This Risk Assessment and Method Statement (RAMS) provides comprehensive safety controls for the replacement of bag filters, drive belts, and supply fans on rooftop air handling units (AHUs). The work involves working at height, mechanical isolation under LOTO procedures, manual handling of components, and exposure to accumulated dust and biological contaminants. All activities comply with PUWER 1998, Work at Height Regulations 2005, COSHH 2002, and BS 7671 electrical isolation standards. The document establishes a safe system of work incorporating permit-to-work procedures, edge protection, mechanical isolation verification, and controlled access to energised equipment. Residual risks are reduced to tolerable levels through engineering controls, procedural safeguards, and competent person supervision.
| Identified Hazard & Harm | Initial Risk (L×S) | Mandatory Engineering, Isolation & Procedural Controls | Residual Risk |
|---|---|---|---|
| 1. Falls from height during rooftop access and AHU maintenance Harm: Fatal or life-changing injuries from falls exceeding 2m; fractures, head trauma, spinal injuries | 4 × 5 = 20 | Collective edge protection installed per Work at Height Regulations 2005 Schedule 2. Safe access route established with fixed ladder/stairwell. Anchor points tested to 12kN per BS EN 795. Harness and lanyard inspection before use. Exclusion zone established below work area. Weather monitoring - cease work in wind speeds >12 m/s or wet/icy conditions. Competent person supervision. | 2 × 4 = 8 |
| 2. Contact with rotating machinery - fan blades, drive belts, pulleys during operation or unexpected start-up Harm: Amputation, crush injuries, entanglement, severe lacerations, fatality | 3 × 5 = 15 | Full LOTO isolation per BS EN ISO 14118 before access. Electrical isolation at local isolator and main distribution board with personal padlocks applied. Mechanical isolation of dampers. Zero energy verification using calibrated voltage detector (GS38). Permit-to-work system with authorised person sign-off. Guards removed only after isolation verified. Test run conducted with all personnel clear and guards reinstated. | 1 × 4 = 4 |
| 3. Exposure to biological agents (Legionella, bacteria, fungi) and accumulated dust within AHU Harm: Legionnaires' disease, respiratory infections, occupational asthma, allergic reactions | 3 × 4 = 12 | COSHH assessment completed. FFP3 respiratory protection mandatory during filter removal. HEPA vacuum used - no dry brushing or compressed air. Contaminated filters double-bagged and sealed immediately. Hands washed before breaks. AHU pre-cleaned if heavy contamination identified. Operatives briefed on Legionella symptoms. Work area ventilated. Waste disposed per Hazardous Waste Regulations 2005. | 2 × 3 = 6 |
| 4. Manual handling of heavy components - supply fan assemblies (up to 50kg), filter banks, motor units Harm: Musculoskeletal disorders, back injuries, hernias, crush injuries to hands/feet from dropped loads | 4 × 3 = 12 | Manual Handling Operations Regulations 1992 assessment completed. Team lift (minimum 2 persons) for components >25kg. Mechanical aids used where practicable - trolley/hoist. Clear lifting route established. Components positioned at waist height where possible. Kinetic lifting techniques briefed. Anti-slip footwear worn. Adequate lighting (minimum 200 lux). Rest breaks scheduled. | 2 × 2 = 4 |
| 5. Electrical shock from residual voltage or inadvertent re-energisation during maintenance Harm: Electrocution, cardiac arrest, severe burns, secondary fall from height due to shock | 2 × 5 = 10 | Electrical isolation by competent person (BS 7671 18th Edition). Isolator locked-off with personal padlock and danger tag. Voltage verification at point of work using GS38 approved detector on all phases and neutral. Capacitor discharge time observed (minimum 5 minutes). Isolation log maintained. Re-energisation only after permit closure and all personnel accounted for. Test run supervised by electrical competent person. | 1 × 5 = 5 |
Conduct site-specific induction and toolbox talk covering hazards, emergency procedures, and weather conditions. Establish safe rooftop access route and erect edge protection/guardrails to Work at Height Regulations 2005 standards. Test anchor points to 12kN. Establish exclusion zone with barriers and signage. Obtain Permit-to-Work from Authorised Person. Implement full LOTO: isolate electrical supply at local isolator and distribution board, apply personal padlocks and danger tags, close and lock mechanical dampers. Verify zero energy state using calibrated voltage detector (GS38) on all phases. Wait minimum 5 minutes for capacitor discharge. Display 'Men at Work' signage at AHU and isolators.
