylinder valve slowly, ignite torch away from body/materials, adjust flame to blue cone (not yellow/sooty). Establish 'hot zone' marked with barriers - only trained torch operatives permitted entry. Cool-down period: allow membrane to cool for minimum 10 minutes before contact. Burn gel and sterile dressings in first aid kit. Emergency cold water supply identified pre-start (20-minute irrigation requirement for burns).2 × 3 = 6

3. Step-by-Step Safe Sequence of Operations & Hold-Points

1

Site Setup, Hot Works Permit Issue & Roof Access Preparation

Pre-Start Preparation & Permit Authorisation

Conduct site-specific induction and toolbox talk covering emergency procedures, fire assembly point, and permit conditions. Obtain and display valid Hot Works Permit signed by Responsible Person - confirm permit conditions including fire watch duration and extinguisher locations. Erect exclusion zone at ground level (minimum 5m perimeter) with signage 'Roof Work in Progress - Hard Hat Area'. Inspect and certify edge protection system - guardrails to all roof perimeters, minimum 950mm height with mid-rails and toeboards. Check weather conditions: wind speed below 12 m/s (Beaufort Scale 6), no rain forecast, temperature above 5°C. Establish secure material storage area on roof with segregation of LPG cylinders (minimum 3m from work area). Confirm emergency rescue equipment available and rescue team briefed.

Critical Hold-Point: HOLD POINT: Do NOT proceed until Hot Works Permit is signed and displayed, edge protection is certified by competent person with handover certificate, and weather conditions are confirmed suitable. Permit Authoriser must verify fire extinguishers in place and fire watch operative identified.
2

Roof Surface Preparation, Combustible Material Removal & Fire Safety Setup

Substrate Preparation & Fire Prevention Measures

Inspect roof substrate for structural integrity, moisture, and debris. Remove all combustible materials within 10m radius of hot works area (packaging, timber offcuts, vegetation). Sweep roof surface clean and ensure drainage outlets are clear. Cover any exposed timber joists, insulation, or combustible decking with non-combustible protection mats or metal sheets. Position 2 x 9kg dry powder fire extinguishers at designated access/egress points (maximum 10m travel distance). Place fire blanket at torch operation area. Identify and mark location of emergency gas isolation valve with high-visibility signage. Conduct pre-work atmospheric monitoring for gas leaks using calibrated detector. Establish communication protocol between torch operative and fire watch (radio or visual signals). Confirm first aider on site with burn treatment capability.

Critical Hold-Point: HOLD POINT: Fire watch operative must be in position with extinguisher before any LPG cylinders are brought to roof level. Permit Authoriser must verify 10m combustible-free zone and approve fire prevention measures before gas connection.
3

Safe Gas Cylinder Handling, Torch Assembly & Controlled Ignition

LPG System Setup & Torch Ignition

Transport maximum 2 x LPG cylinders to roof using MEWP or goods hoist - never manually carry up stairs/ladders. Secure cylinders upright in purpose-built trolley with chain restraint, positioned minimum 3m from roof edge and ignition sources. Inspect cylinder valves, hoses, and connections for damage or wear - reject any defective equipment. Attach pressure regulator to cylinder valve, ensuring correct thread engagement (left-hand thread). Fit mandatory flashback arrestor between regulator and torch hose. Check all connections with gas leak detection solution - no bubbles indicate gas-tight seal. Open cylinder valve slowly (anti-clockwise) one full turn. Ignite torch using spark lighter (never matches/cigarette lighter) with flame directed away from body and materials. Adjust flame to achieve tight blue cone approximately 150mm length - yellow/sooty flame indicates incomplete combustion (re-adjust). Conduct test application on sample membrane away from main work area to confirm correct temperature and technique.

Critical Hold-Point: CRITICAL: Flashback arrestor is MANDATORY and must be inspected before each use. If flashback occurs (flame travels back into hose with whistling sound), immediately close cylinder valve and evacuate area. Do not re-use equipment until inspected by competent person. Never use damaged or kinked hoses.
4

Torch-On Bitumen Membrane Installation with Continuous Fire Watch

Membrane Application & Hot Works Execution

Position first membrane roll at lowest point of roof with 150mm overhang at edges. Unroll 500mm of membrane to check alignment before bonding. Apply torch flame to underside of membrane and substrate simultaneously, maintaining 200-300mm distance, moving torch in sweeping motion to achieve even heat distribution. Look for 'melt line' (50-75mm of molten bitumen visible at roll edge) as indicator of correct bonding temperature. Roll membrane forward progressively as bitumen melts, using roller to ensure full adhesion and remove air pockets. Overlap subsequent sheets by minimum 100mm side laps and 150mm end laps. Fire watch operative maintains constant observation, positioned with clear view of work area and extinguisher within immediate reach. Rotate torch operative every 2 hours maximum to manage fume exposure and physical fatigue. Monitor weather conditions continuously - cease work if wind speed exceeds limits or rain commences. Keep work area clear of tripping hazards (hoses, tools, offcuts).