Don full PPE including FFP3 respirator, safety helmet, cut-resistant gloves, and harness connected to tested anchor point. Remove AHU access panels using appropriate hand tools - store fasteners safely. Conduct visual inspection of internal condition and contamination levels. If heavy biological contamination or standing water observed, escalate to supervisor for enhanced COSHH controls. Photograph existing installation for reference during reassembly. Identify filter bank locations, belt drive arrangement, and fan mounting configuration. Verify component part numbers against maintenance schedule.
Using HEPA vacuum, carefully clean around filter frames to prevent dust dispersion. Release filter clamps/retaining mechanisms. Carefully withdraw bag filters from housing - avoid tearing filter media. Immediately double-bag each filter in heavy-duty polythene bags and seal. Label bags as contaminated waste. Use team lift if filter banks exceed 25kg. HEPA vacuum filter housing internals - do not use compressed air or dry brushing. Inspect filter sealing surfaces for damage. Clean gasket seating areas with damp cloth. Stage new filters adjacent to installation point - verify correct size and specification (MERV/EN779 rating).
Photograph belt routing and pulley alignment for reassembly reference. Loosen motor mounting bolts and slide motor on adjustment rails to release belt tension. Remove drive belts and inspect pulleys for wear/damage. Using calibrated torque wrench, progressively loosen fan mounting bolts in cross-pattern. Support fan assembly with second person - fan units can exceed 40kg. Carefully withdraw fan assembly from housing, protecting fan blades from impact. Inspect fan blades for damage, erosion, or imbalance. Clean fan shaft and bearing housing. Stage new fan assembly and belts in clean area. Verify new fan rotation direction marking and electrical connection requirements.
Install new bag filters ensuring correct orientation (airflow direction arrows). Secure filter clamps and verify gasket sealing - no bypass gaps. Position new supply fan assembly into housing with two-person lift. Align mounting holes and install bolts finger-tight. Using calibrated torque wrench, tighten fan mounting bolts to manufacturer's specification (typically 40-60 Nm) in cross-pattern sequence. Install new drive belts over pulleys - verify correct belt profile and length. Adjust motor position to achieve correct belt tension per manufacturer's specification (typically 10-15mm deflection at mid-span). Tighten motor mounting bolts to specified torque. Verify pulley alignment using straight edge - misalignment causes premature belt failure.
Conduct final inspection: verify all tools removed, guards reinstated, access panels secured, no foreign objects in AHU. All personnel clear of AHU and in visual contact. Remove LOTO padlocks in reverse sequence - only person who applied lock may remove it. Authorised Person re-energises system. Conduct supervised test run: monitor for abnormal noise, vibration, or belt tracking issues. Verify correct fan rotation direction. Check motor current draw against nameplate rating. Measure airflow at grilles if test equipment available. Monitor for 15 minutes continuous operation. Check filter seating - no bypass or air leakage. Complete permit closure documentation. Remove exclusion zone barriers. Conduct post-work debrief and update maintenance log.
**Emergency Contacts:** - Emergency Services: 999 - Site First Aider: [Insert name and contact] - Duty Manager: [Insert contact] - HSE Incident Reporting: [Insert number] **Emergency Procedures:** **Fall from Height:** Do not move casualty unless in immediate danger. Call 999 immediately. Maintain airway and monitor breathing. Treat for shock. Administer first aid only if trained. Preserve fall arrest equipment for investigation. **Electrical Shock:** Do NOT touch casualty if still in contact with live conductor. Isolate power source immediately. Call 999. If casualty not breathing, commence CPR if trained. Treat burns with cool running water. All electrical shocks must be reported and medically assessed even if injury appears minor. **Respiratory Distress/Dust Exposure:** Move casualty to fresh air immediately. Loosen tight clothing. If breathing difficulties persist, call 999. Monitor for delayed symptoms. Seek medical attention if symptoms develop - inform medical staff of potential Legionella exposure. **Crush Injury/Amputation:** Call 999 immediately. Control bleeding with direct pressure using clean dressing. Do not remove embedded objects. Treat for shock. Preserve amputated parts in clean sealed bag, kept cool but not frozen. Do not attempt to move heavy machinery trapping casualty - await emergency services with hydraulic rescue equipment. **First Aid Equipment:** Fully stocked HSE-compliant first aid kit available at site access point. Eye wash station available. Nearest Accident & Emergency department: [Insert location]. All incidents requiring first aid treatment must be recorded in accident book (BI 510) and reported to HSE under RIDDOR 2013 if specified injury or 7+ day absence results.