Critical Hold-Point: CRITICAL: Never leave lit torch unattended - if operative must leave work area, extinguish flame and close cylinder valve. Fire watch must maintain continuous observation during ALL hot works - no distractions or dual tasking. If any smoke, scorching, or ignition occurs, immediately extinguish torch and deploy fire extinguisher.
5

Upstand Flashing, Penetration Sealing & Edge Detail Completion

Detail Work & Penetration Sealing

Apply membrane to vertical upstands (parapets, abutments) ensuring minimum 150mm height coverage. Use additional heat to achieve full adhesion on vertical surfaces, working from bottom upward to prevent air trapping. Seal around roof penetrations (vents, pipes, outlets) using pre-formed collars or cut membrane pieces with minimum 150mm overlap. Apply metal flashing or trim where specified, mechanically fixed with appropriate fasteners. Dress membrane into internal and external corners using careful torch application to avoid overheating and bitumen run-off. Inspect all laps and joints for complete adhesion - re-heat and roll any areas showing lifting or air pockets. Trim excess membrane at edges using sharp knife, maintaining specified overhang dimensions. Enhanced fire watch vigilance required during detail work due to proximity to combustible building elements (timber fascias, soffits). Ensure adequate ventilation if working near enclosed areas.

Critical Hold-Point: HOLD POINT: Supervisor must inspect all critical details (penetrations, upstands, laps) before proceeding to final phase. Pay particular attention to areas where membrane meets combustible materials - use heat-resistant barriers and reduce torch temperature. Do not overheat membrane (causes blistering and degradation).
6

Safe Gas Isolation, 60-Minute Fire Watch & Site Reinstatement

Shutdown, Cool-Down & Post-Work Fire Watch

Extinguish torch flame and immediately close LPG cylinder valve fully (clockwise). Bleed residual gas from hose by briefly re-opening torch valve until flame extinguishes naturally. Allow torch head to cool for minimum 15 minutes before handling - place on non-combustible surface away from membrane. Disconnect regulator and flashback arrestor, inspect for damage, and store in designated container. Remove LPG cylinders from roof using mechanical means - return to external storage compound and secure with chain/strap. Fire watch operative conducts detailed inspection of entire work area and 10m radius, checking for smoldering materials, hot spots, or smoke. Use thermal imaging camera if available to detect hidden heat sources. Maintain fire watch for minimum 60 minutes after final torch extinguishment as per Hot Works Permit conditions. Remove waste materials (offcuts, packaging) to designated skip - do not leave on roof overnight. Inspect edge protection remains secure. Complete Hot Works Permit closure section and return to Permit Authoriser. Conduct end-of-shift toolbox talk reviewing any incidents or near-misses.

Critical Hold-Point: CRITICAL: 60-minute fire watch is MANDATORY and non-negotiable - fires can develop hours after hot works cease. Fire watch operative must remain on site with extinguisher and must not be reassigned to other duties. If any heat, smoke, or unusual odors detected during fire watch, immediately investigate and deploy extinguisher if necessary. Notify site management of any concerns before leaving site.

Emergency Rescue, First Aid & Spill Protocol

EMERGENCY CONTACTS: Site Manager [insert mobile], First Aider [insert name/location], Emergency Services 999. FIRE: Raise alarm immediately, activate fire assembly procedure, deploy extinguisher only if safe to do so (Class B/C rated for LPG/bitumen fires). If fire involves LPG cylinder, evacuate to minimum 100m radius and call Fire Brigade - do NOT attempt firefighting. Close gas isolation valve if safe to approach. FALL FROM HEIGHT: Do not move casualty. Call 999 immediately, request ambulance and specialist rescue if person suspended in harness. Trained rescue team to implement emergency rescue plan within 15 minutes to prevent suspension trauma. Maintain airway and monitor consciousness. BURNS: Remove casualty from heat source. Cool affected area with running water for minimum 20 minutes. Remove jewelry/watches before swelling occurs. Cover burn with sterile non-adhesive dressing or cling film. Do NOT apply creams/ointments. Treat for shock. Call 999 for burns larger than palm of hand or full-thickness burns. GAS LEAK/INHALATION: Evacuate area immediately upwind. Close cylinder valve if safe. No ignition sources. Ventilate area. If person overcome by fumes, move to fresh air, loosen clothing, monitor breathing. Administer oxygen if trained and available. Call 999 if unconscious or breathing difficulties persist. FIRST AID: Appointed First Aider on site with HSE-approved training (minimum FAW 3-day certificate). First aid kit located [insert location] containing burn gel, sterile dressings, eye wash, resuscitation shield. Accident book available for all incidents/near-misses. Report all accidents to Site Manager and HSE under RIDDOR if specified injury or 7-day absence occurs.

4. UK HSE Compliance FAQs: Flat Roof Torch-On Bitumen Membrane Installation & Hot Works Permit

5. Operative Toolbox Talk & Competent Person Sign-Off Register

Competent Person & Operative Declaration: By signing below, the Site Supervisor confirms this assessment has been adapted and verified for actual site conditions, and operatives confirm they have attended the pre-start Toolbox Talk for Flat Roof Torch-On Bitumen Membrane Installation & Hot Works Permit and will follow the safe system of work.

Operative / Supervisor Name Trade / Role & CSCS No. Signature Date & Time
1. (Site Supervisor):     
2.     
3.     
4.     
5.     
6.     

Related UK Safety Templates & Risk Assessments