Under PUWER 1998 Regulation 19 (isolation from sources of energy), all appropriate measures must be taken to ensure machinery is isolated from all energy sources before maintenance work begins. This requires: (1) Electrical isolation at both local isolator and distribution board with application of personal LOTO padlocks per BS EN ISO 14118; (2) Verification of zero energy state using calibrated voltage detection equipment compliant with GS38 on all phases and neutral; (3) Mechanical isolation of dampers and moving parts; (4) Observance of capacitor discharge time (minimum 5 minutes); (5) Use of Permit-to-Work system with Authorised Person sign-off; (6) Display of danger tags and 'Men at Work' signage. Only the person who applied the lock may remove it. Re-energisation is only permitted after all personnel are accounted for and the permit is formally closed. Failure to implement adequate isolation can result in prosecution under Section 33 of HSWA 1974 with unlimited fines.
Work at Height Regulations 2005 Regulation 6 requires work to be properly planned, supervised by competent persons, and conducted with hierarchy of controls: (1) AVOID work at height where reasonably practicable; (2) Use collective fall prevention (edge protection, guardrails, toe boards per Schedule 2) in preference to personal fall protection; (3) Mitigate distance/consequences of falls through fall arrest systems (harness, lanyard, anchor points tested to 12kN per BS EN 795). For rooftop AHU access: establish safe access route via fixed ladder/stairwell (not portable ladders for regular maintenance); erect collective edge protection around work area; provide anchor points for harness attachment; conduct weather monitoring (cease work in wind >12 m/s or wet/icy conditions); establish exclusion zone below; ensure rescue plan is in place. All equipment must be inspected before use and formally examined every 6 months per Regulation 12. Competent person must supervise all work at height activities.
Under COSHH 2002 and the Control of Legionella Bacteria in Water Systems (L8), a specific COSHH assessment must be completed before accessing AHU internals. Key controls include: (1) Respiratory protection - FFP3 disposable respirators (BS EN 149:2001+A1:2009) mandatory during filter removal and internal access to protect against biological agents including Legionella spp., bacteria, fungi, and particulate matter; (2) Wet cleaning methods or HEPA-filtered vacuum (H13 minimum) - compressed air and dry brushing are prohibited as they aerosolise contaminants; (3) Immediate double-bagging and sealing of contaminated filters - dispose as hazardous waste per Hazardous Waste Regulations 2005; (4) Hand hygiene - wash before breaks and eating; (5) Health surveillance if repeated exposure occurs; (6) Operatives briefed on Legionella symptoms (flu-like illness, high fever, cough) and instructed to seek immediate medical attention if symptoms develop within 14 days, informing medical staff of potential exposure. If heavy contamination or standing water is present, enhanced controls including pre-cleaning and potentially RPE upgrade to powered respirator may be required.
Competent Person & Operative Declaration: By signing below, the Site Supervisor confirms this assessment has been adapted and verified for actual site conditions, and operatives confirm they have attended the pre-start Toolbox Talk for Rooftop Air Handling Unit (AHU) Bag Filter, Belt & Supply Fan Replacement and will follow the safe system of work.
| Operative / Supervisor Name | Trade / Role & CSCS No. | Signature | Date & Time |
|---|---|---|---|
| 1. (Site Supervisor): | |||
| 2. | |||
| 3. | |||
| 4. | |||
| 5. | |||
| 6. |